Chapter 5 · Part III: Functions and control
Grid-oriented control under §14a EnWG
§14a EnWG without the myths: curative control with a transition rule to 2028, the 4.2 kW minimum, the control chain via CLS, modules 1 to 3.
Two rulings, four days apart. In BK6-22-300 Germany's Federal Network Agency set out when a grid operator may dim heat pumps, wallboxes, air conditioners and battery storage, and in BK8-22/010-A what their owners save on grid charges in return, and the two run on separate deadlines.
Dimming is curative. A threat to the grid has to be established first, on the basis of real-time readings, and even then the owner keeps a right to at least 4.2 kW. Preventive control based on grid planning survives only as a transition (until the end of 2028 at the latest). The grid operator passes the command via the metering point operator and the gateway's CLS channel to a control box.
Modules 1 and 2 don't need an intelligent metering system (iMSys), module 3 does. That's exactly where the agency has been threatening penalty payments since May 2026.
Two rulings, two chambers
On 23 November 2023 Ruling Chamber 8 of the Federal Network Agency decided what controllable consumer devices save on grid charges1, and four days later Ruling Chamber 6 decided when the grid operator may dim them in exchange2. Both have applied since 1 January 2024.
In the statute it's one deal. Section 14a(1) of the Energy Industry Act (EnWG) lets the agency require agreements on grid-oriented control "in return for grid charge reductions"3, and yet the agency spread the exchange over two chambers: control, including the guaranteed minimum power and documentation, in BK6-22-300, and the three modules of the charge reduction in BK8-22/010-A.
So a question about the control box goes to BK6, one about the price sheet to BK8. Even the penalty proceedings over module 3 carry BK8 case numbers.
BK6-24-242 is not a §14a case number
The agency's proceedings page on §14a lists only BK6-22-300 and BK8-22/010-A. Ruling Chamber 6's list of 2024 decisions, its pending proceedings and its current notices contain no case BK6-24-242 (as of 14 October 2026)5,6,7,8. If that number turns up in a document on §14a, ask for the source.
Who has to take part
Four groups, one threshold. Heat pumps and cooling systems behind one grid connection are added up per group, so three small heat pumps in a cascade count as one device once their combined rating exceeds 4.2 kW4.
Every device commissioned after 31 December 2023 has to take part. The ruling has exactly two exceptions. One covers charging points run by bodies with special road traffic rights, such as police and fire services; the other covers heat pumps and cooling systems that don't heat or cool homes, offices or other rooms people spend time in, in particular units serving essential commercial purposes or critical infrastructure. A company fleet's wallbox is still in, and so is a business's battery. A grid without congestion is no excuse4, and commissioning doesn't have to wait until the iMSys and control box are in2.
Money isn't all the owner gets. A grid operator may not delay or refuse the connection of a controllable consumer device by pointing to a lack of grid capacity4. The discount is only half the deal.
The 4.2 kW come from charging technology. Chamber 6 had consulted on 3.7 kW, but a charging point needs at least 6 amperes per phase, around 4.1 kW on three phases, and a technical safety margin made it 4.2 kW2. The same number does two jobs on purpose, as threshold and as minimum power.
Curative: when dimming is allowed
One sentence in the ruling carries this whole chapter.
Strictly curative, in the ruling's words
"It is moreover a purely curative measure. This means that grid-oriented control may not be used preventively by the grid operator." On triggering, control takes place "exclusively on the basis of a grid status assessment including real-time readings", so that the grid operator acts "exclusively where there is an acute need for action for a current reason, and not preventively"2.
Annex 1 turns this into a procedure. The trigger is a current- or voltage-related threat or disruption in a network section, which the grid operator establishes through the grid status assessment; it then passes the reduction to the metering point operator without undue delay, and under the annex's presumption that means five minutes at most. Every controllable device in the section is treated alike. Dimming goes only as far as needed, and the way back is in steps4. Upstream grid operators have no role under §14a2.
