Market communication back office in the early evening: a clerk works through a printed error list with a ruler

Chapter 7 · Part IV: Market and practice

Market communication: how meter readings become processes

MaKo 2026 with EDIFACT, AS4 and APIs, locations and resources, the 24-hour switch, WiM, balance settlement, the MaBiS hub and a map of all processes.

Updated: 28 min readDigitalising the Energy Transition
Summary

Since 1 October 2026, electricity market communication in Germany has run on a new set of message descriptions. These EDIFACT messages travel over AS4 and carry registrations, meter readings and settlement data between the market roles; API web services exist alongside them for only two jobs, identifying a market location and passing on control commands. In July 2026 the market was still consulting on replacing UTILTS entirely with web services, and the Federal Network Agency took that off the table with its notice no. 58 of 1 October.

Since January 2026 a supplier switch has had to work technically within 24 hours, and for the central MaBiS hub the BDEW proposes a 2029 start (the Federal Network Agency has decided neither the date nor the first block of the procedure). Neither works without master data that is right.

A process map at the end of the chapter shows whether and where this book covers each electricity process; the gas processes are not covered.

What market communication is and where it came from

The application handbook for a single message, UTILMD for electricity in version 2.2, binding since 1 October 2026, runs to 1,397 pages12. Each case in it, from a termination between suppliers to a master data change, has its own check identifier.

The Metering Point Operation Act (MsbG) requires metering and master data to flow in a uniform national format set by the Federal Network Agency3. Writing the formats falls to the expert group EDI@Energy, led by the BDEW; ruling chamber 6 consults on them and puts them into force by notice1.

Market communication (MaKo) is the standardised electronic data exchange between the market roles of the electricity sector, chiefly grid operator, supplier, metering point operator and transmission system operator. Which message goes to whom and when is decided by the Federal Network Agency's rulings, what the message looks like by the EDI@Energy documents4.

Market communication owes its current set-up to a problem in 2018. Under the law, readings from intelligent metering systems (iMSys) were to be processed in the device and sent from there, star-shaped, to everyone entitled to them. First-generation gateways couldn't do that, and the interim model of 2016, which routed readings through the grid operator, rested on a legal basis that expired at the end of 20195.

On 20 December 2018 ruling chamber 6 settled the matter with its "MaKo 2020" ruling. From 1 December 2019 the metering point operator handles all readings and distributes them star-shaped, from its own IT system until suitable gateways exist5. Two years later BK6-20-160 brought "MaKo 2022", whose process documents applied from 1 October 20226.

The law still envisages the gateway as sender, but only once the BSI rates processing in the device as technically feasible and the Federal Network Agency bases a ruling on that7. Until then, star-shaped means: from the metering point operator's back end.

Four rulebooks, one of them dissolved

The processes sit in rulings with their own acronyms, the oldest being the GPKE, adopted on 11 July 2006 and in force since 1 August 20078.

RulebookWhat it coversOriginal rulingTypical messages
GPKEsupplier switch, assignment, configurations, control commands, master data, grid usage billingBK6-06-009UTILMD, UTILTS, INVOIC, API MaLo ident, API control
WiMchange of metering point operator, installation and device change, transmission of readings, billing for meteringBK6-09-034UTILMD, MSCONS, IFTSTA, INVOIC
MaBiSbalancing and balance group settlementBK6-07-002MSCONS with aggregated time series, UTILMD, ORDERS
MPESfeed-in pointsmerged into the GPKEnone of its own

Sources for the table are ruling BK6-24-174, which amended all three rulebooks, the handbooks and the overview of check identifiers9210111213.

Since 6 June 2025 the current GPKE has applied, parts 1 to 3 as amended by BK6-24-174 and part 4 as amended by BK6-22-0248. MPES disappeared the same day; its rules for feed-in points now live in the GPKE14.

So a PV system runs through the same assignment processes as a household, with its own deadlines once direct marketing is involved11. One rulebook fewer doesn't mean less to read: part 2 of the GPKE alone runs to 115 pages11.

Locations and resources

If a customer replaces their heat pump or wallbox, the device keeps its number in market communication. The GPKE lists it as a technical resource, with an ID that doesn't change when the device is swapped15. Household and meter sit separately in the data model.

The model knows six such objects15:

ObjectWhat it representsWho assigns the ID
Market locationthe point of withdrawal or feed-in where energy is consumed or generatedgrid operator
Measuring locationthe place of measurement including its equipment; its ID is the metering point designationgrid operator
Grid locationthe grid connection that links one or more market locations to the grid over exactly one linecentral code registry, assigned by the grid operator
Technical resourcea single device, such as a heat pump or a wind turbinecentral code registry, assigned by the grid operator
Controllable resourceone or more technical resources that can be controlledcentral code registry, assigned by the grid operator
Location bundleeverything measured together: measuring and market locations, grid locations, resources where presentnone, it groups the others

Grid usage is billed at the market location alone, and measured at the measuring location15. Control happens at a resource or at the grid location, with different consequences.

