Chapter 6 · Part III: Functions and control
Dynamic tariffs and grid charges in transition
Section 41a EnWG for every supplier, which TAF a dynamic tariff needs, AgNes from 2029 and the MiSpeL determination: what is changing now.
Since 1 January 2025 every electricity supplier in Germany has had to offer a dynamic tariff. The old threshold of 100,000 customers is still in the statute but no longer does anything. The catch lies elsewhere: the duty only covers customers with an intelligent metering system, and in mid-2026 just under 6 percent of metering locations had one.
Such a tariff is usually billed on TAF 7, the series of register readings in a 15-minute grid. The price comes from the day-ahead auction, which has also traded quarter hours since October 2025. The two series only meet in the supplier's billing.
The bigger rebuild is under way on grid charges. The §14a modules are an interim step, AgNes is due to apply from 2029, and MiSpeL gives storage and charging points rights that, until the end of September 2027, only work with the consent of grid and metering point operators. And the data formats?
A duty for every supplier
"The obligation under sentence 1 applies to all electricity suppliers from 1 January 2025." One sentence in section 41a(2) EnWG. It disposed of the threshold in front of it without deleting a word1.
Sentence 1 is still there, threshold and all: 100,000 final customers on 31 December of a given year. A second threshold of 50,000 final customers, also in paragraph 2, had already been struck out in 2023 by the Act on the Restart of the Digitalisation of the Energy Transition (GNDEW)2.
Paperwork comes with the duty: explaining costs, benefits, drawbacks and risks, plus a contract summary. Since 2025 the tariff must also be available without grid use and metering if the customer wants it that way and has contracted grid use or metering directly1.
Since the end of 2025 the same section has had a counterpart. Suppliers with more than 200,000 final customers must also offer a fixed-price contract, running for at least twelve months with the supplier's share of the price guaranteed for that term. Suppliers that sell only dynamic tariffs are exempt1,4.
Many suppliers offered them before they had to. The Federal Network Agency counted 52 in 2022, 90 a year later and 412 in 20245. How many households actually signed up, the report doesn't say.
Which leaves the condition in sentence 1. The offer is only mandatory for final customers "who have an intelligent metering system within the meaning of the Metering Point Operation Act"1. On 30 June 2026 that was 3,172,579 out of 54,135,202 metering locations, or 5.9 percent6. For everybody else, the duty is an offer nobody can take up.
There is a lever. Since 1 January 2025, final customers, and energy suppliers acting for their customers, can ask the metering point operator to fit an intelligent metering system (iMSys) early, within four months. With the default metering point operator, a one-off charge of up to €100 gross is presumed reasonable, plus up to €30 a year in optional installation cases7. Same start date as the tariff duty, and for a supplier the shortest route to a metering system at the customer's premises.
With one catch. The default metering point operator may defer such orders for a while, as far and as long as that doesn't put its statutory installation duties at risk, and then has to give reasons in writing and a binding schedule. It may refuse, for instance, as long as installation isn't technically possible8.
No enforcement, no contract figures
No supervisory action by the Federal Network Agency against a supplier over section 41a could be found up to mid-October 2026. A monitoring report for 2026 had not been published by 14 October 20265. Public figures on the number of such contracts in 2025 or 2026 don't exist.
The price comes in quarter hours
At 13:08 on 30 September 2025, EPEX Spot published the day-ahead auction results for 1 October. For the first time they covered 96 quarter hours9. Hourly contracts stayed available.
This is the series that counts. The regulator describes such a tariff as tying procurement costs to the EPEX Spot market and calculates its own model prices from day-ahead results5. The exchange offers suppliers a dedicated licence for this, valid per country where the customers are10. Passing exchange prices on means holding a data contract too.
What about hourly prices?
Is an hourly price still enough?
The statute requires price swings to be reflected at intervals "at least equal to the settlement intervals of the respective market"3. Since 1 October 2025 the day-ahead auction has run on quarter hours. Whether a tariff that keeps passing on hourly values still fits the definition, no authority had explicitly said by mid-October 2026. A tariff system built today should cope with 96 prices a day.
What metering the tariff needs
A price per quarter hour is useless while consumption only exists as a yearly total. Each price needs a quantity.
The Metering Point Operation Act is blunt about it. Once a final customer using up to 100,000 kWh a year has an iMSys, consumption is measured as a series of meter readings11. As standard, the metering point operator sends that series to the supplier daily for the previous day, billing being one of the purposes12. In the gateway the function is TAF 7 (Chapter 4): meter readings every 15 minutes, transmitted daily.
