Chapter 4 · Part III: Functions and control
Tariff use cases: TAF 1 to 16 and version 2.0
Every tariff use case of the smart meter gateway: what TAF 1 to 16 do, what versions 1.1 and 2.0 changed, and why § 14a control doesn't need TAF 11.
A tariff use case, TAF for short after the German Tarifanwendungsfall, is a function the gateway administrator switches on in the smart meter gateway; it decides what gets measured, how often the gateway stores it and who receives the readings. For a long time the catalogue ran from TAF 1 to 14, and version 1.1 of the guideline left seven of them in 2021. Version 2.0, from December 2024, rebuilt it once more and requires TAF 1, 2, 7, 9, 10 and 14, from 2027 also a redefined TAF 8 and a new TAF 15, while the prepaid case, control and four other use cases are missing from it. A BSI note from September 2025 describes an event-based TAF 5 and a TAF 16 on top.
Heat pumps under § 14a EnWG are dimmed over the CLS channel today, not through TAF 11; the BSI has described the route directly from the gateway, but no device is certified for it yet. Quarter-hourly grid status data is part of the metering point operator's standard service, while minute-level data costs extra and covers a quarter of the equipped connections at most.
No authority publishes which function is actually switched on in how many gateways.
What a tariff use case is
"Gateway with TAF 1, 2, 6, 7, 9, 10 and 14." That is roughly how manufacturers and metering point operators describe the devices1,2, and the line says nothing about what the device measures; anyone who knows the guideline reads that from the numbers.
The term is older than the rollout: the first version of the guideline, dated 18 March 2013, already had the list, TAF 1 to 10 mandatory and TAF 11 to 14 optional5; the idea was one device that does it all.
On 16 January 2019 the BSI added an Annex VII. Its device profile "Basis" kept only TAF 1, 2, 6 and 7 mandatory and made everything else optional5. The mandatory rollout started on this profile in 2020, and a year later the Higher Administrative Court of North Rhine-Westphalia held the same profile to be unlawful5 (chapter 1 tells the story).
A TAF is a certified software function and reaches the field through a firmware update. What a given gateway can do today therefore depends on the version of the guideline it was last certified against. The hardware alone tells you little, which makes any inventory at a metering point operator harder than it looks.
Every tariff use case at a glance
Market overviews still list the catalogue in the old numbering; what version 2.0 of the guideline of 13 December 2024 has made of it is in the right-hand column4. "Mandatory from 2027" there means the level MUSS+: gateways certified against the new version from 1 January 2027 must support the function7, which doesn't mean it is switched on in the field.
| TAF | What the gateway does | Purpose | In version 2.0 |
|---|---|---|---|
| 1 | meter readings without a time series, in version 2.0 monthly plus at start and end, data-minimising | Billing | mandatory |
| 2 | tariff levels in fixed time windows, such as peak and off-peak | Billing | mandatory |
| 3 | tariff switch once a load threshold is exceeded | Billing | no longer included |
| 4 | tariff levels by cumulative consumption | Billing | no longer included |
| 5 | tariff levels linked to events | Billing | not included, BSI note 2025 |
| 6 | readings on demand, for example when a customer moves | Switching processes | as a general retrieval function |
| 7 | meter readings every 15 or 60 minutes, the series of register readings | Billing, settlement | mandatory |
| 8 | power peaks; in version 2.0 newly defined as "load profile formation with maximum values" | Billing | redefined, mandatory from 2027 |
| 9 | current feed-in of a generation plant | Grid operation | mandatory |
| 10 | grid status data such as voltage, current and frequency | Grid operation | mandatory |
| 11 | control of interruptible consumption and generation devices | Control | no longer included |
| 12 | prepaid energy amount with a signal at a threshold | Prepaid billing | no longer included |
| 13 | readings for display over the WAN instead of the home network | Customer information | no longer included |
| 14 | high-frequency readings for value-added services | Energy monitoring | mandatory |
| 15 | processing of readings from registering meters | Billing | new, mandatory from 2027 |
| 16 | capture when an event occurs instead of a fixed interval | Billing | not included, BSI note 2025 |
The descriptions draw on both versions of the guideline and on one metering point operator's overview4,8,2. Older overviews assign some numbers differently; in 2019 the FfE, for instance, filed TAF 9 under controllable devices9.
Version 2.0 also lets a gateway implement tariff use cases it doesn't describe itself, provided supplementary BSI documents do4; the note on TAF 5 and 16 is such a document.