A target set for a controllable resource applies one to one to every device assigned to it, and no other device may make up for it. A target set for a grid location only has to be met by the assigned devices together, so they can balance each other out. For § 14a, the GPKE says explicitly, compensation and the simultaneity factor are mapped through the grid location; redispatch works differently15. Chapter 5 introduced the simultaneity factor for control via an energy management system; direct control doesn't have one.

The model works the same way for generation: a controllable resource may group technical resources from consuming or from generating market locations, just not both15. What the EEG requires for controlling generation units is in chapter 5.

A control command is always addressed to exactly one location, a controllable resource or a grid location for example. The grid operator instructs it at the metering point operator, and the supplier orders it there, but only if it is assigned to every market location the command affects. If several suppliers share the feed-in of one market location, ordering is ruled out16. Ruling chamber 6 introduced these routes with the universal ordering process, ruling BK6-22-128 of 21 November 202217. Today they sit in GPKE part 316.

Location bundle is the set of measuring locations needed to measure one or more market locations, together with those market locations, the assigned grid locations and, where present, technical and controllable resources. For a flat-rate installation without metering it consists at most of market location, grid location and the two resources15.

Without a message from the grid operator, the metering point operator doesn't know an object. Under the GPKE, the grid operator is responsible for the metering point operator knowing the whole bundle at all times, at registration and with every change15. If a grid location is missing there, no command can reach it.

MaKo 2026: messages, transport, web services

MaKo 2026 is an industry label. This year's formats rest on two notices from ruling chamber 6. The first put new versions into force on 1 April 202618. The second has applied since 1 October 2026 and brings UTILMD electricity 2.2, MSCONS 3.2, UTILTS 1.1, APERAK 1.1 and a new AS4 profile, among others1. The chamber consults on the formats twice a year19.

UTILMD handles registrations and master data2. MSCONS carries readings, from a single meter reading to a load profile, and for settlement also aggregated time series10. UTILTS transmits calculation formulas and the definitions of metering times, switching times and power curves20.

Every EDIFACT file is acknowledged twice, with the AS4 delivery receipt and with a CONTRL as a syntax check. If the file can't be processed, the recipient also sends an APERAK4.

Since 1 April 2024 these files may travel only over AS4 in the electricity market. Ruling chamber 6 prescribed the web service standard on 31 March 2022, secured by the BSI's smart metering PKI. After a staged introduction from October 2023, e-mail and AS2 were allowed until 31 March 2024 at the latest21. By the chamber's own account, the market didn't implement it across the board, and in individual cases the chamber has threatened coercive fines22.

Web services exist for exactly two use cases. Since 6 June 2025 a supplier has queried the identifier of a market location, the MaLo ID, from the grid operator via web service11. Grid operators and suppliers can also instruct or order control commands at the metering point operator via web service, where they can't send them to the metering system themselves. This applies to locations in the low-voltage grid with an iMSys and a control device12. In the meantime the specifications have moved from Swagger to GitHub23. Anyone looking there will find a release 2.0.0 next to the production version, which was the subject of the consultations of February and July 2026 and isn't in force: notice no. 56 expressly left it out, and no new web API documents were published for 1 October 2026124.

Channels of electricity market communication Four market roles as boxes: supplier, grid operator, transmission system operator with balance coordinator and metering point operator. Solid lines show EDIFACT messages over AS4: grid operator and supplier exchange UTILMD and UTILTS in both directions, and the grid operator sends aggregated time series via MSCONS to the transmission system operator. The metering point operator sends load profiles via MSCONS to the grid operator, to the supplier and to the transmission system operator, and receives master data and calculation formulas from the grid operator via UTILMD and UTILTS. Dashed lines show API web services: the supplier queries the MaLo ID from the grid operator, and the grid operator instructs control commands at the metering point operator, where the supplier can also order them. Every EDIFACT file is acknowledged with CONTRL, processing errors are reported with APERAK. According to a note in notice no. 58, the web services are expected to stay limited to MaLo ident and control until further notice. EDIFACT over AS4 API web service (JSON) Supplier (LF) registration, billing Grid operator (NB) assignment, master data TSO / BIKO settlement (MaBiS) Metering point operator MSB, sends readings UTILMD · UTILTS API MaLo ident MSCONS aggregated series API control (order) MSCONS load profile MSCONS UTILMD · UTILTS API control MSCONS load profile Every EDIFACT file is acknowledged with CONTRL, processing errors come back as APERAK. Note in notice no. 58: web services only for MaLo ident and control, expected until further notice.

Open figure full size

Figure 1: Channels of electricity market communication, as of 14 October 2026, main flows rather than every single message. API web services exist only for MaLo ident and control commands. The grid operator instructs the metering point operator to carry out control commands, and the supplier can order them there as well. The web service carries only the order; the metering point operator sends the switching command to the device over the CLS channel (chapter 5).

UTILTS stays

For cases where the standard falls short, the current UTILTS handbook has code Z34: "calculation formula must be requested from the sender"20. If the formula that derives a market location's values from its measuring locations won't fit into the message, the grid operator sets this code and names a contact person. The formula then travels bilaterally, outside the standard.