And TAF 2? Sounds like the tariff function. It's really a multi-rate meter gone digital: the gateway adds up consumption in tariff levels whose time windows are fixed in advance. For the three levels of module 3 that's an option, according to the BDEW application guide (Chapter 5)13. The exchange price, though, is only known the day before, and for each quarter hour separately. A window configured weeks ago knows nothing about it.
There's a wrinkle with TAF 7, though. In November 2023 ruling chamber 8 noted that TAF 7 "may not yet be used for billing", in the context of legal metrology rules14. Chapter 5 shows how metering point operators deal with that for module 3 today.
A dynamic tariff under section 41a is usually billed via TAF 7 at the metering point, with billing that can handle 96 values a day. The act itself doesn't prescribe a TAF. TAF 2 won't do, however finely its windows are cut.
What billing has to cope with
Do the maths. 96 values a day make 35,040 quarter-hour values per market location per year, plus as many prices. A customer read once a year produces one reading.
The transport is settled. Quarter-hour values go from the metering point operator to the supplier as MSCONS messages, the "load profile for the previous day" in the application handbook's words15. Since 6 June 2025 these series have been transmitted under determination BK6-24-17416. Chapter 7 has the details.
What the systems behind it must do is spread across the statute. The supplier may process readings for billing, tariff calculation included, and normally has to delete them within three years after the end of the year of recording17. Where no true value is available, the metering point operator forms a substitute or provisional one11. Time series are versioned for this15. A quarter hour can come back with a different value after the bill has gone out.
Pair a dynamic tariff with module 3 under §14a, and two time-variable prices end up on one bill: the exchange price in the energy component and a three-level grid charge. The supplier then has to show grid charges per tariff level separately14.
The real weak spot lies between installation and the first bill. In September 2026 the Federal Network Agency made clear that "mere installation" of a metering system isn't enough. Only once it reliably records and transmits quarter-hour values is the groundwork for time-variable tariffs laid, the agency said6. In July 2025 its ruling chamber 8 had described the same pattern for module 3: implementation appeared to be slow "even when the customer can show an intelligent metering system as the prerequisite"18.
Nobody measures how long it takes
No one publishes how long it takes from installing an iMSys to the first bill based on quarter-hour values. The agency's rollout statistics count installed systems, not delivered values.
Grid charges today: the §14a modules
Grid charges have acquired a clock too, at least for controllable consumption devices. On 23 November 2023 the agency's ruling chamber 8 set three modules, covered in depth in Chapter 514.
Modules 1 and 2 have applied since 1 January 2024: either a flat €80 gross a year plus a stability bonus, or 40 percent of the energy rate for a separately metered device with no standing charge. Neither needs an iMSys14.
Module 3 is the time-variable grid charge: three tariff levels, first on the price sheet for 2025, billed since 1 April 2025, only on top of module 1 and only with an iMSys. Market communication release cycles were the chamber's reason for the later billing start14. Which level applies when, and in which quarters, is fixed in advance on the price sheet14. Grid operators have to publish it by 15 October for the following year, as expected charges if need be19. That's the difference from the exchange price.
Then, in 2026, enforcement started. As of 13 October 2026 the Federal Network Agency lists four distribution system operators over shortcomings "in particular in connection with module 3"20. Three fixed levels, known long in advance. And even that stumbles.
The 2027 price sheets fall due one day after this chapter's status date. The transmission system operators published their provisional charges on 1 October 2026: 3.54 cents per kWh on average at extra-high voltage and its transformation level, up from 2.86 cents in 2026. That includes a federal subsidy of €5.525 billion, almost €1 billion less than for 2026. The law behind it, a new section 24d EnWG, hadn't been passed on that day. Without legal certainty by 7 December 2026, the TSOs expect higher final charges21.
AgNes: the framework from 2029
"The date of publication is set as 1 January 2027." That's how the operative part of the draft ends, at item 20, in the agency's own English version22.
AgNes stands for Allgemeine Netzentgeltsystematik Strom, the general structure of electricity grid charges. It sits with the agency's Grand Ruling Chamber Energy, file number GBK-25-01-1#3, not with ruling chamber 8 of the modules23. The draft came out on 6 August 2026, with comments due by 18 September. A decision is planned for 2026, follow-up determinations for 202724.
There's a reason for the hurry. The Electricity Grid Charges Ordinance (StromNEV) lapses at the end of 31 December 2028, and from 1 January 2029 grid charges are to be set and billed under the new determination22. Around €37 billion a year is at stake, which the agency puts at roughly 30 percent of a household's electricity costs24. No decision had been adopted by 14 October 2026, so what follows comes from the draft.