TAF 15 exists, but only since December 2024
The older versions of the guideline have no TAF 15; their catalogue ends at 145,8. Version 2.0 of 13 December 2024 does define it: "TAF15: Verarbeitung von Messwerten aus registrierenden Messeinrichtungen", the processing of readings from registering meters, at level MUSS+4. The BSI note on TAF 5 and 16 from September 2025 also lists it next to TAF 1, 2, 7 and 810. The gateway doesn't register these values itself; it takes them over from a registering meter. The claim that there is no TAF 15 describes the state before version 2.0.
Billing: the workhorses and the prepaid case
Four functions carry billing, and they are the same four that became mandatory in the "Basis" profile in 2019.
TAF 1 is the leanest case. The gateway sends only single meter readings, in version 2.0 once a month plus at the start and end of the validity period, for electricity as well as gas, water and heat4; nothing more leaves it. The guideline justifies this by saying nobody should be able to read consumption behaviour from these values4. Metering is finer all the same, because for final customers with an intelligent metering system and up to 100,000 kWh a year, the law requires a series of register readings or, where available, quarter-hourly registering load profile metering11, and the Metering Point Operation Act of 2016 already provided for the series of register readings12. In the gateway that is usually TAF 7 (chapters 6 and 7).
TAF 2 adds fixed time windows, peak rate by day and off-peak at night: basically the old two-rate meter gone digital. A dynamic electricity tariff needs more, because its price follows the exchange and the exchange doesn't care what time it is.
TAF 6 fetches readings on request, typically when a customer moves or switches supplier.
The real workhorse is TAF 7; without it an intelligent metering system would be an expensive digital meter. It delivers meter readings for consumption and generation every quarter hour (the guideline also allows 60 minutes), and it does so every day. Quarter-hour settlement hangs on it, and dynamic tariffs under § 41a EnWG are usually billed on this same series of register readings. For the time-variable grid charge under module 3, though, TAF 7 is only one of two routes; the other runs through TAF 2, and chapter 5 explains why.
TAF 3, 4 and 8 built tariffs on load thresholds, consumption volumes and power peaks. They have been missing from the guideline since version 1.1 of 20218, and version 2.0 reassigns number 8, to load profile formation with maximum values, required from 20274.
That leaves TAF 12, the prepaid tariff: a prepaid energy amount counts down, and at a threshold a signal goes out2. The prepaid case has been gone from the guideline since version 1.1 of 20218, and version 2.0 hasn't brought it back4.
TAF 12 has nothing to do with feed-in management or redispatch: the current feed-in comes from TAF 9, and redispatch follows § 13a EnWG and isn't a tariff use case at all; under section 34(1) no. 7 MsbG its data travels via the gateway and a connected control unit13.
Grid: TAF 9 and TAF 10
A distribution system operator rarely had measurements from the low-voltage grid, and TAF 9 and TAF 10 now provide them.
TAF 9 reports what a generation plant is feeding in right now, a PV system for instance. Billing has no use for the value; it's there for grid operation.
Without data like this a grid operator can't see which feeder is running up against its voltage limit right now. TAF 10 delivers it at the grid connection, namely voltage, current, active power, phase angle and frequency4, and one manufacturer calls the gateway with TAF 10 the most important sensor in the grid14.
How often the data comes is for the Metering Point Operation Act, the MsbG, to decide.
Quarter-hourly is standard, by the minute costs extra
Section 34(1) no. 4 MsbG lists among the standard services of the metering point operator the collection of grid status data at quarter-hour precision and its daily transmission to the grid operator. Minute-by-minute transmission, by contrast, sits in section 34(2) sentence 2 no. 6 among the additional services, and it is limited to up to 25 percent of the grid connections the metering point operator has equipped with intelligent metering systems in the grid area concerned13.
For planning and analysis, quarter-hour values that arrive once a day are fine. You can't react to a bottleneck while it builds up with them; that takes the minute values from the additional service. Because the law caps those at a quarter of the equipped connections, every grid operator has to pick the feeders it wants to see minute by minute, and blanket minute-level TAF 10 isn't something the law foresees.
Grid operators need grid status data for § 14a as well, because the Federal Network Agency allows grid-oriented control in principle only on the basis of a grid status assessment, and preventive control based on grid planning only as a transition until the end of 2028 at the latest15. Chapter 5 shows how tightly that ties measurement to control.
Control: why TAF 11 is not the route
"Control of interruptible consumption devices and generation plants" is how the catalogue describes TAF 112, and it would seem obvious to dim a heat pump under § 14a through it, but that isn't how control works.
Back in 2021 the Higher Administrative Court of North Rhine-Westphalia found that TAF 11 was only optional even in the original guideline, missing from the "Basis" profile and implemented by none of the gateways on the market. For remote control, according to the BSI's own assessment, only the CLS proxy channel came into question5.
