New-build street on a frosty morning: a technician kneels at the wallbox under a carport while the homeowner, coffee cup in hand, looks on; solar panels on the roofs and a heat pump against the house wall

Handbook · Version 1.5 · updated 3 November 2026

Digitalising the Energy Transition

Metering and control in the low-voltage grid: smart metering, the smart meter gateway and § 14a EnWG

On 31 July 2026 the Federal Network Agency put a draft out for consultation under which a market communication message called UTILTS was to be replaced by web services1. Two months later, on 1 October, it took that back2. If you had written a plan for the switch to web services in August, you could shelve it. In this field a reversal like that is nothing unusual, which is why every statement in this book says where it comes from and how firm it is.

The subject is the core of the digital energy transition: metering and control in the low-voltage grid. Eight chapters lead from the legal framework through the smart meter gateway, its certification and the tariff use cases to control under § 14a, then to tariffs and grid charges, market communication and, last, the state of the rollout. Heat planning, generation, power markets, redispatch and cybersecurity only come up at the edges. Gas is left out entirely, market communication included: chapter 7 covers it for electricity and maps which process is described where. innobu.com has articles on those edge topics, and the reading paths put them in an order that starts with the basics.

Start with the short version

Twelve pictures explain the handbook without assuming any prior knowledge. The short version takes ten to fifteen minutes to read, and each picture links to the chapter that covers its subject in depth.

  • Two devices, one metering system
  • How a control command travels
  • A price that follows the exchange
  • Two numbers, two denominators

The handbook in twelve pictures

Contents of the handbook

Who this book is for

It's written for managing directors, heads of grid and IT, and programme leads at utilities, grid operators and metering point operators who have a deadline to implement and need more than a press release for it. Regulatory management and IT architecture teams will use it too.

The book doesn't replace legal advice. When your organisation has a decision to make, the wording of the determination is what counts, and the footnotes take you there.

How evidence is marked

Every figure, date and file reference has a footnote with a retrieval date. Where an authority, the legislator or a court has published something, we cite that first; where a statement rests on manufacturer information or trade press, the footnote says so.

Each coloured box in the text carries one of eight labels, depending on how solid the statement inside it is:

LabelWhat it means
Legally bindingwritten in the law or in a determination
Technical standardtechnical guideline, protection profile or norm
Industry practicehow the market does it, without being required to
Recommendationinnobu's assessment, marked as such
Forecastexpected development, not decided
Not firmly establishedthin or ambiguous sources
Negative findingsearched for and not found
Conflicting sourcestwo sources say different things, both are cited

Why it also lists what doesn't exist

Nobody has published a figure for how many gateways in the field actually deliver grid status data, and there's no BSI certification yet for control straight from the gateway. Both are in the book anyway, because a gap with a name on it does less harm than an estimate that shows up as fact in the next slide deck. These points are collected in the appendix "Open questions and negative findings".

How the book stays current

The deadlines at the end of each chapter come from this website's deadline calendar and are read in again every night, as are the articles in the reading paths. The nightly run leaves the chapter text alone. Every change to it is checked against the sources and signed off, which is why each chapter carries its own review date. The whole book gets a review once a year, by 31 January. By the end of 2028 larger parts of it will be history, and that's when a second edition gets decided on.

Reading paths by topic field

Reading paths through ten energy transition topic fields and AI: grid, metering, market communication, generation, markets, flexibility, heat, sales, cyber, IT.

The next deadlines

Live from the deadline calendar, data as of 18 November 2026. When a deadline changes, this list changes with it.

All deadlines in the deadline calendar →

The handbook as a PDF

The same chapters as a print-ready PDF with contents, page numbers and sources, free to download without registration.

Download PDF (3.5 MB)

Sources

  1. Federal Network Agency, ruling chambers 6 and 7: notice no. 57 on data formats, 31 July 2026, consultation for the 1 April 2027 implementation date (German). bundesnetzagentur.de, retrieved 14 October 2026.
  2. Federal Network Agency, ruling chamber 6: notice no. 58 on data formats, 1 October 2026, referring to the consultation of 31 July 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.

Questions about implementing this in your organisation?

Arrange a conversation