Kitchen of a terraced house in the evening: an older man compares two letters from his electricity supplier, one finger on a line

Chapter 6 · Part III: Functions and control

Dynamic tariffs and grid charges in transition

Section 41a EnWG for every supplier, which TAF a dynamic tariff needs, energy sharing and shared building supply, AgNes from 2029 and MiSpeL.

Updated: 21 min readDigitalising the Energy Transition
Summary

Since 1 January 2025 every electricity supplier in Germany has had to offer a dynamic tariff. The old threshold of 100,000 customers is still in the statute but no longer does anything. The catch lies elsewhere: the duty only covers customers with an intelligent metering system, and in mid-2026 just under 6 percent of metering locations had one.

Such a tariff is usually billed on TAF 7, the series of register readings in a 15-minute grid. The price comes from the day-ahead auction, which has also traded quarter hours since October 2025, and the two series only meet in the supplier's billing.

The bigger rebuild is under way on grid charges. The § 14a modules are an interim step, AgNes is due to apply from 2029, and MiSpeL gives storage and charging points rights that, until the end of September 2027, only work with the consent of grid and metering point operators. Which time series types market communication needs for this, the determination leaves open.

A duty for every supplier

"The obligation under sentence 1 applies to all electricity suppliers from 1 January 2025." That one sentence in section 41a(2) EnWG disposed of the threshold in front of it without deleting a word1.

Sentence 1 is still there, threshold and all: 100,000 final customers on 31 December of a given year. A second threshold of 50,000 final customers, also in paragraph 2, had already been struck out in 2023 by the Act on the Restart of the Digitalisation of the Energy Transition (GNDEW)2.

Electricity supply contract with dynamic tariffs is, under section 3 no. 95 EnWG, a contract with a final customer "in which price fluctuations on the spot markets, including the day-ahead and intraday markets, are reflected at intervals at least equal to the settlement intervals of the respective market"3.

Paperwork comes with the duty: explaining costs, benefits, drawbacks and risks, plus a contract summary. Since 2025 the tariff must also be available without grid use and metering if the customer wants it that way and has contracted grid use or metering directly1.

Since the end of 2025 the same section has had a counterpart: suppliers with more than 200,000 final customers must also offer a fixed-price contract, running for at least twelve months with the supplier's share of the price guaranteed for that term. Suppliers that sell only dynamic tariffs are exempt14.

Many suppliers offered them before they had to. In 2022 the Federal Network Agency counted 52, a year later 90 and in 2024 4125. How many households actually signed up, the report doesn't say.

Which leaves the condition in sentence 1: the offer is only mandatory for final customers "who have an intelligent metering system within the meaning of the Metering Point Operation Act"1. On 30 June 2026 that was 3,172,579 out of 54,135,202 metering locations, or 5.9 percent6; for everybody else, the duty is an offer nobody can take up.

Suppliers still have a lever. Since 1 January 2025, the same start date as the tariff duty, final customers, and energy suppliers acting for their customers, can ask the metering point operator to fit an intelligent metering system (iMSys) early, within four months. With the default metering point operator, a one-off charge of up to €100 gross is presumed reasonable, plus up to €30 a year in optional installation cases7. For a supplier this is the shortest route to a metering system at the customer's premises.

The default metering point operator may, however, defer such orders for a while, as far and as long as that doesn't put its statutory installation duties at risk, and then has to give reasons in writing and a binding schedule. It may refuse, for instance, as long as installation isn't technically possible8.

Negative finding

No enforcement, no contract figures

No supervisory action by the Federal Network Agency against a supplier over section 41a could be found up to early November 2026. A monitoring report for 2026 had not been published by 14 October 20265. Nobody has published how many such contracts existed in 2025 or 2026.

The price comes in quarter hours

At 13:08 on 30 September 2025, EPEX Spot published the day-ahead auction results for 1 October, for the first time covering 96 quarter hours9. Hourly contracts stayed available.