VDE FNN, the forum within the electrical engineering association VDE that writes the technical rules for grid operation, confirmed the five minutes in April 2025. It also reads them as the maximum validity of a grid status assessment, so an older one no longer counts9.
Does curative mean waiting for the fuse to blow? No. Under the FNN recommendation a grid operator may set its power limit at 80 percent of the permissible continuous current rating or of the permissible voltage drop, which leaves the rest as room to check and react10.
There's an upward exception. For directly controlled heat pumps and cooling systems rated above 11 kW, the minimum is the connected load times a scaling factor, presumed appropriate at 0.4 until a different recommendation exists, which is roughly 4.2 divided by 114,2. In April 2025 VDE FNN recommended sticking with it11. Storage units and wallboxes keep their 4.2 kW, even where that's less than 40 percent of their rating2.
So the 40 percent rule covers only two of the four groups: per device under direct control, and as the base of the overall calculation under an EMS4.
The exception: preventive until the end of 2028
Clause 10.5 of Annex 1 allows preventive control if grid planning data lead the operator to expect a threat and the operator can't yet meet the requirements for grid-oriented control. The limits: until 31 December 2028 at the latest, for 24 months per network section from the first use, two hours a day, and the minimum power stays4. The chamber justifies the cap by noting that this kind of control "as a rule" doesn't rest on real-time data2.
"There is no preventive dimming" therefore only holds without a footnote from 2029. Until then two regimes run side by side. Since 1 March 2025 grid operators have had to report both each month, per network section, on the VNB-Digital platform4,12.
The control chain
Once a metering point has an iMSys, control has to run through the smart meter gateway. That's in the statute, with a single exception for the agile rollout that ends with the application update3. In the mandatory rollout the default metering point operator installs the control unit, and the data traffic through it is one of its standard services under the Metering Point Operation Act (MsbG)13,14.
The ruling cuts responsibility into three pieces. The grid operator assesses the grid and hands over the order. The metering point operator gets it into the metering system. Making the device follow is the owner's job2.
Inside the gateway only one party has write access, the gateway administrator. It configures which connections the CLS channel allows, and through that channel the active external market participant (aEMT in German shorthand) talks to the control box; the gateway secures the link without reading the traffic15. What the control box has to do is set out in a VDE FNN requirements document, currently version 1.5 of August 202516. Since 2025 manufacturers have, as a rule, proved through a BSI certification that it meets BSI TR-03109-517,18,19. From the box, the setpoint goes to the device or to an energy management system.
Whether a device is controlled directly or through an energy management system is the owner's call, device by device4. Under direct control each device gets its own setpoint and keeps at least 4.2 kW. An EMS instead gets one total value that the owner allocates freely, and the minimum is then 4.2 kW plus (number of devices minus one) times a simultaneity factor times 4.2 kW; the factor falls from 0.8 for two devices to 0.45 from nine. If a heat pump or cooling system above 11 kW is part of it, 0.4 times the combined rating of all heat pumps replaces the 4.2 kW base, and likewise for cooling systems. With both groups present, the larger of the two values applies4.
To check the maths: a wallbox, a heat pump and a storage unit, all below 11 kW. Direct control leaves 12.6 kW. An EMS gets 4.2 + 2 × 0.75 × 4.2 = 10.5 kW, so less guaranteed power, but a free hand in how it's spread.
The digital interface on the last stretch to the device now has a minimum standard. Back in 2023 the chamber considered EEBUS fit to carry both the command and the proof of execution, without ruling out other interfaces2. The FNN recommendation describes EEBUS as the "industry-wide favoured solution for a minimum standard". The agency, though, still considers other variants possible in principle, to be settled between the parties involved20.
And the box itself? The 2023 ruling had already asked that the recommendations anticipate the control function moving elsewhere, into the gateway for example2. The box would then disappear as a separate device and the rest of the chain would stay. Chapter 4 covers where protection profile and field tests stand, along with the open question of which certification basis some competitive metering point operators rely on for the gateways with integrated control they already use.