Households on low voltage using up to 100,000 kWh keep a standing charge plus an energy rate. New is a prosumer surcharge for withdrawal points with generation behind the same grid connection: 70 to 90 percent of the standing charge, plug-in solar exempt. From 1 April 2028 suppliers are to show prosumer status on the bill, and by then grid operators must identify the withdrawal points concerned and report them through market communication22.
For grid operators that means a new attribute in their master data, due in eighteen months.
Today, feeding in carries no grid charge at all25. Under the draft, plants above 30 kW would pay a nationwide feed-in charge per kW; a worked example lands at roughly €5 per kW and year. Plants running before publication, or with a final investment decision by then and connection by 4 August 2029, would pay only once 20 years have passed since commissioning22.
Dynamic grid charges are coming, late and not for households. Storage at grid and transformation levels 1 to 5 would pay them from 2030 at the earliest and 2033 at the latest, generation between 2032 and 2035, each only if the chamber spells out the design two years ahead. For final customers the agency holds off "for the time being"22.
| Feature | Today | AgNes draft, from 2029 |
|---|---|---|
| Household, low voltage | standing charge and energy rate26 | standing charge and energy rate, standing charge bringing in 20 to 40 percent of revenue |
| Household with own generation | same as any household | surcharge of 70 to 90 percent on the standing charge |
| Controllable consumption device | module 1, module 2, or module 1 plus 3 | module 3 unaffected, no prosumer surcharge under module 2, nothing on module 1 |
| Generation above 30 kW | no grid charges for feed-in | feed-in charge per kW, existing plants only 20 years after commissioning |
| Dynamic grid charge | none | storage 2030 to 2033, generation 2032 to 2035, final customers not for now |
What becomes of the modules
The short answer is item 12.5 of the draft: "The levying and further development of time-of-use network tariffs pursuant to section 14a EnWG ('module 3') remain unaffected"22. So module 3 survives, and under the draft it's the only time-variable grid charge households will see for now.
Module 2 gets a side remark in the reasoning: where module 2 means no standing charge, there's no prosumer surcharge either22. Module 1 isn't expressly mentioned in the draft.
Chamber 8's own determination sets no end date for the modules in its operative part. A 2024 to 2028 time limit was still in the key points paper of the first consultation but didn't make it into the decision. Only the transition rules for older §14a arrangements run until 31 December 2028, night storage heaters excepted14.
How module 3 will develop is open. Many consultation submissions proposed exactly that instead of dynamic grid charges, some with five to six time windows22. The draft has no concrete proposals on it, the Federation of German Consumer Organisations (vzbv) complains26.
Open until the decision
The content above comes from the draft of 6 August 2026 and may change before the decision. What happens to modules 1 and 2 from 2029 is not expressly settled by either the draft or chamber 8's determination.
MiSpeL: a year on consent
On 1 October 2026 the Federal Network Agency adopted its determination on the market integration of storage and charging points, MiSpeL for short, file number 618-25-02. It appeared in the agency's official gazette on 7 October27. It sets out how green power and grid power in a storage unit or bidirectional charging point are told apart, so that EEG support and levy privileges land on the right quantities. There are two new routes, the delimitation option with formula sets and the flat-rate option with a single bidirectional meter. The second only applies where the solar systems behind the feed-in point add up to no more than 30 kWp27.
Both work in quarter hours. The determination defines simultaneity explicitly as a 15-minute interval27. No quarter-hour values, no MiSpeL. The AgNes draft builds on this: it treats MiSpeL's bidirectional charging points like co-located storage and exempts grid power fed back from energy rates, as far as metering can separate it22.
Then the sentence that matters, item 9 a): "Until 30 September 2027, the provisions of the determination are only applicable if the claims under items 1 to 4 and the allocation under item 5 are asserted with the consent of the respective grid operator and metering point operator"27.
At the same time item 7 obliges exactly these grid and metering point operators to make the claims possible27. They have to cooperate. Until then, though, only those with their consent can invoke the determination.
Why the transition period? The industry is meant to adapt its market communication processes, which, however, are "not part of the subject matter of this determination"27. The question of suitable time series types, raised among others by the new-energy association bne (Bundesverband Neue Energiewirtschaft), the German Association of Energy and Water Industries (BDEW) and the storage association BVES, is explicitly left open. The agency itself calls the period of just under a year "tight"27.