A dynamic tariff hangs on this series. The regulator describes it as tying procurement costs to the EPEX Spot market and calculates its own model prices from day-ahead results5. The exchange offers suppliers a dedicated licence for this, valid per country where the customers are10; passing exchange prices on means holding a data contract too.

Not firmly established

Is an hourly price still enough?

The statute requires price swings to be reflected at intervals "at least equal to the settlement intervals of the respective market"3. Since 1 October 2025 the day-ahead auction has run on quarter hours. Whether a tariff that keeps passing on only hourly prices still fits the definition, no authority had explicitly said by early November 2026. A tariff system built today should therefore cope with 96 prices a day.

What metering the tariff needs

A price per quarter hour is useless while consumption only exists as a yearly total, because each price needs a quantity.

The Metering Point Operation Act is blunt about it: once a final customer using up to 100,000 kWh a year has an iMSys, consumption is measured as a series of meter readings11. As standard, the metering point operator sends that series to the supplier daily for the previous day, billing being one of the purposes12. In the gateway the function is TAF 7 (Chapter 4): meter readings every 15 minutes, transmitted daily.

TAF 2, by contrast, is a multi-rate meter gone digital. The gateway adds up consumption in tariff levels whose time windows are fixed in advance; for the three levels of module 3 that's an option, according to the BDEW application guide (Chapter 5)13. It won't work for an exchange price, which is only known the day before, for each quarter hour separately, and a window configured weeks ago knows nothing about it.

TAF 7 has a caveat too. In November 2023 ruling chamber 8 noted, with reference to legal metrology rules, that TAF 7 "may not yet be used for billing"14. Chapter 5 shows how metering point operators deal with that for module 3 today.

Data flow of a dynamic electricity tariff A meter delivers its readings over the local metrological network to the smart meter gateway. Using TAF 7, the gateway records the series of register readings in 15-minute intervals and sends it to the metering point operator. The metering point operator processes the values, forms substitute values under section 55 MsbG where needed, and sends them to the supplier every day for the previous day as an MSCONS message. The EPEX Spot day-ahead auction supplies usually 96 quarter-hour prices a day to the supplier, 92 or 100 on the days the clocks change. In billing under section 41a EnWG the supplier multiplies quarter-hour value and exchange price, which produces the customer's bill. A legend tells blue lines for readings from black ones for price and billing. A note shows why TAF 2 is not enough: its time windows are fixed in advance, while the exchange price is set the day before, for each quarter hour separately. METERING AND TRANSMISSION readings price, billing Meter on the LMN Smart meter gateway TAF 7: register readings 15-minute interval Metering point operator Processing, substitute values under § 55 MsbG MSCONS daily, previous day PRICE BILLING EPEX Spot Day-ahead auction, per quarter hour usually 96 prices a day Supplier Billing under § 41a EnWG Quarter-hour value × exchange price where metering and price meet Bill to the customer Energy price follows the exchange Not enough: TAF 2 Windows are fixed in advance, the exchange price comes the day before, per quarter hour

Open figure full size

Figure 1: Where quarter hour and price meet. The gateway usually records the series of register readings through TAF 7, and the metering point operator sends it to the supplier every day as an MSCONS message. Usually the day-ahead auction supplies 96 prices a day. Only the supplier's billing brings the two series together. Grid charges, also time-variable under module 3, are not shown.
Key point

A dynamic tariff under section 41a usually runs on TAF 7 at the metering point and on billing that can handle 96 values a day. The act itself doesn't prescribe a TAF, but TAF 2 won't do, however finely its windows are cut.

Supply models that need the quarter hour

Since 1 June 2026, distribution system operators have had to make energy sharing possible within their balancing area, and from 1 June 2028 also with the directly adjacent grid in the same control area15. The operator of a renewable plant, or of storage holding only renewable power, then shares its electricity with other final consumers over the public grid. One condition leaves no room: every supplied consumption point and the plant itself are recorded with meter reading series or quarter-hourly registering power metering15.

With shared building supply, the power stays in the building and never passes through a grid. Here too the quarter hour is written into the law: each participating consumer's offtake is metered quarter-hourly16.