On 31 July 2026 a consultation set out to get rid of that, with web services instead of UTILTS. Several calculation formulas per location were to become possible, tranches included. Metering times, switching times and power curves were to move into the new structure, and location bundles would come via web service as well19.

Two months later the web services were off the table; the goal of carrying every formula within the standard remained.

Conflicting sources

Two notices, opposite directions

Notice no. 57 of ruling chambers 6 and 7, 31 July 2026: "UTILTS will be replaced entirely by API web services."19

Notice no. 58 of ruling chamber 6, 1 October 2026: "UTILTS is thereby retained." In the original: "Die UTILTS bleibt damit erhalten." The consulted web services for calculation formula and location bundle won't be introduced, and the API guideline stays at its production version for the time being. "All possible location bundles and calculation formulas" are to travel via UTILMD and UTILTS, and a future consultation will present the changes this needs24.

Both sentences sit in the part of each notice that the Federal Network Agency publishes at EDI@Energy's request. What's binding is what the agency puts into force, and for 1 April 2027 that includes no new web API documents1924.

Both pages are still online, and in practice the later one counts: an API integration for calculation formulas started in August currently has nothing to connect to. Work on the content, several formulas per location and complete location bundles, is still needed, just in EDIFACT.

Web services thus stay with MaLo ident and control, "expected until further notice". The two BDEW application guides of 18 August 2026, written to explain the planned web services, are coming off the MaKo platform24.

For the U-turn the notice names one link: the MaBiS hub procedure doesn't foresee any further expansion of API web services. As with earlier releases, the comments were discussed with representatives of grid operators, grid users, the software industry and the Federal Network Agency. Which of them tipped the balance, the notice doesn't say24.

Negative finding

1 October 2027 was never decided

The date of 1 October 2027 for the API switch comes from notice no. 57. The EDI@Energy project group proposed giving the market twelve months to implement instead of the usual six, so that the MiSpeL ruling could still feed into the calculation formula19. It was a committee proposal rather than a chamber decision, and since notice no. 58 it has nothing left to refer to.

Little is left for 1 April 2027. The ActivationDocument for redispatch 2.0 in version 1.1g becomes binding, along with the change history of the XML formats and version 1.11 of the transmission path rules, which mainly concern certificates for mTLS. An existing S/MIME certificate with the client authentication EKU can matter here too. There are no new EDIFACT documents, no new web API documents and no new decision trees on that date, and despite its subheading the notice says nothing of its own about the code lists24.

Key point

Keep planning calculation formulas, metering times, switching times and location bundles via UTILMD and UTILTS. For now you need API web services for MaLo ident and control commands, and nothing else.

Switching supplier in 24 hours

"From 1 January 2026, the technical process of switching energy supplier must be completed within 24 hours and be possible on every working day." That's section 20a(2) of the Energy Industry Act (EnWG). Three sentences earlier sits the older limit, and it still applies: the switching procedure as a whole may not take longer than three weeks from the grid operator's receipt of the registration25.

In ruling BK6-22-024 of 21 March 2024 the Federal Network Agency built the processes, and they've been live since 6 June 202526.

The GPKE breaks the switch into deadlines a few hours apart11. First the new supplier queries the MaLo ID, and the grid operator has two hours to answer. Then the supplier registers, at the latest on the day before the last working day before supply starts. On the first working day after the registration, by 7 am, the grid operator tells the new supplier about any existing assignment and asks the old supplier whether it will end it. By 9 am the answer has to be in, and silence counts as confirmation. By 11 am the grid operator assigns the new supplier or rejects the registration, and by noon it ends the old assignment.

The metering point operator gets the configurations to set up from the grid operator, by 5 pm on the working day before supply starts at the latest, and must have them in place by 10 pm. After that it delivers the readings to the new supplier12.

Supplier switch under the GPKE: sequence and deadlines Five lanes: customer, new supplier, grid operator, old supplier, metering point operator (MSB). Step 1: the customer signs the supply contract and grants authorisation. Step 2: the new supplier queries the MaLo ID via API, the grid operator answers within two hours. Step 3: registration with the grid operator on day 1. On the first working day after: by 7 am notice to the new supplier and request to the old supplier, by 9 am answer from the old supplier, by 11 am assignment of the new supplier, by noon the old assignment ends, by 5 pm configurations go to the metering point operator, set up by 10 pm. Afterwards the metering point operator sends the readings from midnight on the start day via MSCONS to the new supplier. BEFORE DAY 1 DAY 2: FIRST WORKING DAY AFTER DAY 3 Deadline Customer New supplier Grid operator Old supplier Metering point operator 1 2 2 h 3 4 07:00 5 09:00 6 11:00 7 12:00 8 17:00 9 start 00:00 contract, outside MaKo EDIFACT over AS4 API web service 1 Customer signs the supply contract and authorises the new supplier. 2 New supplier queries the MaLo ID via API, the grid operator answers within 2 hours. 3 Registration via UTILMD, at the latest the day before the last working day before start. 4 By 07:00: notice to the new supplier, request to the old one whether it ends the assignment. 5 By 09:00: answer from the old supplier, silence counts as confirmation. 6 By 11:00: grid operator assigns the new supplier or rejects the registration. 7 By 12:00: grid operator ends the old supplier's assignment. 8 By 17:00 on the working day before start: configurations to the MSB, set up by 22:00. 9 MSB sends the readings from 00:00 on the start day via MSCONS to the new supplier.