At the core nothing has changed, except that TAF 11 has vanished altogether: it hasn't been in the guideline since version 1.1 of September 2021, and version 2.0 doesn't name it either8,4. Commands travel over the CLS channel, a secured channel the gateway brokers between an active external market participant in the WAN and a controllable device in the home network16. At the end of it, in the home network, sits a control box that passes the command on to the device or to an energy management system.
The law knows only this route as well: section 34(1) no. 6 MsbG speaks of data communication "via the smart meter gateway and a control unit connected to it"13, and a tariff use case doesn't appear in the provision at all.
A specification for § 14a control doesn't need TAF 11. Specify the CLS channel, the control box and the protocol behind it; the grid data for the decision comes from TAF 9 and TAF 10.
Control in the gateway or in the box: two positions
Since 13 December 2024, version 2.0 of the gateway protection profile, BSI-CC-PP-0073, has included the functional package "Power Limitation" for the case where the gateway controls devices itself16, and the control box would then be redundant. Whether it should be is what the BSI and the BDEW disagree about.
In August 2024 the BSI put out a discussion paper on control directly via the gateway. Integrated control was to be voluntary for manufacturers and the classic route via the control box would stay; with the integrated solution, though, the customer installation would need TR-03109-5 certification, because the box no longer acts as a tested counterpart17.
The BDEW, the German Association of Energy and Water Industries, pushed back in the consultation in September 2024 and reported on it on 4 October. Both routes should share one interface to the customer installation, and metering point operators shouldn't carry a double burden. The TR-03109-5 requirement for the integrated route should go: with it, the association warned, the solution would in effect never be implemented in the market because of the effort ("faktisch nicht umgesetzt"), and dropping it would not impair the security level17. Many metering point operators were building CLS management right then, it added, and that route stays necessary anyway for submetering and existing installations.
The discussion paper has since become an implementation note. On 16 September 2025, the same day as the note on TAF 5 and 16, the BSI published "Steuerung mit Nachweisführung im SMGW", control with verification in the gateway. In it the gateway uses EEBUS to limit consumption and feed-in of controllable devices and logs every instruction along with its acknowledgement. The note is not binding but is meant to move into TR-03109-1 later. On the point in dispute it says only: "Der TLS-Proxy ist im zu steuernden Produkt eine optionale Funktion. Ein Produkt mit implementiertem TLS-Proxy unterliegt dem Anwendungsbereich der [TR-03109-5]." The TLS proxy is optional in the controlled product, and a product that has one falls under TR-03109-5. The note names no certification duty for devices without a TLS proxy18.
In a trial the technology works: in September and October 2025 Bayernwerk and Power Plus Communications sent around 1,100 control commands over EEBUS straight from the gateway to generation, storage and consumption devices, no control box involved, and 99.63 percent went through19. At the time Bayernwerk expected certification at the manufacturers to start in early 2026 and control from the gateway to be widely usable from mid-202619.
Tested does not mean approved
The certification reported on 14 September 2026 covered a CLS adapter from Power Plus Communications, issued by EEBUService GmbH20. That is an interoperability test, not a BSI security certification of the gateway. The BSI product list shows no certificate against version 2.0 of the protection profile, which describes control inside the gateway as the "Power Limitation" function, as of early November 202621. The announced schedule has slipped. What has reached the field so far is a different kind of integration: on 1 July 2026 one competitive metering point operator reported 10,000 installed gateways with the control module housed in the same device, BSI-certified according to the manufacturer, and a second one announced a contract for software to control devices directly from the gateway22. The reports don't say against which version they were certified.
The BSI wants no untested counterpart in the home network, the BDEW wants no second certification route for the same goal, and the implementation note answers the question only for products with a TLS proxy. The dispute isn't settled. As long as no gateway is certified against the new protection profile, metering point operators control through the box, and an architecture planned today should be able to replace it later.
How new functions get into the device
Before a new tariff use case reaches a customer, the guideline has to be extended, the gateway recertified and the firmware in the field updated.
Certification happens twice along the way: a gateway needs a Common Criteria security certificate against protection profile PP-0073 and a second certificate against TR-03109-1 that confirms interoperability; the BSI list carries the two separately21. For the functions relevant to legal metrology, a PTB type-examination certificate is added5. Chapter 3 walks through the procedure.
First came the "Basis" profile with TAF 1, 2, 6 and 7. For TAF 14, an errata to the guideline followed in December 2019, which the court dates to the 12th and the BSI download page to the 16th5,23. In early 2021 TAF 9 and 10 only existed in the optional "Netz" profile5 and became mandatory again with version 1.1 of September 20218; they reached devices through recertification, which Power Plus Communications received for its gateways as early as 30 October 20201.