Tenant electricity with a virtual sum meter also depends on the metering system. Section 20(1d) of the Energy Industry Act allows the sum meter at the grid connection point to be calculated rather than physically installed, but only if every metering device whose readings go into the netting is an intelligent metering system17.

A supplier or plant operator offering any of these models therefore needs the metering system at the customer first. For the metering point operator, that's demand that doesn't come from the rollout obligation.

What billing has to cope with

96 values a day make 35,040 quarter-hour values per market location per year, plus as many prices; a customer read once a year produces one reading in the same period.

The transport is settled: quarter-hour values go from the metering point operator to the supplier as MSCONS messages, the "load profile for the previous day" in the application handbook's words18. Since 6 June 2025 these series have been transmitted under determination BK6-24-174, with the details in Chapter 719.

What the systems behind it must do is spread across the statute. The supplier may process readings for billing, tariff calculation included, and normally has to delete them within three years after the end of the year of recording20. Where no true value is available, the metering point operator forms a substitute or provisional one11. Because time series are versioned for this, a quarter hour can come back with a different value after the bill has gone out18.

Pair a dynamic tariff with module 3 under § 14a, and two time-variable prices end up on one bill: the exchange price in the energy component and a three-level grid charge. The supplier then has to show grid charges per tariff level separately14.

The weak spot lies between installation and the first bill, and the Federal Network Agency says so itself. In September 2026 it made clear that "mere installation" of a metering system isn't enough. Only once it reliably records and transmits quarter-hour values is the groundwork for time-variable tariffs laid, the agency said6. In July 2025 its ruling chamber 8 had described the same pattern for module 3: implementation appeared to be slow "even when the customer can show an intelligent metering system as the prerequisite"21.

Negative finding

Nobody measures how long it takes

No one publishes how long it takes from installing an iMSys to the first bill based on quarter-hour values. The agency's rollout statistics count installed systems, not delivered values.

Grid charges today: the § 14a modules

Grid charges have acquired a clock too, at least for controllable consumption devices. On 23 November 2023 the agency's ruling chamber 8 set three modules, covered in depth in Chapter 514.

Modules 1 and 2 have applied since 1 January 2024: either a flat €80 gross a year plus a stability bonus, or 40 percent of the energy rate for a separately metered device with no standing charge14. Neither needs an iMSys, which may also come later13.

Module 3 is the time-variable grid charge: three tariff levels, first on the price sheet for 2025, billed since 1 April 2025, only on top of module 1 and only with an iMSys. Market communication release cycles were the chamber's reason for the later billing start14. Which level applies when, and in which quarters, is fixed in advance on the price sheet, unlike the exchange price14. Grid operators have to publish it by 15 October for the following year, as expected charges if need be22.

Even these three fixed levels, known long in advance, cause trouble. The Federal Network Agency started enforcing in 2026, and as of 13 October 2026 it lists four distribution system operators over shortcomings "in particular in connection with module 3"23.

The 2027 price sheets were due on 15 October 2026. The transmission system operators published their provisional charges on 1 October 2026: 3.54 cents per kWh on average at extra-high voltage and its transformation level, up from 2.86 cents in 2026. That includes a federal subsidy of €5.525 billion, almost €1 billion less than for 202624. The law behind it, a new section 24d EnWG, had been before the Bundestag as a government bill since 28 September25 and hadn't been passed by 1 October. Without legal certainty by 7 December 2026, the TSOs expect higher final charges24.

AgNes: the framework from 2029

"The date of publication is set as 1 January 2027." That's how the operative part of the draft ends, at item 20, in the agency's own English version26.

AgNes stands for Allgemeine Netzentgeltsystematik Strom, the general structure of electricity grid charges. It sits with the agency's Grand Ruling Chamber Energy, file number GBK-25-01-1#3, not with ruling chamber 8 of the modules27. Published on 6 August 2026, the draft was open for comments until 18 September. A decision is planned for 2026, follow-up determinations for 202728.

