Metering test lab of a regional utility: three meters, each paired with a smart meter gateway, on a test board while a technician works on her laptop in front of it

Chapter 4 · Part III: Functions and control

Tariff use cases: TAF 1 to 16 and version 2.0

Every tariff use case of the smart meter gateway: what TAF 1 to 16 do, what versions 1.1 and 2.0 changed, and why §14a control doesn't need TAF 11.

Status: 18 min readDigitalising the Energy Transition
Download PDF
Summary

A tariff use case, TAF for short after the German Tarifanwendungsfall, is a function the gateway administrator switches on in the smart meter gateway; it decides what gets measured, how often the gateway stores it and who receives the readings. For a long time the catalogue ran from TAF 1 to 14. Version 1.1 of the guideline left seven of them in 2021. Version 2.0, from December 2024, rebuilt it once more and requires TAF 1, 2, 7, 9, 10 and 14, from 2027 also a redefined TAF 8 and a new TAF 15, while the prepaid case, control and four other use cases are missing from it. A BSI note from September 2025 describes an event-based TAF 5 and a TAF 16 on top.

Nobody needs TAF 11 to dim a heat pump under §14a EnWG. Today that runs over the CLS channel; the BSI has described the route directly from the gateway, but no device is certified for it yet. Quarter-hourly grid status data is part of the metering point operator's standard service, while minute-level data costs extra and covers a quarter of the equipped connections at most.

Which function is actually switched on in how many gateways? No authority knows.

What a tariff use case is

"Gateway with TAF 1, 2, 6, 7, 9, 10 and 14." That is roughly how manufacturers describe their devices1, and the line says nothing about what the device measures. It doesn't need to. The numbers say it, at least to anyone who knows the guideline.

Tariff use case (TAF) is a configurable function in the smart meter gateway that sets the interval at which readings are captured and stored, and which authorised parties receive them. The TAF are described in the BSI technical guideline TR-03109-12, and the gateway administrator configures them.

The term is older than the rollout. The first version of the guideline, dated 18 March 2013, already had the list, TAF 1 to 10 mandatory and TAF 11 to 14 optional3; the idea was one device that does it all.

On 16 January 2019 the BSI added an Annex VII. Its device profile "Basis" kept only TAF 1, 2, 6 and 7 mandatory and made everything else optional3. The mandatory rollout started on exactly this profile in 2020, and a year later the Higher Administrative Court of North Rhine-Westphalia held the very same profile to be unlawful3 (chapter 1 tells the story).

The practical consequence is awkward. A TAF is a certified software function. It reaches the field through a firmware update, the hardware alone tells you little, and what a given gateway can do today depends on the version of the guideline it was last certified against.

Technical standard

Newer terms, old list

Since 2020 the BSI has ordered the functions in its staged model by energy-sector use cases, system use cases and function blocks4. Manufacturer sources still count TAF 1 to 141, and since the market uses that count, so does this chapter.

Every tariff use case at a glance

The table shows the catalogue the way manufacturer sources list it, and next to it what version 2.0 of 13 December 2024 has made of it5. Behind "mandatory from 2027" sits the level MUSS+. Gateways certified against the new version from 1 January 2027 must support the function6; whether it then runs in the field is another matter, and the last section deals with it.

TAFWhat the gateway doesPurposeIn version 2.0
1meter readings without a time series, in version 2.0 monthly plus at start and end, data-minimisingBillingmandatory
2tariff levels in fixed time windows, such as peak and off-peakBillingmandatory
3tariff switch once a load threshold is exceededBillingno longer included
4tariff levels by cumulative consumptionBillingno longer included
5tariff levels linked to eventsBillingnot included, BSI note 2025
6readings on demand, for example when a customer movesSwitching processesas a general retrieval function
7meter readings every 15 or 60 minutes, the series of register readingsBilling, settlementmandatory
8power peaks; in version 2.0 newly defined as "load profile formation with maximum values"Billingredefined, mandatory from 2027
9current feed-in of a generation plantGrid operationmandatory
10grid status data such as voltage, current and frequencyGrid operationmandatory
11control of interruptible consumption and generation devicesControlno longer included
12prepaid energy amount with a signal at a thresholdPrepaid billingno longer included
13readings for display over the WAN instead of the home networkCustomer informationno longer included
14high-frequency readings for value-added servicesEnergy monitoringmandatory
15processing of readings from registering metersBillingnew, mandatory from 2027
16capture when an event occurs instead of a fixed intervalBillingnot included, BSI note 2025

The descriptions draw on both versions of the guideline and on manufacturer sources571. Older overviews assign some numbers differently; in 2019 the FfE, for instance, filed TAF 9 under controllable devices8.

