Programme-level expertise, no hands-on claim.
Two MaKo releases a year, the 24-hour supplier switch, the MaBiS hub and new data obligations such as HEDWIG change the processes between grid, sales and metering. We translate rulings and application guides into requirements for systems and interfaces and keep the roadmap on track to the cut-off date.
Imbalance energy is the cost block a balancing group manager actually controls. What the reBAP punishes and what AI forecasts really deliver.
Read →Since 1 October 2025 the day-ahead market trades quarter-hours. What utilities must change in forecasting, trading, risk and settlement.
Read →Germany's 24-hour supplier switch (LFW24) becomes mandatory on 1 January 2026. What LFW24, the MaLo-ID and the API rebuild of the GPKE mean for utilities.
Read →The MaBiS-Hub centralises balancing settlement for power. What the BNetzA procedure BK6-24-210, the two-block structure and the timeline from 2028 mean for grid operators, municipal utilities and balancing group managers.
Read →GeLi Gas 2.0 brings new gas supplier-switching processes from 1 Apr 2026 under BNetzA BK7-19-001. What changes, how it differs from GeLi Gas 3.0 and what gas suppliers should do now.
Read →GasNZV expires 31 Dec 2025 (CJEU C-718/18), replaced by four BNetzA rulings from 2026.
Read →WiM Gas 2.0, gas metering switch processes from 1 Oct 2026, BK7-19-001, sector coupling to the electricity smart meter gateway.
Read →ZSG data stream and quarter-hour balancing under BK6-24-174, replacing the standard load profile.
Read →New UBA guarantee-of-origin register for gas and hydrogen, EU obligation from RED II, launch expected 2026.
Read →The electronic price sheet makes the network usage invoice machine-checkable. Price sheet 3 covers reactive power, governed by the BNetzA ruling BK6-20-160.
Read →The new standard balancing group contract (BK6-23-102) applies since October 2024 and tightens duties on security deposit, schedule management and declaration.
Read →Germany's electricity HKNR, the 2025 HkRNDV amendment and power labelling from 2027. Why subsidised power gets no guarantee of origin and what drives the greenwashing debate.
Read →MaKo 2026 reshapes German market communication: EDIFACT formats, mandatory AS4 transport and new JSON APIs, with binding releases on 1 Apr and 1 Oct 2026.
Read →SAP Mako Cloud adds a flexible cloud-native integration and automation layer to your SAP landscape so you can connect systems, orchestrate processes and scale innovation across Europe.
Read →