The hurry comes from the Electricity Grid Charges Ordinance (StromNEV): it lapses at the end of 31 December 2028, and from 1 January 2029 grid charges are to be set and billed under the new determination26. Around €37 billion a year is at stake, which the agency puts at roughly 30 percent of a household's electricity costs28. No decision had been adopted by 14 October 2026, so what follows comes from the draft.

Households on low voltage using up to 100,000 kWh keep a standing charge plus an energy rate. New is a prosumer surcharge for withdrawal points with generation behind the same grid connection: 70 to 90 percent of the standing charge, plug-in solar exempt. From 1 April 2028 suppliers are to show prosumer status on the bill, and by then grid operators must identify the withdrawal points concerned and report them through market communication26. For grid operators that means a new attribute in their master data, due in eighteen months.

Today, feeding in carries no grid charge at all29. Under the draft, plants above 30 kW would pay a nationwide feed-in charge per kW; a worked example lands at roughly €5 per kW and year. Plants running before publication, or with a final investment decision by then and connection by 4 August 2029, would pay only once 20 years have passed since commissioning26.

Dynamic grid charges will come late, and not for households. Storage at grid and transformation levels 1 to 5 would pay them from 2030 at the earliest and 2033 at the latest, generation between 2032 and 2035, each only if the chamber spells out the design two years ahead. For final consumers the agency "has decided not to set or settle dynamic network tariffs ... at this time", as its own English version puts it26.

FeatureTodayAgNes draft, from 2029
Household, low voltagestanding charge and energy rate30standing charge and energy rate, standing charge bringing in 20 to 40 percent of revenue
Household with own generationsame as any householdsurcharge of 70 to 90 percent on the standing charge
Controllable consumption devicemodule 1, module 2, or module 1 plus 3module 3 unaffected, no prosumer surcharge under module 2, nothing on module 1
Generation above 30 kWno grid charges for feed-infeed-in charge per kW, existing plants only 20 years after commissioning
Dynamic grid chargenonestorage 2030 to 2033, generation 2032 to 2035, final customers not for now
Timeline: tariffs and grid charges in transition The timeline shows documented key dates for dynamic tariffs and grid charges. 1 Jan 2024: section 14a: modules 1 and 2 mandatory for all DSOs. 15 Oct 2024: section 14a module 3 first appears on the price sheet, for 2025. 1 Jan 2025: section 41a EnWG: dynamic tariff for every supplier. 1 Apr 2025: section 14a module 3: billing starts. 1 Oct 2025: Day-ahead auction trades quarter hours. 6 Aug 2026: AgNes: draft determination, consultation to 18 Sep. 1 Oct 2026: MiSpeL adopted, consent reservation running. After the status of 14 October 2026 come: 15 Oct 2026: section 20 EnWG: the 2027 price sheets with the module 3 bands are due. End 2026: AgNes: decision planned, the draft sets 1 Jan 2027 as the date of notification. 30 Sep 2027: MiSpeL: consent reservation ends. 1 Apr 2028: AgNes draft: prosumer status on the bill. 31 Dec 2028: StromNEV expires, transition rules for older section 14a agreements end, except for night storage heaters. 1 Jan 2029: AgNes: new grid charge system due to apply. Tariff and exchange Grid charges Storage and charging points Draft or planned 1 Jan 2024 § 14a: modules 1 and 2 mandatory for all DSOs 15 Oct 2024 § 14a module 3 first on the price sheet (for 2025) 1 Jan 2025 § 41a EnWG: dynamic tariff for every supplier 1 Apr 2025 § 14a module 3: billing starts 1 Oct 2025 Day-ahead auction trades quarter hours 6 Aug 2026 AgNes: draft determination, consultation to 18 Sep 1 Oct 2026 MiSpeL adopted, consent reservation running 15 Oct 2026 § 20 EnWG: 2027 price sheets due, with module 3 bands End 2026 AgNes: decision planned, notification 1 Jan 2027 30 Sep 2027 MiSpeL: consent reservation ends 1 Apr 2028 AgNes draft: prosumer status on the bill 31 Dec 2028 StromNEV and § 14a transitions end, except night storage 1 Jan 2029 AgNes: new grid charge system due to apply AS OF 15 OCT 2026

Open figure full size

Figure 2: Documented key dates for tariffs and grid charges. Dashed frames mark drafts or plans, the dash-dot line the status date of this chapter. On 31 December 2028 the transition rules for older § 14a arrangements end, night storage heaters excepted.