One year of transition, one format cycle: Market communication data formats normally change twice a year, on 1 April and 1 October16. On 1 October 2026, the very day of the MiSpeL decision, ruling chamber 6 announced that the EDIFACT formats need no adjustment for 1 April 202728. If the regular cycle holds, 1 October 2027 is the earliest date for amended format descriptions. That's the day after the consent reservation expires.
The simple option waits for Brussels
The flat-rate option only applies from the month after the European Commission grants state aid approval for section 19(3c) EEG27. No such approval could be found by mid-October 2026. Until then, only the more demanding delimitation option is open.
Counterpoint: prosumer surcharge, processes, pace
The AgNes draft drew around 1,000 submissions, according to the Federal Network Agency. Two points draw most of the criticism, the prosumer surcharge and the feed-in charge29. For households, the first one matters.
The German Solar Association (BSW-Solar) puts it at up to €165 a year and considers it defensible to extend the feed-in charge to new plants of every size instead. The reform must not "slow down" people who invest in solar panels, batteries, electric cars or heat pumps, says its managing director Carsten Körnig. The German Renewable Energy Federation (BEE) wants the surcharge scrapped; its president Ursula Heinen-Esser calls it "neither cost-reflective nor good for the system"29. The vzbv, in its submission of 16 September 2026, asks for the surcharge to be graded by plant size26.
In the draft itself, the agency answers: "Lower, volume-based use of the grid does not mean that costs in the grid are saved as well"22. The lines are built. Their costs remain.
For digitalisation another objection weighs more. The bne misses a roadmap for data requirements and market processes: "New payment obligations must not take effect before prices and billing processes are firmly established." The draft offers "no reliable basis for implementation yet", says Kerstin Andreae, who chairs the BDEW executive board, and even the two years planned wouldn't be enough29. Those two years are exactly what agency president Klaus Müller had named as the goal24.
The argument isn't new. Even for module 3, as the draft itself records, several submissions said eighteen months of implementation time had fallen short22.
With MiSpeL the agency recorded the same split in the decision. bne and BVES wanted it applied at once, if need be before market communication was ready. BDEW and the municipal utilities' association VKU wanted to wait until the processes worked at mass-market scale. The agency went for what it calls a "middle way": the consent reservation27.
Both camps have a point. The agency hasn't settled the dispute, though. It has postponed it by a year and pushed it down into every single grid area.
What grid and metering point operators should check now
Tariffs, module 3, AgNes and MiSpeL all hang on the same quarter-hour values. Four checks:
Measure delivery, not installation
An installed metering system counts in the statistics. For tariffs and module 3, what counts is whether the series of register readings reaches the supplier complete every day. Track the share of metering locations with gap-free previous-day values as a KPI of its own.
Bill module 3 end to end
Four distribution system operators are already on the agency's enforcement list20.
Prepare the prosumer flag
The draft requires identification by 1 April 2028. Check whether your master data shows today which grid connection has a generation plant behind it, tenant electricity and shared building supply included.
Don't sit on MiSpeL requests
Until 30 September 2027 you have a say in whether the determination applies. Decide who in your organisation gives consent, and document how you exchange quantities without a defined format.
Open deadlines for this chapter
Live from the deadline calendar, data as of 14 October 2026. When a deadline changes, this list changes with it.
Sources
Primary sources first. Uncertain statements are marked as uncertain in the text rather than left out.
- Section 41a Energy Industry Act (EnWG), load-variable, time-of-day or dynamic and other electricity tariffs and fixed-price contracts, paragraphs 2 to 7 (German). gesetze-im-internet.de, retrieved 14 October 2026.
- German Bundestag: Act on the Restart of the Digitalisation of the Energy Transition as passed, Bundesrat printed paper 161/23 of 21 April 2023, Article 1 no. 4 (amendment of section 41a(2) sentence 3 EnWG) (German). bundesrat.de, retrieved 14 October 2026.
- Section 3 no. 95 Energy Industry Act (EnWG), definition of an electricity supply contract with dynamic tariffs (German). gesetze-im-internet.de, retrieved 14 October 2026.
- Act amending energy law to strengthen consumer protection in the energy sector and amending further energy law provisions of 18 December 2025, Federal Law Gazette 2025 Part I No. 347 of 22 December 2025, Article 1 (amendment of section 41a EnWG) (German). recht.bund.de, retrieved 14 October 2026.
- Federal Network Agency and Federal Cartel Office: Monitoring Report 2025, published 26 November 2025, PDF version as of 26 January 2026, p. 5 and p. 163, figure 93; on 14 October 2026 the overview page lists no newer report (German). data.bundesnetzagentur.de, retrieved 14 October 2026.