Any source that says today that TAF 9 and 10 are only arriving now is at least five years old.
In the BSI's staged model6 the first stage includes, among other things, updating the metering system, communication with controllable devices via an active external market participant and the series of register readings (TAF 7), the second time-variable tariffs (TAF 2), grid status data (TAF 10), actual feed-in (TAF 9) and high-frequency readings (TAF 14).
Stage 3 is described but never updated
The staged model is available in version 2.1 from November 20216. A separate part of it already describes the third development stage, covering control, further grid status data, submetering, multi-utility metering and charging infrastructure, among other things. For control it adds a control unit that receives its commands over the CLS proxy channel and can also sit directly inside a gateway24. The BSI hasn't updated the model since, and the roadmap page that belongs to it is marked as an archive25. Development now runs through new versions of the guidelines themselves.
The BSI is announcing new cases all the same: its implementation note of 16 September 2025 describes a planned extension with event-based tariffing in TAF 5 and event-based registration in a new TAF 1610, expressly as a note with "keinen verpflichtenden Charakter", no binding character10.
For existing devices a transition rule applies: gateways under protection profile 1.3 and guideline 1.1 may still be installed until the end of 2027, while certifications under the new versions must show additional mandatory requirements from 1 January 20277, TAF 8 and TAF 15 among them4.
What runs in the field, and what nobody measures
That the gateways support TAF 1, 2, 6, 7, 9, 10 and 14 is more than a market claim1,2: these seven cases have been normative since version 1.18, and all five gateways on the BSI list hold a conformity certificate against that version26. No statistic, however, says whether the functions are switched on in the field.
No figure on adoption
No authority publishes how many installed gateways actually have TAF 9, 10 or 14 switched on. The Federal Network Agency's rollout statistics count metering systems, not functions. For TAF 3, 4, 5, 8, 11, 12 and 13 there is no reliable indication of broad productive use. Version 2.0 of the guideline doesn't even mention six of them any more.
The catalogue describes what an intelligent metering system should be able to do. What it actually does in a particular grid sits in the gateway administrator's configuration, and nobody publishes that.
Four checks help close the gap between catalogue and reality in your own organisation:
Establish the certification status of your gateways
For every device model in use, ask which versions of the protection profile and guideline it was last certified against. The BSI table doesn't show this, but the page for each certificate names the protection profile and the test basis26.
Record the TAF configuration as an inventory
Record which tariff use cases run at which metering points, and since which firmware. Without that list, every statement about grid transparency is a guess, your own included.
Plan minute-level grid status data deliberately
Treat the 25 percent from section 34 MsbG as a budget and spend it where grid calculation expects bottlenecks. Where gateways happen to be installed first is no criterion.
Specify control via CLS
The specification needs the CLS channel and the control box, because TAF 11 isn't in any current version of the guideline.
Open deadlines for this chapter
Live from the deadline calendar, data as of 15 November 2026. When a deadline changes, this list changes with it.
Sources
Primary sources come first. Uncertain statements are marked as uncertain in the text rather than left out.
- Power Plus Communications: PPC receives recertification for smart meter gateways. ppc-ag.de, retrieved 14 October 2026. Manufacturer source.
- inexogy: Tariff use cases of the smart meter gateway, article of 21 January 2022, last modified 5 March 2025 (German). inexogy.com, retrieved 15 October 2026. Company source of a competitive metering point operator, used for the function descriptions.
- Federal Office for Information Security (BSI): BSI TR-03109-1, interoperability requirements for the communication unit of an intelligent metering system, overview page (German). bsi.bund.de, retrieved 14 October 2026.
- BSI: TR-03109-1, version 2.0 of 13 December 2024, sections 1.6 (MUSS+) and 2.3.3 (the administrator's evaluation profiles), tables 3.2 and 3.11 (overview of TAF), sections 3.2.8 (TAF 1), 3.2.11 (TAF 7), 3.2.12 (TAF 8) and 3.2.13 (TAF 15), table 3.43 (measurands) and annex E (changes MWV7 to MWV9) (German). bsi.bund.de, retrieved 14 October 2026.
- Higher Administrative Court of North Rhine-Westphalia, order of 4 March 2021, case 21 B 1162/20, paragraphs 8, 23, 35, 41, 54, 55 and 58 (German). nrwe.justiz.nrw.de, retrieved 14 October 2026.
- BSI: Staged model for developing the standards for digitalising the energy transition, part 2 state of the art, version 2.1 of 11 November 2021 (German). bsi.bund.de, retrieved 14 October 2026.