What becomes of the modules

The short answer is item 12.5 of the draft: "The levying and further development of time-of-use network tariffs pursuant to section 14a EnWG ('module 3') remain unaffected"26. So module 3 survives, and under the draft it's the only time-variable grid charge households will see for now.

Module 2 gets a side remark in the reasoning: where module 2 means no standing charge, there's no prosumer surcharge either26. Module 1 isn't expressly mentioned in the draft.

Chamber 8's own determination sets no end date for the modules in its operative part. A 2024 to 2028 time limit was still in the key points paper of the first consultation but didn't make it into the decision. Only the transition rules for older § 14a arrangements run until 31 December 2028, night storage heaters excepted14.

How module 3 will develop is open. That's despite many consultation submissions proposing exactly this instead of dynamic grid charges, some with five to six time windows26. The draft has no concrete proposals on it, the Federation of German Consumer Organisations (vzbv) complains30.

Not firmly established

Open until the decision

The draft of 6 August 2026 may still change before the decision. What happens to modules 1 and 2 from 2029 is not expressly settled by either the draft or chamber 8's determination.

MiSpeL: a year on consent

On 1 October 2026 the Federal Network Agency adopted its determination on the market integration of storage and charging points, MiSpeL for short, file number 618-25-02. It appeared in the agency's official gazette on 7 October31. It sets out how green power and grid power in a storage unit or bidirectional charging point are told apart, so that EEG support and levy privileges land on the right quantities. There are two new routes, the delimitation option with formula sets and the flat-rate option with a single bidirectional meter. The second only applies where the solar systems behind the feed-in point add up to no more than 30 kWp31.

Both new options require the plant operator to assign the renewable plants, storage units and bidirectional charging points behind the feed-in point to direct marketing (operative item 5). With a fixed feed-in tariff only the exclusivity option remains; statements that wanted to change this were rejected with reference to the wording of section 19 EEG31. The determination took effect on notification (operative item 8), two weeks after the gazette, on 21 October 202632.

Both options work in quarter hours, because the determination defines simultaneity explicitly as a 15-minute interval31; without quarter-hour values MiSpeL can't be applied. On grid charges the determination works only indirectly until the end of 2028: section 118(6) sentence 3 EnWG refers to section 21 EnFG, and the Federal Network Agency reads that reference as including the MiSpeL rules3132. The AgNes draft builds on this: it treats MiSpeL's bidirectional charging points like co-located storage and exempts grid power fed back from energy rates, as far as metering can separate it26.

For the first year, item 9 a) decides: "Until 30 September 2027, the provisions of the determination are only applicable if the claims under items 1 to 4 and the allocation under item 5 are asserted with the consent of the respective grid operator and metering point operator"31.

At the same time item 7 obliges exactly these grid and metering point operators to make the claims possible31. So they have to cooperate, but until then only those with their consent can invoke the determination.

The transition period is meant to let the industry adapt its market communication processes, which, however, are "not part of the subject matter of this determination"31. The question of suitable time series types, raised among others by the new-energy association bne (Bundesverband Neue Energiewirtschaft), the German Association of Energy and Water Industries (BDEW) and the storage association BVES, is explicitly left open. Even the agency calls its period of just under a year "tight"31.

One year of transition, one format cycle: Market communication data formats normally change twice a year, on 1 April and 1 October19. On 1 October 2026, the very day of the MiSpeL decision, ruling chamber 6 announced that the EDIFACT formats need no adjustment for 1 April 202733. If the regular cycle holds, 1 October 2027 is the earliest date for amended format descriptions, the day after the consent reservation expires.

