Partly backed by the reference mandate, otherwise programme-level expertise.
Municipal heat planning, decarbonisation roadmaps and the gas network transformation plan force utilities to rethink two networks at once. We bring the data basis, network optimisation and the deadlines from WPG, BEW and the EnWG gas package into one programme that looks at the heat and gas divisions together.
AI lowers return temperatures in heat networks, forecasts the load and delivers the data foundation for the transformation plan under Section 32 WPG.
Read →Germany's May 2026 WPG amendment creates the heat planning data space, a nationwide IT infrastructure for municipal heat planning. What it means for utilities.
Read →Aquifer and pit thermal stores shift summer heat into winter. Why forecasting and MPC are what make seasonal storage pay off.
Read →In a hybrid energy centre the software decides which unit runs. How forecasting, thermal storage and MPC cut costs by up to 27 percent.
Read →The digital heat cadastre is the data foundation of municipal heat planning. How GIS, LoD2 building data and Section 11 WPG work together, and what matters in 2026.
Read →The last scheduled innovative CHP tender has run, and no rules cover 2026. What the regulatory gap means for district heating, investment and digital control.
Read →Germany's environment agency launches the heat and cooling guarantees of origin register in 2026. What the GWKHV means for district heating and green heat.
Read →Fifth-generation heat networks only work with digital control: sensors, AI load forecasting and model-predictive control, plus German pilot projects.
Read →The AVBFernwärmeV reform reshapes district-heating price-adjustment clauses: cost element, market element from the Destatis heat-price index CC13-77 and new digital transparency duties.
Read →From 1 April 2026 the BEW stops funding transformation plans. What the new BAFA guidance changes, what stays eligible and which deadline applies.
Read →Large heat pumps and power-to-heat decarbonise district heating: the heat pump supplies the base load from ambient heat, the electrode boiler the flexible peak from surplus power. What heat sources, flagship projects, the Geothermal Acceleration Act and BEW funding mean.
Read →By 30 June 2026, 84 large German cities over 100,000 inhabitants must deliver a municipal heat plan. What the WPG's four-step method, the zoning into district-heating, review and decentralised areas and the link to the Building Energy Act mean for utilities.
Read →Operators of existing heat networks must submit a decarbonisation roadmap under section 32 WPG by 31 December 2026. What the targets (30 percent green from 2030, 80 percent from 2040, climate-neutral by 2045), the Annex 3 content and the BEW route mean for utilities.
Read →The gas network area transformation plan maps conversion, repurposing and decommissioning of gas distribution grids toward hydrogen.
Read →The EnWG amendment 2026 transposes the EU gas and hydrogen package, with hydrogen network regulation and unbundling.
Read →The BNetzA ZuBio ruling reorders biogas grid access from 2026, but the grid connection stays a regulatory gap with a transition until the end of 2026.
Read →Discover how municipal utilities use digital twins for the energy transition. Learn how virtual replicas optimize district heating networks and enable climate neutrality by 2035.
Read →How Digital Twin and AI technology support utility companies in district heating optimization. 20% cost reduction, up to 40% CO2 reduction and intelligent network control with Gradyent.ai solutions.
Read →