- BSI: Transition rules for BSI-CC-PP-0073 and BSI TR-03109-1, download page dated 7 January 2025 (German). bsi.bund.de, retrieved 14 October 2026.
- BSI: TR-03109-1, version 1.1 of 17 September 2021, table 4.1 (use cases TAF 1, 2, 6, 7, 9, 10 and 14) and changelog for chapter 4 ("Optionale TAF entfernt", optional TAF removed) (German). bsi.bund.de, retrieved 14 October 2026.
- Forschungsstelle für Energiewirtschaft: Measuring and controlling via iMSys, does it work?, 22 May 2019 (German). ffe.de, retrieved 14 October 2026. Secondary source.
- BSI: Event-based tariff use cases TAF5 and TAF16, implementation note of 16 September 2025 (German). bsi.bund.de, retrieved 14 October 2026.
- Section 55(1) and (2) Metering Point Operation Act (MsbG), collection of electricity readings. gesetze-im-internet.de, retrieved 14 October 2026.
- German Bundestag: printed paper 18/7555 of 17 February 2016, draft act on the digitalisation of the energy transition, article 1, section 55(1) no. 2 of the Metering Point Operation Act; the economics committee's recommendation, printed paper 18/8919 of 22 June 2016, leaves section 55 unchanged (German). dserver.bundestag.de, retrieved 15 October 2026.
- Section 34 Metering Point Operation Act (MsbG), standard and additional services of the metering point operator, paragraph 1 nos. 4 to 7 and paragraph 2 sentence 2 no. 6 (German). gesetze-im-internet.de, retrieved 14 October 2026.
- Power Plus Communications: TAF 10, how the smart meter gateway becomes the most important sensor in the grid. ppc-ag.de, retrieved 14 October 2026. Manufacturer source.
- Federal Network Agency, Ruling Chamber 6: Annex 1 to ruling BK6-22-300 of 27 November 2023, clauses 2.6, 4.2 and 10.5 (German). bundesnetzagentur.de, retrieved 14 October 2026.
- BSI: Certification report for protection profile BSI-CC-PP-0073-V2-2024, Smart Meter Gateway, version 2.0 of 13 December 2024, chapter B.1, functional package Power Limitation. commoncriteriaportal.org, retrieved 14 October 2026.
- BDEW: Integrated control function in the SMGW, article of 4 October 2024 on the association's submission to the BSI consultation, referring to the BSI discussion paper "Steuerung mit Nachweisführung im Smart-Meter-Gateway" of August 2024 (German). bdew.de, retrieved 14 October 2026.
- BSI: Implementation note on TR-03109-1, control with verification in the SMGW ("Steuerung mit Nachweisführung im SMGW"), status 16 September 2025, sections 1, 2.1.1 and 2.1.5 (German). bsi.bund.de, retrieved 14 October 2026.
- Bayernwerk AG: Control without a box: Bayernwerk successfully tests direct control from the smart meter gateway, press release of 17 December 2025 (German). bayernwerk-ag.mynewsdesk.com, retrieved 15 October 2026. Company statement.
- Power Plus Communications: PPC is the first provider to complete EEBUS certification, article of 14 September 2026 (German). ppc-ag.de, retrieved 15 October 2026. Manufacturer source.
- BSI: Certified products under section 24 MsbG, smart meter gateway (German). bsi.bund.de, retrieved 3 November 2026.
- Zeitung für kommunale Wirtschaft: digitalisation ticker, two items of 1 July 2026 on gateways with an integrated CLS module and on control directly from the gateway (German). zfk.de, retrieved 14 October 2026. Trade press, company statements.
- BSI: TR-03109-1, errata on TAF 14, download page dated 16 December 2019 (German). bsi.bund.de, retrieved 14 October 2026.
- BSI: Staged model for developing the standards for digitalising the energy transition, part 3 framework for developing the BSI specifications, version 2.1 of 11 November 2021, sections 2.3 and 3.3 and chapter 5 (German). bsi.bund.de, retrieved 15 October 2026.
- BSI: Roadmap process, marked as archive, content last updated 20 May 2022 (German). bsi.bund.de, retrieved 14 October 2026.
- BSI: Certificate page BSI-K-TR-0856-2026, Secure Smart Grid Hub (SGH-S) V2.00, test basis field: BSI TR-03109-1, version 1.1; all 19 TR certificates on the list name the same test basis, the latest per manufacturer being BSI-K-TR-0822-2025, BSI-K-TR-0795-2025, BSI-K-TR-0677-2024 and BSI-K-TR-0639-2025 (German). bsi.bund.de, retrieved 3 November 2026.