The supplier gets no balancing compensation for the energy that dimming removes. It gets a message through electronic market communication, for every grid-oriented control action and at the start of preventive control4. Under notice no. 58 the API web services will probably stay limited, until further notice, to market location identification and control21. Chapter 7 covers the processes behind them.
From readings to grid status
Between a reading and a command sits a calculation, which the ruling calls the grid status assessment: the loading of a network section derived from current measurements and grid models4.
How much metering is enough? Until a recommendation arrived, the presumption was minute-level real-time values from at least 15 percent of all connections in a network section, or 7 percent plus measurements at the transformer feeders4. The recommendation came in April 2025, and on 14 April the agency recommended it for use22. The FNN guidance works out, per grid topology, what share of suitable connections needs an iMSys delivering TAF 10 data, and it assumes communication never fails23.
| Measurement in the substation | Radial grid | Meshed grid, one transformer | Meshed grid, two or more transformers |
|---|---|---|---|
| per low-voltage feeder | 15 % | 5 % | 0 % |
| transformer total only | 30 % | 10 % | 0 % |
| none | 70 % | 40 % | 25 % |
The table really answers an investment question. In a radial grid, measuring each feeder in the substation cuts the share of gateways that must deliver grid status data from 70 to 15 percent. Then there's the cap in section 34 MsbG, under which minute-level grid status data is an additional service, limited to a quarter of the connections the metering point operator has equipped with an iMSys in the grid area14. The two percentages use different bases, yet for planning they point the same way, to the substation first.
Where the calculation runs, the ruling doesn't say. On the market the layer is called a low-voltage control system or DERMS, for distributed energy resource management system. A pilot that GWAdriga announced on 5 February 2026 shows what it can look like: at Westfalen Weser Netz a control system from envelio is coupled directly to CLS management, TAF 10 data feeds a digital twin, and when congestion appears, control commands go out automatically through CLS management. Twenty low-voltage grids are part of the pilot24.
Three modules, two metering worlds
The reward sits in BK8-22/010-A. If the owner doesn't choose, the grid operator bills module 125.
| Feature | Module 1 | Module 2 | Module 3 |
|---|---|---|---|
| What | EUR 80 gross a year plus an operator-specific stability bonus1 | energy price cut to 40 percent, no standing charge1 | time-variable grid charge with high, standard and low tariff levels1 |
| Combination | default module | instead of module 1 | only on top of module 1 |
| Metering | no iMSys needed, it can come later26 | separate metering at its own market location, quarter-hour metering not required1 | iMSys mandatory, no interval metering of the RLM type1 |
| Tied to the rollout | no | no | yes |
| Applies since | 1 Jan 2024 | 1 Jan 2024 | price sheet for 2025, billing from 1 Apr 20251 |
Nobody needs an iMSys for modules 1 and 2. Once the owner has asked the metering point operator or the grid operator to make the device controllable, the owner's duty is met, and the reduction doesn't wait for the hardware3,2. If a grid operator grants module 1 only once a gateway is installed, it's holding back money the customer is owed.
Module 3 works differently. It rests on the economic incentives that section 14a(1) sentence 2 names explicitly as a form of grid-oriented control1,3, and it has nothing to do with section 14c EnWG, which governs market-based procurement of flexibility services and expressly leaves §14a untouched27. (Dynamic tariffs and the grid charge reform follow in chapter 6.)
TAF 2 or TAF 7 for module 3?
Ruling BK8-22/010-A of 23 November 2023 states that TAF 2 does "not yet allow 3 tariff levels" and that TAF 7 "may not so far be used for billing"1. The BDEW application guide to module 3 of 17 July 2026 names both routes: time windows via TAF 2 in the gateway, or the TAF 7 series of register readings, which the metering point operator converts into values per tariff level in its back end while respecting calibration law26. So ask your metering point operator which route it takes. Either way, the grid operator receives values per tariff level.