Not firmly established

The simple option waits for Brussels

The flat-rate option only applies from the month after the European Commission grants state aid approval for section 19(3c) EEG31. No such approval could be found by 3 November 2026, and the agency's MiSpeL page gives no date. Until then, only the more demanding delimitation option is open.

Counterpoint: prosumer surcharge, processes, pace

Comments on the AgNes draft were due by 18 September 2026. The agency intends to publish them but hadn't done so by early November27. Two points keep coming up in what the associations have published themselves: the prosumer surcharge, which hits households, and the feed-in charge343530.

The German Renewable Energy Federation (BEE) wants the surcharge scrapped. Its president Ursula Heinen-Esser calls it "neither cost-reflective nor good for the system", and for the feed-in charge the federation wants a fixed cap of €4.5 per kW and year34. The vzbv, in its submission of 16 September 2026, wants the surcharge graded by plant size30.

In the draft itself, the agency answers: "Lower, volume-based use of the grid does not mean that costs in the grid are saved as well"26.

For digitalisation another objection weighs more. The bne misses a binding roadmap for data requirements and market processes: "New payment obligations must not take effect before prices and billing processes are firmly established."36 In its submission of 18 September 2026 the BDEW writes that the draft "is not yet a reliable basis for implementation in the industry" and calls the implementation period "tight" even if work starts right after the decision35. Agency president Klaus Müller had named two years of implementation time as the goal28, and the timetable to 1 January 2029 has no room for more.

It isn't a new argument. Even for module 3, as the draft itself records, several submissions said eighteen months of implementation time had fallen short26.

With MiSpeL the agency recorded the same split in the decision. bne and BVES wanted it applied at once, if need be before market communication was ready. BDEW and the municipal utilities' association VKU wanted to wait until the processes worked at mass-market scale. The agency went for what it calls a "middle way": the consent reservation31.

With that, the agency postponed the dispute by a year and pushed it down into every single grid area: until the end of September 2027, grid and metering point operators there decide whether the determination applies.

What grid and metering point operators should check now

Tariffs, module 3, AgNes and MiSpeL all hang on the same quarter-hour values, so the checks start with whether those values arrive.

  1. Measure delivery, not installation

    Rollout statistics count installed metering systems; for tariffs and module 3, what counts is whether the series of register readings reaches the supplier complete every day. Track the share of metering locations with gap-free previous-day values as a KPI of its own.

  2. Bill module 3 end to end

    Four distribution system operators are already on the agency's enforcement list23; check that every module 3 metering location of yours runs from price sheet to bill.

  3. Prepare the prosumer flag

    Under the draft, identification is required by 1 April 2028. Check whether your master data shows today which grid connection has a generation plant behind it, tenant electricity and shared building supply included.

  4. Don't sit on MiSpeL requests

    Until 30 September 2027 you have a say in whether the determination applies. Decide who in your organisation gives consent, and document how you exchange quantities without a defined format.

See it in the model

The interactive model shows where in the metering chain this chapter sits.

The model: from the meter to the billing system

Open deadlines for this chapter

Live from the deadline calendar, data as of 15 November 2026. When a deadline changes, this list changes with it.

All deadlines in the deadline calendar →

Sources

Primary sources come first. Uncertain statements are marked as uncertain in the text rather than left out.