Open figure full size

Figure 2: Simplified sequence based on the GPKE, not BPMN notation, for a consuming market location with the earliest possible supply start. Since 1 January 2026, section 20a EnWG has required the technical switching process to be completed within 24 hours, and the deadlines in GPKE parts 2 and 3 put that into practice. Day 2 is the first working day after the registration. The figure shows the case where the old supplier is still assigned at the start of supply. The recommended termination between the suppliers beforehand is left out; if the old supplier has already deregistered after it, steps 4, 5 and 7 do not apply.

A registration on Monday therefore allows supply from Wednesday, midnight, at the earliest11.

Industry practice

The start in June 2025

The Federal Association of Energy Market Service Providers (BEMD) measured how bumpy the start was. Its figures are on public record only through the trade press. On the first full working day, 10 June 2025, about 10 percent of roughly 250 grid operators tested could successfully answer the new MaLo ident requests. By 13 June it was about 80 percent of the test group, which included all the larger grid operators27.

Going from 10 to 80 percent in three days is fast for an interface the whole market switches on at once, but the start wasn't over. After two weeks the association saw "clear instability in market data exchange", and the share of successful switches was still well below the average of the preceding months27.

The quarter hour instead of the profile

On 25 October 2020 the day had 100 quarter hours instead of 96. The MSCONS handbook still uses that clock-change day as its example, and for the spring change it's 9210; any software that processes load profiles has to get both right.

Which market location is balanced by profile and which by measured quarter hours, the GPKE settles in three sentences4:

Metering at the market locationBalancing
conventional meter without load profile metering, or modern metering deviceby profile
conventional meter with recording load profile meteringas a rule by quarter-hourly values
iMSys throughoutby quarter-hourly values from daily meter reading series

The last row needs two things. First, the gateway has to capture meter readings every quarter hour, which the law calls meter reading series measurement and the device world calls TAF 7, see chapter 428. Second, the metering point operator has to send the series daily for the previous day to the grid operator, the transmission system operator and the supplier7. In market communication that's an MSCONS with the load profile of the measuring or market location10.

Ruling BK6-24-174 of 24 October 2024 brought the change. Grid and metering point operators had to start preparing quarter-hour balancing for market locations fully equipped with iMSys no later than 1 December 20249. Since 6 June 2025 their meter reading series have been sent throughout26.

Once every measuring location of a market location previously balanced by profile has an iMSys, the grid operator has to order quarter-hour balancing from the metering point operator12. So the standard load profile doesn't end on a set date; it disappears meter by meter, at the pace of the rollout described in chapter 8.

When a grid operator steers a heat pump for grid purposes under § 14a, it has to tell the supplier about every such intervention, and it does so through electronic market communication29. How the command itself runs through gateway and control box is the subject of chapter 5. What quarter-hourly values mean for time-variable grid charges is covered in chapter 6.

Metering under the WiM

Before the default metering point operator installs an intelligent metering system in an existing measuring location for the first time, it has to inform grid operator and supplier at least three months ahead, so October for an installation in January. From the announced date it then has eight weeks30.

If a competitive metering point operator runs the metering point, it hears about it three working days earlier. It can claim grandfathering under section 19(5) MsbG or upgrade the site itself. If it waives grandfathering in its reply, it can't claim it later. If it doesn't upgrade, the default operator takes over the metering point, and the incumbent has no right to refuse30.

After installation, the metering point operator reports the device change as a master data change. Next, the grid operator checks whether the market location switches its balancing method and whether it has to report it to the transmission system operator for aggregation30. Only then does the quarter hour from the previous section start for that market location. An installation at the customer's request doesn't go through this process30.

The rest of the WiM is day-to-day metering business: termination, start and end, device takeover, fault clearance, the transmission of readings3031.

On payment, the WiM assumes by default that the default metering point operator invoices the connection user directly. If it learns of a new supplier and has no exclusive contract with the customer, it has to offer that supplier to take over the charge, and if the supplier accepts, billing runs through the supplier30. This rests on the metering contract with the supplier, in its standardised form since 1 July 202632. A price change for the same scope of service has to reach the supplier three months ahead, through the price sheet30.

The grid operator's share of the price cap, broken down in chapter 1, is billed through a separate use case with its own price sheet30. Electronically, price sheets go as PRICAT, invoices as INVOIC with separate check identifiers for WiM and metering invoices, and the reply as REMADV3313.

Conflicting sources

Two sections for one price cap

WiM part 1, reading version under BK6-24-174, applicable since 6 June 2025: "Die Ermittlung der POG nach § 31 MsbG erfolgt durch den gMSB." (The default metering point operator determines the price cap under section 31 MsbG.)30

The Metering Point Operation Act as it stands today: price caps are in section 30, while section 31 governs the agile rollout and the application update34.

The process description apparently still quotes the state before the 2023 restart, when the two sections were the other way round (chapter 1). For the amount, the Act counts; the reference doesn't change the process.