The usual order route runs through the supplier. The customer orders from the supplier, the supplier orders the configuration from the grid operator, the grid operator orders the time windows in the metering system from the metering point operator, and only after a positive confirmation do the billing data follow25. Four roles in a row, and if one stalls, the customer waits.
That's exactly where it jams. On 28 May 2026 the Federal Network Agency threatened two grid operators with penalty payments, after complaints from market participants and consumers that "especially" concerned module 3. They had until 30 September 2026 to fix the shortcomings28. As of 13 October 2026 the enforcement list shows four proceedings against distribution system operators, all at the stage of a threatened penalty, none imposed29. The introduction on the same page still speaks of two companies. Count the table.
Modules 1 and 2 belong on the price sheet and in billing, whatever the rollout status. Module 3 is a process project: configuration orders, time windows in the gateway or the back end, values per tariff level. That's what the regulator measures.
Counterpoint: how much transition is enough?
The fiercest dispute was over clause 10.5, and it came late: the 24-month clock only appeared in the draft of the second consultation, which closed on 27 July 20235,2. Grid operators rejected the limits (24 months, two hours a day, the 4.2 kW floor) outright or wanted them relaxed considerably. One distribution system operator even saw grid stability at risk. The energy industry association BDEW feared that operators might skip their first control actions just to keep the clock from starting, and proposed case-by-case reviews with possible extensions2.
The chamber held its ground. The call to carry on "as before" could "in no way" be reconciled with the growth in heat pumps and electric vehicles, it wrote on 27 November 2023; the "lamentably inadequate state of observability of the low-voltage grid" had long been known, and the BDEW proposal was "not suitable"2. Each grid operator had to act on its own responsibility. With service providers, if need be.
Pressure from the other side came from building technology, and it worked. The air conditioning association FGK, the building services federation BTGA and the heat pump association BWP called for a minimum power proportional to the rating of large heat pumps. The chamber agreed, and that's where the 0.4 factor comes from2.
A third group came away empty-handed. Under slogans such as "no §14a without §14c" and "introduce preventive congestion management", numerous consultation participants wanted the devices' flexibility to be used through markets first. The chamber refused: §14a governs last-resort control in an emergency and doesn't pre-empt the competition over market-based flexibility2.
Preventive, by the way, means two different things in this dispute. The consultation participants wanted flexibility bought on a market before congestion builds up; clause 10.5 allows dimming based on grid planning, without real-time data and only for a while. Whether the chamber's bet on the 24-month clock pays off will show on 1 January 2029.
Deadlines and legacy devices up to 2029
| Date | What applies |
|---|---|
| 1 Jan 2024 | BK6-22-300 and BK8-22/010-A in effect, modules 1 and 2 apply4,1 |
| 1 Mar 2025 | first publication of control actions per network section4 |
| 1 Apr 2025 | billing of module 31 |
| 31 Dec 2026 | end of the exemption for new devices that demonstrably can't be controlled4 |
| 31 Dec 2028 | end of preventive control and of the old charge rules for legacy devices4,1 |
| 1 Jan 2029 | controllable legacy devices with an earlier §14a discount move under the new ruling4 |
For legacy devices one question counts: was a reduced grid charge actually billed before 1 January 20241? Night storage heaters keep their old arrangement until they stop operating. Controllable legacy devices without an earlier discount aren't covered at all, though their owners may switch voluntarily at any time, just not back4. The exemption for devices that can't be controlled has its price, since they lose the guaranteed connection under clause 52.
There's no amendment. The list of notices on BK6-22-300 ends with no. 6 of 14 April 2025, and Ruling Chamber 6's current notices up to 2 October 2026 contain nothing on §14a5,8. The only built-in review is a duty on grid operators to revisit their recommendations at least every three years. The recommendations were due by 1 October 2024 and 1 January 20252, and the final versions date from March and April 202530,9. When the first review falls due depends on where the clock starts, somewhere between autumn 2027 and spring 2028, just before or already in the last year of preventive control.