And what the guideline doesn't describe itself? Version 2.0 leaves a door open for that: a gateway may implement further tariff use cases if supplementary BSI documents describe them5. The note on TAF 5 and 16 is just such a document.

Conflicting sources

TAF 15 exists, but only since December 2024

The older versions of the guideline have no TAF 15; their catalogue ends at 1437. Version 2.0 of 13 December 2024 does define it: "TAF15: Verarbeitung von Messwerten aus registrierenden Messeinrichtungen", the processing of readings from registering meters, at level MUSS+5. The BSI note on TAF 5 and 16 from September 2025 also lists it next to TAF 1, 2, 7 and 89. The gateway takes over values that a registering meter forms itself instead of registering them on its own. So "there is no TAF 15" describes the state before version 2.0.

Billing: the workhorses and the prepaid case

Four functions carry billing, and they are the same four that became mandatory in the "Basis" profile in 2019.

TAF 1 is the leanest case. The gateway sends only single meter readings, in version 2.0 once a month plus at the start and end of the term, for electricity as well as gas, water and heat5; nothing more leaves it. That's how the gateway was once meant to work for households. Since the GNDEW, though, metering points with a smart metering system and up to 100,000 kWh a year are metered by a series of register readings or, where available, by quarter-hourly registering load profile metering10. In the gateway that is usually TAF 7 (chapters 6 and 7).

TAF 2 adds fixed time windows, peak rate by day and off-peak at night: basically the old two-rate meter gone digital. A dynamic electricity tariff needs more, because its price follows the exchange and the exchange doesn't care what time it is.

TAF 6 fetches readings on request, typically when a customer moves or switches supplier.

The real workhorse is TAF 7. It delivers meter readings for consumption and generation every quarter hour (the guideline also allows 60 minutes), and it does so every day. Quarter-hour settlement hangs on it, and dynamic tariffs under §41a EnWG are usually billed on this same series of register readings. For the time-variable grid charge under module 3, though, TAF 7 is only one of two routes; the other runs through TAF 2, and chapter 5 explains why. An intelligent metering system without TAF 7? An expensive digital meter.

TAF 3, 4 and 8 built tariffs on load thresholds, consumption volumes and power peaks. They have been missing from the guideline since version 1.1 of 20217, and version 2.0 reassigns number 8, to load profile formation with maximum values, required from 20275.

That leaves TAF 12, the prepaid tariff: a prepaid energy amount counts down, and at a threshold a signal goes out1. It has nothing to do with feed-in management or redispatch. The current feed-in comes from TAF 9, and redispatch isn't a tariff use case at all; it's a process under §13a EnWG that runs through its own channels.

The prepaid case has been gone from the guideline since version 1.1 of 20217. Version 2.0 doesn't bring it back5.

Grid: TAF 9 and TAF 10

Measurements from the low-voltage grid were something a distribution system operator never had. TAF 9 and TAF 10 provide them.

TAF 9 reports what a generation plant is feeding in right now, a PV system for instance. Billing has no use for the value; it's there for grid operation.

Without data like this a grid operator can't see which feeder is running up against its voltage limit right now. TAF 10 delivers it at the grid connection, namely voltage, current, active power, phase angle and frequency5, and one manufacturer calls the gateway with TAF 10 the most important sensor in the grid11.

How often the data comes is for the Metering Point Operation Act, the MsbG, to decide.

Legally binding

Quarter-hourly is standard, by the minute costs extra

Section 34(1) no. 4 MsbG lists among the standard services of the metering point operator the collection of grid status data at quarter-hour precision and its daily transmission to the grid operator. Minute-by-minute transmission, by contrast, sits in section 34(2) sentence 2 no. 6 among the additional services, and it is limited to up to 25 percent of the grid connections the metering point operator has equipped with intelligent metering systems in the grid area concerned12.

For planning and analysis, quarter-hour values that arrive once a day are fine. You can't react to a bottleneck while it builds up with them; that's what minute values are for, and those cost extra and are capped at a quarter of the equipped connections.