  1. Section 41a Energy Industry Act (EnWG), load-variable, time-of-day or dynamic and other electricity tariffs and fixed-price contracts, paragraphs 2 to 7 (German; quotations are our translation). gesetze-im-internet.de, retrieved 14 October 2026.
  2. German Bundestag: Act on the Restart of the Digitalisation of the Energy Transition as passed, Bundesrat printed paper 161/23 of 21 April 2023, Article 1 no. 4 (amendment of section 41a(2) sentence 3 EnWG) (German). bundesrat.de, retrieved 14 October 2026.
  3. Section 3 no. 95 Energy Industry Act (EnWG), definition of an electricity supply contract with dynamic tariffs (German; quotations are our translation). gesetze-im-internet.de, retrieved 14 October 2026.
  4. Act amending energy law to strengthen consumer protection in the energy sector and amending further energy law provisions of 18 December 2025, Federal Law Gazette 2025 Part I No. 347 of 22 December 2025, Article 1 (amendment of section 41a EnWG) (German). recht.bund.de, retrieved 14 October 2026.
  5. Federal Network Agency and Federal Cartel Office: Monitoring Report 2025, published 26 November 2025, PDF version as of 26 January 2026, p. 5 and p. 163, figure 93; on 14 October 2026 the overview page lists no newer report (German). data.bundesnetzagentur.de, retrieved 14 October 2026.
  6. Federal Network Agency: press release on the rollout of intelligent metering systems as of 30 June 2026, 21 September 2026 (German; quotations are our translation). bundesnetzagentur.de, retrieved 14 October 2026.
  7. Section 35(1) sentence 2 no. 1 Metering Point Operation Act (MsbG), reasonable charges for additional services of the default metering point operator, caps for early installation of an intelligent metering system (German). gesetze-im-internet.de, retrieved 14 October 2026.
  8. Section 34(2) sentence 2 no. 1 and sentences 3 to 6 Metering Point Operation Act (MsbG), early installation of an intelligent metering system as an additional service, refusal and deferral (German). gesetze-im-internet.de, retrieved 14 October 2026.
  9. EPEX Spot: 15-minute products live on EPEX SPOT Day-Ahead markets, announcement of 30 September 2025. epexspot.com, retrieved 14 October 2026.
  10. EPEX Spot: Dynamic Pricing License for Electricity Retailers. epexspot.com, retrieved 14 October 2026. The exchange describing its own product.
  11. Section 55(1) and (2) Metering Point Operation Act (MsbG), collection of electricity readings (German). gesetze-im-internet.de, retrieved 14 October 2026.
  12. Section 60(3) no. 3 letter b Metering Point Operation Act (MsbG), transmission of data to the energy supplier (German). gesetze-im-internet.de, retrieved 14 October 2026.
  13. BDEW: application guide on implementing module 3 of ruling BK8-22/010-A, version 1.2 of 17 July 2026, sections 2 and 4 (German). bdew.de, retrieved 14 October 2026. Industry association source.
  14. Federal Network Agency, ruling chamber 8: determination BK8-22/010-A of 23 November 2023, operative items 1 to 4 and 6, recitals 8, 120 and 133 to 135 (German; quotations are our translation). bundesnetzagentur.de, retrieved 14 October 2026.
  15. Section 42c of the Energy Industry Act, shared use of electricity from renewable generation, subsection 1 nos. 6 and 7 and subsection 4 (German). gesetze-im-internet.de, retrieved 18 October 2026.
  16. Section 42b(1) of the Energy Industry Act, shared building supply (German). gesetze-im-internet.de, retrieved 18 October 2026.
  17. Section 20(1d) of the Energy Industry Act, sum meter and virtual sum meter (German). gesetze-im-internet.de, retrieved 18 October 2026.
  18. BDEW, EDI@Energy: MSCONS application handbook, version 3.2, published 1 April 2026, chapters 5.1 (versioning of time series) and 7; published with notice no. 56 of ruling chamber 6, binding since 1 October 2026 (German; quotations are our translation). bundesnetzagentur.de, retrieved 14 October 2026.
  19. Federal Network Agency, ruling chamber 6: determination BK6-24-174 on the transmission of meter reading series, decision of 24 October 2024, p. 13 on the half-yearly format cycle; procedure page with start of application on 6 June 2025 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  20. Section 69(1) and (3) Metering Point Operation Act (MsbG), processing of readings for the purposes of the energy supplier (German). gesetze-im-internet.de, retrieved 14 October 2026.