Four checks for grid and metering point operators:
Know the clock in each network section
Record for every network section whether, and since when, it has been under preventive control. The 24 months run from the first use; on 31 December 2028 they end everywhere, however much of them would be left.
Test your metering concept against the FNN table
For every network section with foreseeable control needs, record the topology, any measurement in the substation and the share of gateways delivering TAF 10. Only then can you tell whether substation measurement or minute-level gateway data is cheaper. The cap from section 34 MsbG belongs in that sum.
Decouple modules 1 and 2 from the rollout
No gateway, still a discount.
Test the chain up to the acknowledgement
Run one command from the control system to the device, with timestamps at every hand-over. The five minutes run from the grid status assessment to the trigger at the metering point operator; after that the device has to follow without undue delay4. Market communication counts the hand-over to the metering point operator in seconds: the instruction has to reach it at least 60 seconds before the effective period starts, it replies within 30 seconds, and it confirms or rejects the set-up at the latest one second before the start31,32. That reply covers the chain up to the control box. Whether the device followed only shows in its acknowledgement, which exists only over a digital interface. If it has justified doubts, the grid operator can request the metering point operator's logs30. Keep the documentation for at least two years4.
Open deadlines for this chapter
Live from the deadline calendar, data as of 14 October 2026. When a deadline changes, this list changes with it.
Sources
Primary sources first. Uncertain statements are marked as uncertain in the text rather than left out.
- Federal Network Agency, Ruling Chamber 8: ruling BK8-22/010-A of 23 November 2023, grid charges for controllable connections and consumer devices (NSAVER), operative clauses 1 to 7 and paragraphs 117, 120 and 135 (German; quotations are our translation). bundesnetzagentur.de, retrieved 14 October 2026.
- Federal Network Agency, Ruling Chamber 6: ruling BK6-22-300 of 27 November 2023 on integrating controllable consumer devices and controllable grid connections under §14a EnWG, operative part and reasons, in particular pp. 3, 14 f., 20 f., 22, 25 f., 28 f., 32, 36 f., 40 f., 66 to 70 and 85 (German; quotations are our translation). bundesnetzagentur.de, retrieved 14 October 2026.
- Section 14a Energy Industry Act (EnWG), grid-oriented control of controllable consumer devices and controllable grid connections, paragraphs 1 and 4 (German). gesetze-im-internet.de, retrieved 14 October 2026.
- Federal Network Agency, Ruling Chamber 6: Annex 1 to ruling BK6-22-300 of 27 November 2023, clauses 2.4, 2.6, 3, 4.1 to 4.8, 5, 7.3, 8.3, 8.4 and 10.1 to 10.7 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Federal Network Agency: proceedings page BK6-22-300 with notices nos. 1 to 6 and the consultation archive (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Federal Network Agency, Ruling Chamber 6: decisions 2024 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Federal Network Agency, Ruling Chamber 6: pending proceedings (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Federal Network Agency, Ruling Chamber 6: current notices, latest entry dated 2 October 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- VDE FNN: guidance on the maximum period between the result of the grid status assessment and the grid operator triggering the reduction towards the metering point operator, version 1.0, April 2025, chapters 2 and 3 (German). vde.com, retrieved 14 October 2026.
- VDE FNN: guidance on technical parameters for assuming a threat or disruption in a network section and on the stepwise withdrawal of control actions, version 1.0, March 2025, section 2.4 (German). vde.com, retrieved 14 October 2026.
- VDE FNN: guidance on calculating the minimum grid-effective power draw (minimum power), version 1.0, April 2025, chapters 2 and 4 (German). vde.com, retrieved 14 October 2026.
- Federal Network Agency, Ruling Chamber 6: notice no. 4 on BK6-22-300 of 5 February 2025, publications on VNB-Digital (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Section 29 Metering Point Operation Act (MsbG), equipping metering points with intelligent metering systems, control units and modern metering devices, paragraph 1 no. 2 letter a (German). gesetze-im-internet.de, retrieved 14 October 2026.