So every grid operator has to pick the feeders it wants to see minute by minute. Blanket planning with minute-level TAF 10 simply isn't something the law foresees.

Then there is §14a. The Federal Network Agency allows grid-oriented control in principle only on the basis of a grid status assessment, and preventive control based on grid planning only as a transition until the end of 2028 at the latest13. Chapter 5 shows how tightly that ties measurement to control.

Control: why TAF 11 is not the route

"Control of interruptible consumption devices and generation plants" is how the catalogue describes TAF 111, and it would seem obvious to dim a heat pump under §14a through it. That is exactly what doesn't happen.

Back in 2021 the Higher Administrative Court of North Rhine-Westphalia set out the situation soberly. TAF 11, it said, was only optional even in the original guideline, missing from the "Basis" profile and implemented by none of the gateways on the market. For remote control, according to the BSI's own assessment, only the CLS proxy channel came into question3.

At the core nothing has changed, except that TAF 11 has vanished altogether: it hasn't been in the guideline since version 1.1 of September 2021, and version 2.0 doesn't name it either75. Commands travel over the CLS channel, a secured channel the gateway brokers between an active external market participant in the WAN and a controllable device in the home network14. In the home network a control box sits at the end of it. It passes the command on to the device or to an energy management system.

The law sees it the same way. Section 34(1) no. 6 MsbG speaks of data communication "via the smart meter gateway and a control unit connected to it"12, and a tariff use case doesn't appear in the provision at all.

Where the tariff use cases deliver A meter delivers to the smart meter gateway over the local metrological network. Over the WAN the gateway delivers billing and settlement data under TAF 1, 2 and 7, from 2027 also under TAF 8 and 15, to the metering point operator, which passes them on to the grid operator, the transmission system operator and the supplier under section 60 MsbG, actual feed-in under TAF 9 and grid status data under TAF 10 to the grid operator, high-frequency values under TAF 14 to value-added services. Control under section 14a runs over the CLS channel in the home area network to the control box, not over TAF 11: the command comes from an active external market participant, and the gateway passes it through its TLS proxy. A legend distinguishes solid lines for readings under a TAF from dashed lines for control commands via the CLS channel. Meter on the LMN Smart meter gateway TAF configuration set by the GWA VIA THE WAN IN THE HOME AREA NETWORK (HAN) Billing and settlement Metering point operator, passes on to DSO, TSO and supplier TAF 1, 2, 7 · from 2027 TAF 8, 15 Grid observation Distribution system operator TAF 9 · TAF 10 Value-added services Energy monitoring, analytics TAF 14, high frequency Control box and device Control under §14a EnWG CLS channel, not TAF 11 Command from the aEMT via the TLS proxy Readings under a TAF Control command via the CLS channel

Open figure full size

Figure 1: Where the tariff use cases deliver. Billing and settlement, grid observation and value-added services run over TAF. Billing values go to the metering point operator, which passes them on to the grid operator, the transmission system operator and the supplier under section 60 MsbG. Quarter-hourly grid status data under TAF 10 is standard, minute values are an additional service. Control under §14a runs over the CLS channel to the control box, not over TAF 11. The command comes from an active external market participant.
Key point

A specification for §14a control doesn't need TAF 11. Specify the CLS channel, the control box and the protocol behind it; the grid data for the decision comes from TAF 9 and TAF 10.

Control in the gateway or in the box: two positions

Since 13 December 2024 a door has been open. Version 2.0 of the gateway protection profile, BSI-CC-PP-0073, comes with the functional package "Power Limitation" for the case where the gateway controls devices itself14. The control box would then be redundant. Whether it should be is what the BSI and the BDEW disagree about.

In August 2024 the BSI put out a discussion paper on control directly via the gateway. Integrated control was to be voluntary for manufacturers and the classic route via the control box would stay; with the integrated solution, though, the customer installation would need TR-03109-5 certification, because the box no longer acts as a tested counterpart15.

The BDEW, the German Association of Energy and Water Industries, pushed back in the consultation in September 2024 and reported on it on 4 October. Both routes should share one interface to the customer installation, and metering point operators shouldn't carry a double burden. The TR-03109-5 requirement for the integrated route should go: with it, the association warned, the solution would in effect never be implemented in the market because of the effort ("faktisch nicht umgesetzt"), and dropping it would not impair the security level15. Many metering point operators were building CLS management right then, it added, and that route stays necessary anyway for submetering and existing installations.