  21. Federal Network Agency, ruling chamber 8: information letter 03/2025 of 10 July 2025, item 1 (German; quotations are our translation). bundesnetzagentur.de, retrieved 14 October 2026.
  22. Section 20(1) sentences 1 and 2 Energy Industry Act (EnWG), publication of network access charges (German). gesetze-im-internet.de, retrieved 14 October 2026.
  23. Federal Network Agency: publication of administrative enforcement measures under determination BK8-22/010-A, as of 13 October 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  24. The four transmission system operators with control area responsibility: transmission system operators publish provisional grid charges for 2027, joint press release of 1 October 2026 (German). amprion.net, retrieved 15 October 2026. Company source.
  25. German Bundestag: government bill amending the Energy Industry Act to grant a subsidy towards transmission grid costs for 2027 to 2029, printed paper 21/8236 of 28 September 2026, pp. 1 f. and Article 1 (section 24d EnWG) (German). bundestag.de, retrieved 15 October 2026.
  26. Federal Network Agency, Grand Ruling Chamber Energy: draft determination on the general system of electricity grid charges, GBK-25-01-1#3, of 6 August 2026, operative items 1.2, 2, 8.2, 8.3, 9, 10.2, 12, 17.4, 17.8 and 20, recitals 4, 81, 88, 90, 292, 298 and 503, worked example on p. 149 (German; quotations from the reasons are our translation). bundesnetzagentur.de; operative part in the agency's English version: bundesnetzagentur.de, both retrieved 14 October 2026.
  27. Federal Network Agency, Grand Ruling Chamber Energy: AgNes determination procedure, GBK-25-01-1#3, procedure page as of 21 September 2026, announcing that submissions will be published (German). bundesnetzagentur.de, retrieved 3 November 2026.
  28. Federal Network Agency: press release on the start of the consultation on the reform of the electricity grid charge system, 6 August 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  29. Section 15(1) sentence 3 Electricity Grid Charges Ordinance (StromNEV) (German). gesetze-im-internet.de, retrieved 14 October 2026.
  30. Federation of German Consumer Organisations (vzbv): Netzentgelte fair verteilen, submission on the AgNes draft determination of 16 September 2026, section III nos. 1, 2 and 4 (German). vzbv.de, retrieved 14 October 2026.
  31. Federal Network Agency: determination on the market integration of storage and charging points (MiSpeL), file no. 618-25-02, of 1 October 2026, operative items 5 and 7 to 9, reasons pp. 7, 14, 22 f., 25, 28, 60, 72, 73 f. and 92 f. (German; quotations are our translation). bundesnetzagentur.de, retrieved 3 November 2026.
  32. Federal Network Agency: workshop on the MiSpeL determination on 2 October 2026, slides 5 and 16 (German). bundesnetzagentur.de, retrieved 3 November 2026.
  33. Federal Network Agency, ruling chamber 6: notice no. 58 on data formats for market communication, 1 October 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  34. German Renewable Energy Federation (BEE): AgNes draft determination, BEE calls for investment security, press release of 18 September 2026 (German; quotations are our translation). bee-ev.de, retrieved 15 October 2026. Industry association source.
  35. BDEW: submission on the draft determination on the general system of grid charges (AgNes), 18 September 2026, pp. 4 f. (German; quotations are our translation). bdew.de, retrieved 15 October 2026. Industry association source.
  36. Bundesverband Neue Energiewirtschaft (bne): submission on the AgNes determination procedure (GBK-25-01-1#3), 18 September 2026 (German; quotations are our translation). bne-online.de, retrieved 15 October 2026. Industry association source.

Further reading on innobu.com

Related tools

Contents of the handbook

  1. 1The legal framework: from the GDEW to today's MsbG
  2. 2Devices and architecture: what an intelligent metering system is
  3. 3BSI standards, certification and the smart metering PKI
  4. 4Tariff use cases: TAF 1 to 16 and version 2.0
  5. 5Grid-oriented control under § 14a EnWG
  6. 6Dynamic tariffs and grid charges in transition
  7. 7Market communication: how meter readings become processes
  8. 8Rollout practice: figures, supervision and what nobody measures
  9. +Digitalising the energy transition, explained
  10. +The model: from the meter to the billing system
  11. +Reading paths through ten topic fields and AI
  12. +Open questions and negative findings

Questions about implementing this in your organisation?

Arrange a conversation