Invoices, quantities and cut-off dates

The grid operator invoices grid usage to the supplier as INVOIC, and the supplier confirms or disputes it with a REMADV3533. As a rule, corrections take a cancellation invoice and a new invoice. The GPKE allows a separate correction invoice to the annual bill only in a few cases, such as after an auditor's certificate on the concession fee or with individual grid charges35.

For profile customers, a difference is left over after the year. For each of them the grid operator sets an annual consumption forecast, usually based on the previous year. Whatever the measurement shows above or below counts as supplied or taken by the grid operator: it pays the supplier for a surplus quantity and invoices a shortfall, at a uniform price derived from monthly market prices36. This invoice, too, has its own check identifier in the INVOIC33.

If a market location has no supplier, the grid operator assigns it to the default or substitute supplier, retroactively if need be, for grid usage and balancing at once. Every consuming market location has to be assigned to exactly one balance group at every point in time35.

Balance group settlement itself follows the MaBiS, 292 pages with a fixed calendar37:

StepDeadline after the end of the balancing month
First delivery of balance group aggregated time seriesworking days 1 to 12
Clearing phaseworking days 13 to 30
Settlement, data as of working day 30working day 42
Correction settlementclearing until the end of month 7, settlement at the end of month 8

In clearing, the supplier works with a supplier clearing list it requests from the grid operator, the balance responsible party with a balance group assignment list, both ordered via ORDERS3713. This whole calendar is what the Federal Network Agency wants to rebuild with the MaBiS hub.

The MaBiS hub

Since October 2024 ruling chamber 6 has been reworking balance group settlement. Procedure BK6-24-210 is to bundle the data at a central actor, the MaBiS hub, and make the processes compliant with data protection law by 2030 at the latest38. In May 2025 the chamber split the procedure into two blocks, first meter value processing and pseudonymisation, later balancing and settlement3839.

In law the roles already exist, as meter value processor and aggregator40. On formats, the direction has flipped: in September 2025 the Federal Network Agency still intended to connect market partners' systems to the hub via API web services41, whereas since 1 October 2026 the line is that the new use cases from the hub ruling will come in EDIFACT too24.

The Federal Network Agency hasn't set a start date, and the ruling on the first block is still pending24. What the market quotes as the timetable is a BDEW proposal. In September 2025 the chamber put it out for consultation with its content unchanged and pointed out that it may still change42.

Forecast

The timetable is an association proposal

The BDEW introduction scenario foresees identification of all market partners from 1 April to 30 June 2028, test systems at all parties from 1 July 2028, interface tests by 30 September 2028 and parallel operation from 1 January 2029. From 1 October 2029 only the new processes apply. The precondition is that the hub then holds close to 100 percent of the relevant master data, calculation formulas and readings. The BDEW itself calls the timeframe "extremely demanding"43.

Counterpoint: does the market need a central hub?

Ruling chamber 6 assumes that a central actor is the best way to reach its goals, including noticeable relief for market partners38.

The VKU, the association of municipal companies, disagrees. In its position paper of 4 July 2025 it calls the hub model "by no means without alternative". The data protection argument doesn't convince it, since encrypted data transfer, segmented processing or temporary IDs could suffice. Distribution system operators would lose direct access to raw data while still carrying the financial risks, and checking the hub's results would take a kind of shadow balancing. A production system by 2028 strikes the VKU as "extremely ambitious"44.

On pace, the associations aren't far apart. The BDEW wrote the scenario and calls it extremely demanding, while the VKU already finds the goal extremely ambitious4344.

On data protection the obligation is clear: the law explicitly requires pseudonymisation of load profiles and meter reading series in a whole range of transmissions3; the route there is open. The timetable depends on data quality, because a hub that needs almost all master data on day one won't start before the master data is ready.

The process map

EDI@Energy keeps the complete list in its overview of check identifiers: 86 pages in which every process step from GPKE, WiM and MaBiS gets its message13. For electricity it fits into seventeen rows, each saying whether and where this book covers the process.

ProcessRulebookMessagesIn this book
Identify the MaLo IDGPKE part 2API web serviceSwitching supplier in 24 hours
Termination, start and end of supplyGPKE part 2UTILMDSwitching supplier in 24 hours
New connection, default and substitute supplyGPKE part 2UTILMDInvoices, quantities and cut-off dates
Disconnection and reconnection on the supplier's instructionGPKE part 2ORDERS, ORDRSPnot covered
Grid usage billing, grid operator price sheetsGPKE part 2INVOIC, REMADV, PRICATInvoices, quantities and cut-off dates
Definitions and configurationsGPKE part 3UTILTS, ORDERSUTILTS stays; The quarter hour instead of the profile
Control commandsGPKE part 3API web serviceLocations and resources; chapter 5
Master data changeGPKE part 4UTILMDContracts and master data
Change of metering point operatorWiM part 1UTILMDMetering under the WiM
First installation and device changeWiM part 1IFTSTA, UTILMDMetering under the WiM
Billing for meteringWiM part 1INVOIC, REMADV, PRICATMetering under the WiM
Fault clearance at the measuring locationWiM part 2INSRPTnot covered
Processing and transmission of readingsWiM part 2MSCONSThe quarter hour instead of the profile
Balance group settlement, clearing listsMaBiSMSCONS, UTILMD, ORDERSInvoices, quantities and cut-off dates; The MaBiS hub
Annual surplus and shortfall quantitiesGPKE part 1INVOIC, REMADVInvoices, quantities and cut-off dates
Change of grid operatorapplication guideUTILTS among othersnot covered
Redispatch 2.0separate rulingsseparate XML formatsonly the 1 April 2027 date

Sources for the table: the process descriptions and the overview of check identifiers81535163031371324.