The discussion paper has since become an implementation note. On 16 September 2025, the same day as the note on TAF 5 and 16, the BSI published "Steuerung mit Nachweisführung im SMGW", control with verification in the gateway. In it the gateway uses EEBUS to limit consumption and feed-in of controllable devices and logs every instruction along with its acknowledgement. The note is not binding but is meant to move into TR-03109-1 later. On the point in dispute it says only: "Der TLS-Proxy ist im zu steuernden Produkt eine optionale Funktion. Ein Produkt mit implementiertem TLS-Proxy unterliegt dem Anwendungsbereich der [TR-03109-5]." The TLS proxy is optional in the controlled product, and a product that has one falls under TR-03109-5. The note names no certification duty for devices without a TLS proxy16.

A grid operator has shown that the technology works in a trial. In September and October 2025 Bayernwerk and Power Plus Communications sent around 1,100 control commands straight from the gateway to generation, storage and consumption devices, no control box involved, over EEBUS, and 99.63 percent went through17. At the time Bayernwerk expected certification at the manufacturers to start in early 2026 and control from the gateway to be widely usable from mid-202617.

Not firmly established

Tested does not mean approved

The certification reported on 14 September 2026 covered a CLS adapter from Power Plus Communications, issued by EEBUS-Service-GmbH18. That is an interoperability test, not a BSI security certification of the gateway. The BSI product list shows no certificate against version 2.0 of the protection profile, which describes control inside the gateway as the "Power Limitation" function, as of mid-October 202619. The announced schedule has slipped. Integrated control has reached the field anyway. On 1 July 2026 one competitive metering point operator reported 10,000 installed gateways with an integrated CLS module, BSI-certified according to the manufacturer, and a second one announced a contract for software to control devices directly from the gateway20. The reports don't say against which version they were certified.

The BSI wants no untested counterpart in the home network, the BDEW no second certification route for the same goal. The BSI has since described the route inside the gateway technically, but it isn't binding, and as of mid-October 2026 no gateway is certified for it. That doesn't settle the dispute.

A sensible metering point operator therefore plans with the box and builds the architecture so it can be pulled out one day.

How new functions get into the device

Before a new tariff use case reaches a customer, the guideline has to be extended, the gateway recertified and the firmware in the field updated. Each of these steps takes time.

Testing happens twice along the way. A gateway needs a Common Criteria security certificate against protection profile PP-0073 and a second certificate against TR-03109-1 that confirms interoperability; the BSI list carries the two separately19. For the functions relevant to legal metrology, a PTB type-examination certificate is added3. Chapter 3 walks through the procedure.

First came the "Basis" profile with TAF 1, 2, 6 and 7. For TAF 14, an errata to the guideline followed in December 2019, which the court dates to the 12th and the BSI download page to the 16th321. In early 2021 TAF 9 and 10 only existed in the optional "Netz" profile3 and became mandatory only with version 1.1 of September 20217; they reached devices through recertification, at Power Plus Communications as early as 30 October 202022.

Read somewhere today that TAF 9 and 10 are only arriving now? Then the source is at least five years old.

In the BSI's staged model4 the first stage includes, among other things, updating the metering system, communication with controllable devices via an active external market participant and the series of register readings (TAF 7), the second time-variable tariffs (TAF 2), grid status data (TAF 10), actual feed-in (TAF 9) and high-frequency readings (TAF 14).

Not firmly established

A stage 3 is announced but not described

The staged model is available in version 2.1 from November 2021 and names a third development stage as the goal4. No updated staged model has been published, and the BSI roadmap page that belongs to it is marked as an archive23. Development now runs through new versions of the guidelines themselves.

New cases are on their way all the same. The BSI's implementation note of 16 September 2025 describes a planned extension with event-based tariffing in TAF 5 and event-based registration in a new TAF 169, expressly as a note with "keinen verpflichtenden Charakter", no binding character9.

And the old state? Gateways under protection profile 1.3 and guideline 1.1 may still be installed until the end of 2027, while certifications under the new versions must show additional mandatory requirements from 1 January 20276, TAF 8 and TAF 15 among them5.