- Section 34 Metering Point Operation Act (MsbG), standard and additional services of the metering point operator, paragraph 1 nos. 5 and 6 and paragraph 2 sentence 2 no. 6 (German). gesetze-im-internet.de, retrieved 14 October 2026.
- BSI: staged model for developing the standards for digitalising the energy transition, part 2 state of the art, version 2.1 of 11 November 2021, sections 4.1, 4.4 and 5.2 (German). bsi.bund.de, retrieved 14 October 2026.
- VDE FNN: document overview for metering, entry "Lastenheft Steuerbox 1.5", status 08/2025 (German). vde.com, retrieved 14 October 2026.
- BSI: BSI TR-03109-5, communication adapters, version 1.0 of 24 November 2023, sections 1.6, 1.7, 2.3.2 and 2.4 (German). bsi.bund.de, retrieved 14 October 2026.
- VDE FNN: update of the test cases for the FNN control box, news item of 12 May 2026, test specification version 1.2 for control box requirements specification 1.5, with test cases for the EEBUS and KNX digital interfaces and on certification under BSI TR-03109-5 (German). vde.com, retrieved 14 October 2026.
- Federal Office for Information Security (BSI): BSI TR-03109-5, communication adapters, overview page (German). bsi.bund.de, retrieved 14 October 2026.
- Federal Network Agency, Ruling Chamber 6: notice no. 5 on BK6-22-300 of 17 March 2025, recommendations under operative clauses 2a to 2c (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Federal Network Agency, Ruling Chamber 6: notice no. 58 on data formats for market communication of 1 October 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Federal Network Agency, Ruling Chamber 6: notice no. 6 on BK6-22-300 of 14 April 2025, recommendations under operative clauses 2e to 2g (German). bundesnetzagentur.de, retrieved 14 October 2026.
- VDE FNN: guidance on a standardised procedure for grid status assessment based on real-time readings in the low-voltage grid, version 1.0, April 2025, section 6.2, table 1 (German). vde.com, retrieved 14 October 2026.
- GWAdriga: pilot operation started, low-voltage control system coupled with CLS management, news item of 5 February 2026 (German). gwadriga.de, retrieved 14 October 2026. Company source.
- Federal Network Agency, Ruling Chamber 8: answers to frequently asked questions from industry on §14a EnWG, as of 17 July 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- BDEW: application guide on implementing module 3 of ruling BK8-22/010-A, version 1.2 of 17 July 2026, sections 2 and 4 (German). bdew.de, retrieved 14 October 2026. Industry association source.
- Section 14c Energy Industry Act (EnWG), market-based procurement of flexibility services in the electricity distribution grid, paragraph 1 (German). gesetze-im-internet.de, retrieved 14 October 2026.
- Federal Network Agency: proceedings over inadequate implementation of grid charge reductions for electric vehicles and heat pumps, press release of 28 May 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- Federal Network Agency, Ruling Chamber 8: publication of administrative enforcement measures to enforce the obligations under ruling BK8-22/010-A, as of 13 October 2026 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- VDE FNN: guidance on minimum requirements for implementing and documenting a command under direct control or control via an EMS, version 1.0, March 2025, sections 2.1.1, 2.1.2 and 3 (German). vde.com, retrieved 14 October 2026.
- Federal Network Agency, Ruling Chamber 6: Annex 1c to determination BK6-24-174, GPKE part 3, configurations and control commands, reading version, sections 2.1.1 and 2.1.2, use case and sequence diagram "control command from DSO to MPO", pp. 86 to 89 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- BDEW, EDI@Energy: API web services for processing control actions with intelligent metering systems (universal ordering process), version 1.0.0, file
controlMeasuresV1.yaml, servicesvorlaeufigePositiveAntwort,vorlaeufigeNegativeAntwort,positiveAntwort,negativeAntwortandinformationAnweisung; listed on bdew-mako.de as release "API-Webdienste Strom 1.0.0", valid from 29 January 2026 (German). github.com, retrieved 14 October 2026.