This book leaves out disconnections, faults and a change of grid operator because they barely touch metering and control; redispatch 2.0 appears only with its date because it belongs to grid operation.

Gas is ruling chamber 7's territory. Its GeLi Gas goes back to ruling BK7-06-067 of 20 August 2007 and was last amended with "GeLi Gas 3.0", adopted on 12 September 2025 (BK7-24-01-009)4546. The same expert group, EDI@Energy, writes the formats: the documents for notice no. 56 include a UTILMD for gas next to the one for electricity, and the overview of check identifiers lists GeLi Gas and WiM Gas alongside GPKE and WiM for electricity113.

This book doesn't cover the gas processes because they depend on the overhaul of gas network access: GeLi Gas 3.0 itself refers to the new KARLA Gas 2.0 ruling (BK7-24-01-007)46. The articles on innobu.com follow where it goes next: GeLi Gas 2.0, WiM Gas 2.0 and the replacement of the GasNZV.

Contracts and master data: the bottleneck

Since 1 July 2026, a breach of essential duties between grid operator and metering point operator can cost ten cents per day and per metering point affected. That's little per case, but the total grows with every metering point and every day4748.

Ruling BK6-24-125 of 20 November 2025 revised the framework contract for metering point operators and set standard metering contracts for the first time, one with the connection user or connection owner (MSV-AN) and one with the supplier (MSV-LF)48. The metering contracts bind only the default metering point operator and cover modern metering devices and iMSys. Attached is the form under section 54 MsbG32. By law it has to be easily understandable and list who gets which data from whom, how often and for what purpose49.

Section 4 links the framework contract to market communication by referring to WiM and GPKE for processing. If one party fails to implement essential requirements from them, the other can claim the contractual penalty once the WiM and GPKE clearing processes have run47.

The standard ends where the master data is wrong, and no ruling can change that on its own. For the MaLo ID request the GPKE knows exactly one error case: if the market location can't be identified (or not unambiguously), supplier and customer go into bilateral clearing11. In UTILTS the same exit is called code Z34.

For the MaBiS hub this weighs more. Notice no. 57 contained two steps explicitly meant to prepare for the hub: a grid location ID for every grid location, and a flat-rate measuring location for every flat-rate market location, so that each market location has at least one measuring location19. They aren't in an EDIFACT release for 1 April 2027, because there isn't one24. Working on your own data still pays off now, because the hub needs close to all master data from the start.

For grid and metering point operators this leads to five checks:

  1. Measure the deadlines on the first working day

    Find out how many registrations your system answers by 11 am on the first working day and how many requests to the old supplier go out before 7 am. After 9 am, silence counts as confirmation.

  2. Keep maintaining UTILTS

    Don't start an API project for calculation formulas, but expect changes to UTILMD and UTILTS: notice no. 58 announces them for a future consultation, without a date.

  3. Clean up master data before the hub

    List the market locations for which you still send calculation formulas with code Z34, the flat-rate market locations without an assigned measuring location, and the grid locations kept without an ID. That list says more about your start in the MaBiS hub than any project plan. Add your controllable devices under § 14a and check whether the metering point operator knows their controllable resources, IDs included.

  4. Align contracts with BK6-24-125

    As default metering point operator you need MSV-AN and MSV-LF, form included. Settle who documents clearing cases before the first penalty arrives.

  5. Check certificates for 1 April 2027

    From then on, the transmission path rules 1.11 apply to mTLS. Check whether your S/MIME certificate carries the client authentication EKU.

See it in the model

The interactive model shows where in the metering chain this chapter sits.

The model: from the meter to the billing system

Open deadlines for this chapter

Live from the deadline calendar, data as of 1 November 2026. When a deadline changes, this list changes with it.

All deadlines in the deadline calendar →

Sources

Primary sources come first. Uncertain statements are marked as uncertain in the text rather than left out.