- Federal Network Agency: press release on the rollout of intelligent metering systems as of 30 June 2026, 21 September 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Section 35(1) sentence 2 no. 1 Metering Point Operation Act (MsbG), reasonable charges for additional services of the default metering point operator, caps for early installation of an intelligent metering system (German). gesetze-im-internet.de, retrieved 14 October 2026.
- Section 34(2) sentence 2 no. 1 and sentences 3 to 6 Metering Point Operation Act (MsbG), early installation of an intelligent metering system as an additional service, refusal and deferral (German). gesetze-im-internet.de, retrieved 14 October 2026.
- EPEX Spot: 15-minute products live on EPEX SPOT Day-Ahead markets, announcement of 30 September 2025. epexspot.com, retrieved 14 October 2026.
- EPEX Spot: Dynamic Pricing License for Electricity Retailers. epexspot.com, retrieved 14 October 2026. The exchange describing its own product.
- Section 55(1) and (2) Metering Point Operation Act (MsbG), collection of electricity readings (German). gesetze-im-internet.de, retrieved 14 October 2026.
- Section 60(3) no. 3 letter b Metering Point Operation Act (MsbG), transmission of data to the energy supplier (German). gesetze-im-internet.de, retrieved 14 October 2026.
- BDEW: application guide on implementing module 3 of ruling BK8-22/010-A, version 1.2 of 17 July 2026, section 4 (German). bdew.de, retrieved 14 October 2026. Industry association source.
- Federal Network Agency, ruling chamber 8: determination BK8-22/010-A of 23 November 2023, operative items 1 to 4 and 6, recitals 8, 120 and 133 to 135 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- BDEW, EDI@Energy: MSCONS application handbook, version 3.2, published 1 April 2026, chapter 7; published with notice no. 56 of ruling chamber 6, binding since 1 October 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Federal Network Agency, ruling chamber 6: determination BK6-24-174 on the transmission of meter reading series, decision of 24 October 2024, p. 13 on the half-yearly format cycle; procedure page with start of application on 6 June 2025 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Section 69(1) and (3) Metering Point Operation Act (MsbG), processing of readings for the purposes of the energy supplier (German). gesetze-im-internet.de, retrieved 14 October 2026.
- Federal Network Agency, ruling chamber 8: information letter 03/2025 of 10 July 2025, item 1 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Section 20(1) sentences 1 and 2 Energy Industry Act (EnWG), publication of network access charges (German). gesetze-im-internet.de, retrieved 14 October 2026.
- Federal Network Agency: publication of administrative enforcement measures under determination BK8-22/010-A, as of 13 October 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Zeitung für kommunale Wirtschaft: transmission system operators publish provisional grid charges for 2027, news item of 1 October 2026 (German). zfk.de, retrieved 14 October 2026. Trade press, reporting the TSOs' figures.
- Federal Network Agency, Grand Ruling Chamber Energy: draft determination on the general system of electricity grid charges, GBK-25-01-1#3, of 6 August 2026, operative items 1.2, 2, 8.2, 8.3, 9, 10.2, 12, 17.4, 17.8 and 20, recitals 4, 81, 88, 90, 292, 298 and 503, worked example on p. 149 (German). bundesnetzagentur.de; operative part in the agency's English version: bundesnetzagentur.de, both retrieved 14 October 2026.
- Federal Network Agency, Grand Ruling Chamber Energy: AgNes determination procedure, GBK-25-01-1#3, procedure page as of 21 September 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Federal Network Agency: press release on the start of the consultation on the reform of the electricity grid charge system, 6 August 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Section 15(1) sentence 3 Electricity Grid Charges Ordinance (StromNEV) (German). gesetze-im-internet.de, retrieved 14 October 2026.
- Federation of German Consumer Organisations (vzbv): Netzentgelte fair verteilen, submission on the AgNes draft determination of 16 September 2026, section III nos. 1, 2 and 4 (German). vzbv.de, retrieved 14 October 2026.
- Federal Network Agency: determination on the market integration of storage and charging points (MiSpeL), file no. 618-25-02, of 1 October 2026, operative items 7 to 9, reasons pp. 7, 14, 25, 28, 60, 72 and 92 f. (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Federal Network Agency, ruling chamber 6: notice no. 58 on data formats for market communication, 1 October 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- pv magazine: AgNes, "Hier muss noch nachgearbeitet werden", 21 September 2026 (German). pv-magazine.de, retrieved 14 October 2026. Trade press, reporting submissions by BSW-Solar, BEE, bne and BDEW.