Digitalising the energy transition

Backed by delivered scope in our reference mandate.

Rollout quotas, supervisory proceedings, gateway administration and control under §14a EnWG run in parallel and depend on each other. We connect rollout, gateway, control box and meter data processing into one programme that holds up technically and meets the metering operator's obligations on time.

Services for this field

Articles in this field (18)

23 August 2026 · 8 min read

Virtual Sum Meter: Tenant Electricity in Apartment Buildings

The virtual sum meter and Solar Package I make tenant electricity in apartment buildings affordable: metering concept, GGV under section 42b EnWG and rollout explained.

Read →

28 June 2026 · 7 min read

FFVAV: Remote-Readable Heat Meters Mandatory by End of 2026

The FFVAV requires district-heating suppliers to make all heat meters remotely readable by 31 Dec 2026 and deliver monthly consumption info. What to do now.

Read →

14 June 2026 · 8 min read

Direct Marketing: Remote Control via Smart Meter Gateway from 2028

Renewable plants in direct marketing must be remote-controllable via the smart meter gateway from 2028, Section 10b EEG.

Read →

14 June 2026 · 8 min read

GPKE and Feed-in Processes: Integrating the MPES Processes in 2025

On 6 June 2025 the MPES feed-in processes move into the GPKE. What the generating metering point, the new GPKE structure and the end of the MPES mean for direct marketers.

Read →

14 June 2026 · 8 min read

BSI TR-03109-6 v2.0: What Gateway Administrators Must Meet From 2027

BSI TR-03109-6 v2.0 has been out since December 2025 and is binding from 2027 with the next recertification. What gateway administrators must mind on ISMS, audit and Section 25 MsbG.

Read →

14 June 2026 · 8 min read

Gateway Administrator Switch at Scale: How SMGW Administration Is Handed Over

How the administration of thousands of smart meter gateways is handed over remotely when the metering operator changes. switchGWA, the VDE-FNN note, WiM Strom and what practice shows.

Read →

14 June 2026 · 8 min read

Standardised Metering Contracts from 2026: What BK6-24-125 Means for the gMSB

BK6-24-125 makes three standard contracts in electricity metering binding from 1 July 2026. What MSB-RV, MSV-AN and MSV-LF, the new penalty and the changeover mean for the gMSB.

Read →

14 June 2026 · 8 min read

Smart Meter Rollout: 77 Cases and the BNetzA Sanction Regime

The BNetzA has opened 77 supervisory procedures against late metering operators. What Section 76 MsbG, the penalty payment and the procedure mean for the gMSB.

Read →

14 June 2026 · 8 min read

Heating Costs Ordinance: Remote Reading Mandatory by the End of 2026

By 31 December 2026 heat metering must be remotely readable. What the Heating Costs Ordinance requires on deadlines, monthly consumption information and reduction rights.

Read →

14 June 2026 · 8 min read

MsbG Amendment 2025: Higher Price Caps and New Duties

The 2025 MsbG amendment raises the price caps for smart metering for the first time since 2016. What changes on charges, the holding period and data duties.

Read →

14 June 2026 · 8 min read

Scaling the SMGW Backend: Meter Data Management and PKI for Millions of Devices

How to scale the SMGW backend of GWA system, head-end system and meter data management in a PKI-compliant way to millions of devices.

Read →

14 June 2026 · 8 min read

EEBUS and IEC 63380: The Common Language of Energy Devices

EEBUS connects heat pump, wallbox, HEMS and smart meter gateway. What IEC 63380 actually covers, how SPINE and SHIP work and what it means for Section 14a.

Read →

14 June 2026 · 8 min read

The Next-Generation Smart Meter Gateway: Tariff Use Cases and WAN Technology

The next-generation smart meter gateway supports more tariff use cases and new radio technologies. What TAF 7, dynamic tariffs and LTE-450 mean.

Read →

14 June 2026 · 8 min read

Solar Peak Law 2025: what applies to new PV systems from 2 kWp

The solar peak law has applied since February 2025. No payment at negative prices and a 60 percent feed-in cap for new PV systems from 2 kW: what operators need to know.

Read →

14 June 2026 · 8 min read

Competitive metering point operation: the make-or-buy decision 2025-2027

Grid-responsible and competitive metering point operation compared: gMSB, wMSB and the make-or-buy decision 2025-2027. What quotas, BK6-24-125 and outsourcing models mean for utilities.

Read →

14 June 2026 · 8 min read

Multi-utility remote reading via the SMGW: gas, water and heat at the LMN

How gas, water and heat meters bind to the smart meter gateway over wireless M-Bus. The LMN interface, OMS Security Profile B, TAF 6 and 7, section 6 MsbG and the municipal-utility advantage.

Read →

12 June 2026 · 12 min read

Control Box & Section 14a: Grid Control 2026

The control box puts section 14a EnWG into action at the device. In 2026 the hardware is certified, yet grid operators send almost no commands. The last mile.

Read →

12 June 2026 · 6 min read

Smart Meter Rollout 2026: Data Base for AI Grids

By end 2025 only 5.5 percent smart meters; in March 2026 the regulator opened 77 proceedings. Why the stalled rollout starves AI grid management of data.

Read →