  1. Federal Network Agency, ruling chamber 6: notice no. 56 on the data formats of 1 April 2026, entry into force on 1 October 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  2. BDEW, EDI@Energy: UTILMD application handbook electricity, version 2.2, published 1 April 2026, annex to notice no. 56, table of contents and foreword (German). bundesnetzagentur.de, retrieved 14 October 2026.
  3. Section 52 Metering Point Operation Act (MsbG), paragraphs 2 and 3 (German). gesetze-im-internet.de, retrieved 14 October 2026.
  4. Federal Network Agency, ruling chamber 6: GPKE part 1, introductory process description, reading version under BK6-24-174, applicable since 6 June 2025, chapter 4 and sections 8.5 and 8.6 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  5. Federal Network Agency, ruling chamber 6: ruling BK6-18-032 "Marktkommunikation 2020" of 20 December 2018, overview page (German). bundesnetzagentur.de, retrieved 14 October 2026.
  6. Federal Network Agency, ruling chamber 6: ruling BK6-20-160 on the further development of grid access conditions for electricity of 21 December 2020 ("MaKo 2022"), overview page (German). bundesnetzagentur.de, retrieved 14 October 2026.
  7. Section 60 Metering Point Operation Act (MsbG), paragraphs 2 and 3 (German). gesetze-im-internet.de, retrieved 14 October 2026.
  8. Federal Network Agency, ruling chamber 6: supplier switch (GPKE), current and previous versions (German). bundesnetzagentur.de, retrieved 14 October 2026.
  9. Federal Network Agency, ruling chamber 6: procedure BK6-24-174 on the transmission of meter reading series, ruling of 24 October 2024 with annexes (German). bundesnetzagentur.de, retrieved 14 October 2026.
  10. BDEW, EDI@Energy: MSCONS application handbook, version 3.2, published 1 April 2026, chapters 4, 7 and 8.3 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  11. Federal Network Agency, ruling chamber 6: GPKE part 2, assignment processes, reading version under BK6-24-174, applicable since 6 June 2025, sections 1.1, 1.2 and 2.1 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  12. Federal Network Agency, ruling chamber 6: GPKE part 3, configurations and control commands, reading version under BK6-24-174, applicable since 6 June 2025, sections 1.1.2, 1.3.7 and 2.1 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  13. BDEW, EDI@Energy: overview of check identifiers (Anwendungsübersicht der Prüfidentifikatoren), version 4.0, published 1 April 2026, annex to notice no. 56, table 1 (German). bundesnetzagentur.de, retrieved 18 October 2026.
  14. Federal Network Agency, ruling chamber 6: switching processes for feed-in points (MPES), current version (German). bundesnetzagentur.de, retrieved 14 October 2026.
  15. Federal Network Agency, ruling chamber 6: GPKE part 1, introductory process description, reading version under BK6-24-174, applicable since 6 June 2025, sections 3.2 to 3.7 (market location, measuring location, technical resource, controllable resource, grid location, location bundle) (German). bundesnetzagentur.de, retrieved 18 October 2026.
  16. Federal Network Agency, ruling chamber 6: GPKE part 3, configurations and control commands, reading version under BK6-24-174, section 2.1.1 use case control command from grid operator or supplier to metering point operator (German). bundesnetzagentur.de, retrieved 18 October 2026.
  17. Federal Network Agency, ruling chamber 6: ruling BK6-22-128 on the procedural handling of control actions in connection with intelligent metering systems (universal ordering process) of 21 November 2022, overview page (German). bundesnetzagentur.de, retrieved 18 October 2026.
  18. Federal Network Agency, ruling chamber 6: notice no. 54 on the data formats for market communication of 1 October 2025, entry into force on 1 April 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  19. Federal Network Agency, ruling chambers 6 and 7: notice no. 57 on the data formats of 31 July 2026, consultation for the 1 April 2027 implementation date, section with the notes published at EDI@Energy's request (German). bundesnetzagentur.de, retrieved 14 October 2026.
  20. BDEW, EDI@Energy: UTILTS application handbook, version 1.1, published 1 April 2026, foreword and chapter 4 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  21. Federal Network Agency, ruling chamber 6: notice no. 2 on ruling BK6-21-282 on securing electronic market communication for electricity, 31 August 2022 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  22. Federal Network Agency, ruling chamber 6: ruling BK6-21-282 on securing electronic market communication for electricity, procedure page, section on published enforcement measures (German). bundesnetzagentur.de, retrieved 15 October 2026.
  23. Federal Network Agency, ruling chambers 6 and 7: notice no. 55 on the data formats of 2 February 2026, consultation for the 1 October 2026 implementation date, section on API web services (German). bundesnetzagentur.de, retrieved 14 October 2026.
  24. Federal Network Agency, ruling chamber 6: notice no. 58 on the data formats of 1 October 2026, section on entry into force on 1 April 2027 and, among the notes published at EDI@Energy's request, sections on API web services and further results (German). bundesnetzagentur.de, retrieved 14 October 2026, rechecked 15 October 2026 (no later notice).
  25. Section 20a Energy Industry Act (EnWG), paragraph 2 sentences 1 and 4 (German). gesetze-im-internet.de, retrieved 14 October 2026.
  26. Federal Network Agency, ruling chamber 6: ruling BK6-22-024 on an accelerated supplier switch within 24 hours on working days, overview page with notice no. 4 of 6 December 2024 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  27. Zeitung für kommunale Wirtschaft: supplier switch in 24 hours, one month of live operation, 2 July 2025, with figures from the BEMD (German). zfk.de, retrieved 14 October 2026. Trade press.
  28. Section 2 no. 27 Metering Point Operation Act (MsbG), meter reading series measurement (German). gesetze-im-internet.de, retrieved 14 October 2026.
  29. Federal Network Agency, ruling chamber 6: ruling BK6-22-300 of 27 November 2023, annex 1, item 8.3 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  30. Federal Network Agency, ruling chamber 6: WiM part 1, reading version under BK6-24-174, sections 2 (basic processes), 3.1 device change, 3.5 first installation of an iMSys in an existing measuring location, 3.6 billing for metering and 6 billing for metering with iMSys to the grid operator (German). bundesnetzagentur.de, retrieved 18 October 2026.
  31. Federal Network Agency, ruling chamber 6: WiM part 2, reading version under BK6-24-174, sections 1 fault clearance and 2 request and transmission of readings (German). bundesnetzagentur.de, retrieved 18 October 2026.
  32. Federal Network Agency, ruling chamber 6: metering contracts, current version applicable since 1 July 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  33. BDEW, EDI@Energy: INVOIC application handbook, version 1.0b, published 1 April 2026, annex to notice no. 56, chapter 1 and overview of check identifiers (German). bundesnetzagentur.de, retrieved 18 October 2026.
  34. Sections 30 and 31 of the Metering Point Operation Act, headings and subsection 1 (German). gesetze-im-internet.de, retrieved 18 October 2026.
  35. Federal Network Agency, ruling chamber 6: GPKE part 2, reading version under BK6-24-174, applicable since 6 June 2025, sections 2.2 new connection, 2.3 default and substitute supply, 2.5 end of supply, 3.3 grid usage billing and 3.5 disconnection and reconnection (German). bundesnetzagentur.de, retrieved 18 October 2026.
  36. Federal Network Agency, ruling chamber 6: GPKE part 1, reading version under BK6-24-174, sections 8.4 annual surplus and shortfall quantities and 8.6 synchronous model (German). bundesnetzagentur.de, retrieved 18 October 2026.
  37. Federal Network Agency, ruling chamber 6: MaBiS, reading version under BK6-24-174, section 3.10 with table 2 (deadlines and cut-off dates) and sections 7.5 and 10.6 (clearing and assignment lists) (German). bundesnetzagentur.de, retrieved 18 October 2026.
  38. Federal Network Agency, ruling chamber 6: procedure on the future aggregation and settlement of balancing data (MaBiS hub), BK6-24-210, overview page (German). bundesnetzagentur.de, retrieved 14 October 2026.
  39. Federal Network Agency, ruling chamber 6: information on the status of the MaBiS hub procedure (BK6-24-210) of 27 May 2025 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  40. Sections 67a and 67b Metering Point Operation Act (MsbG), meter value processor and aggregator (German). gesetze-im-internet.de, retrieved 14 October 2026.
  41. Federal Network Agency, ruling chamber 6: notice no. 53 on the data formats of 1 September 2025, consultation on the concept for using and publishing API web services, first paragraph (German). bundesnetzagentur.de, retrieved 15 October 2026.
  42. Federal Network Agency, ruling chamber 6: consultation BK6-24-210-1, meter value processing and pseudonymisation, 26 September 2025, section on introduction milestones (German). bundesnetzagentur.de, retrieved 14 October 2026.
  43. BDEW: introduction scenario for putting the MaBiS hub into production, consultation annex to BK6-24-210-1, chapters 1, 2 and 4 (German). bundesnetzagentur.de, retrieved 14 October 2026. Association document.
  44. Verband kommunaler Unternehmen (VKU): position paper on procedure BK6-24-210 (MaBiS hub) of 4 July 2025 (German). vku.de, retrieved 14 October 2026. Association position.
  45. Federal Network Agency, ruling chamber 7: supplier switching for gas, list of decisions (German). bundesnetzagentur.de, retrieved 18 October 2026.
  46. Federal Network Agency, ruling chamber 7: ruling BK7-24-01-009 "GeLi Gas 3.0" of 12 September 2025, operative paragraph 1 with references to BK7-24-01-007 "KARLA Gas 2.0" (German). bundesnetzagentur.de, retrieved 18 October 2026.
  47. Federal Network Agency, ruling chamber 6: framework contract for metering point operators, reading version under BK6-24-125, sections 4 and 16 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  48. Federal Network Agency, ruling chamber 6: procedure BK6-24-125 on amending the framework contract for metering point operators and setting metering contracts, ruling of 20 November 2025 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  49. Section 54 Metering Point Operation Act (MsbG), form (German). gesetze-im-internet.de, retrieved 14 October 2026.

Further reading on innobu.com

Related tools

Contents of the handbook

  1. 1The legal framework: from the GDEW to today's MsbG
  2. 2Devices and architecture: what an intelligent metering system is
  3. 3BSI standards, certification and the smart metering PKI
  4. 4Tariff use cases: TAF 1 to 16 and version 2.0
  5. 5Grid-oriented control under § 14a EnWG
  6. 6Dynamic tariffs and grid charges in transition
  7. 7Market communication: how meter readings become processes
  8. 8Rollout practice: figures, supervision and what nobody measures
  9. +Digitalising the energy transition, explained
  10. +The model: from the meter to the billing system
  11. +Reading paths through ten topic fields and AI
  12. +Open questions and negative findings