What runs in the field, and what nobody measures

That the gateways support TAF 1, 2, 6, 7, 9, 10 and 14 is more than a manufacturer claim221. Exactly these seven cases have been normative since version 1.17, and all five gateways on the BSI list hold a conformity certificate against that version24. Whether the functions are switched on in the field is another question, and no statistic answers it.

Negative finding

No figure on adoption

No authority publishes how many installed gateways actually have TAF 9, 10 or 14 switched on. The Federal Network Agency's rollout statistics count metering systems, not functions. For TAF 3, 4, 5, 8, 11, 12 and 13 there is no reliable indication of broad productive use. Version 2.0 of the guideline doesn't even mention six of them any more.

Between catalogue and reality, then, a gap remains. The catalogue describes what an intelligent metering system should be able to do; what it actually does in a particular grid sits in the gateway administrator's configuration, and nobody else sees that.

Four checks help close the gap in your own organisation:

  1. Establish the certification status of your gateways

    For every device model in use, ask which versions of the protection profile and guideline it was last certified against. The BSI table doesn't show this, but the page for each certificate names the protection profile and the test basis24.

  2. Record the TAF configuration as an inventory

    Which tariff use cases run at which metering points, and since which firmware? Without that list, every statement about grid transparency is a guess, your own included.

  3. Plan minute-level grid status data deliberately

    Treat the 25 percent from section 34 MsbG as a budget and spend it where grid calculation expects bottlenecks. Where gateways happen to be installed first is no criterion.

  4. Specify control via CLS

    No TAF 11 in the specification.

See it in the model

The interactive model shows where in the metering chain this chapter sits.

The model: from the meter to the billing system

Open deadlines for this chapter

Live from the deadline calendar, data as of 14 October 2026. When a deadline changes, this list changes with it.

All deadlines in the deadline calendar →

Sources

Primary sources first. Uncertain statements are marked as uncertain in the text rather than left out.

  1. inexogy: Tariff use cases of the smart meter gateway (German). inexogy.com, retrieved 14 October 2026. Manufacturer source, used for the function descriptions.
  2. Federal Office for Information Security (BSI): BSI TR-03109-1, interoperability requirements for the communication unit of an intelligent metering system, overview page (German). bsi.bund.de, retrieved 14 October 2026.
  3. Higher Administrative Court of North Rhine-Westphalia, order of 4 March 2021, case 21 B 1162/20, paragraphs 8, 23, 35, 54, 55 and 58 (German). nrwe.justiz.nrw.de, retrieved 14 October 2026.
  4. BSI: Staged model for developing the standards for digitalising the energy transition, part 2 state of the art, version 2.1 of 11 November 2021 (German). bsi.bund.de, retrieved 14 October 2026.
  5. BSI: TR-03109-1, version 2.0 of 13 December 2024, section 1.6 (MUSS+), tables 3.2 and 3.11 (overview of TAF), sections 3.2.8 (TAF 1), 3.2.11 (TAF 7), 3.2.12 (TAF 8) and 3.2.13 (TAF 15), table 3.43 (measurands) and annex E (changes MWV7 to MWV9) (German). bsi.bund.de, retrieved 14 October 2026.
  6. BSI: Transition rules for BSI-CC-PP-0073 and BSI TR-03109-1 (German). bsi.bund.de, retrieved 14 October 2026.
  7. BSI: TR-03109-1, version 1.1 of 17 September 2021, table 4.1 (use cases TAF 1, 2, 6, 7, 9, 10 and 14) and changelog for chapter 4 ("Optionale TAF entfernt", optional TAF removed) (German). bsi.bund.de, retrieved 14 October 2026.
  8. Forschungsstelle für Energiewirtschaft: Measuring and controlling via iMSys, does it work?, 22 May 2019 (German). ffe.de, retrieved 14 October 2026. Secondary source.
  9. BSI: Event-based tariff use cases TAF5 and TAF16, implementation note of 16 September 2025 (German). bsi.bund.de, retrieved 14 October 2026.
  10. Section 55(1) and (2) Metering Point Operation Act (MsbG), collection of electricity readings. gesetze-im-internet.de, retrieved 14 October 2026.
  11. Power Plus Communications: TAF 10, how the smart meter gateway becomes the most important sensor in the grid. ppc-ag.de, retrieved 14 October 2026. Manufacturer source.
  12. Section 34 Metering Point Operation Act (MsbG), standard and additional services of the metering point operator, paragraph 1 nos. 4 to 6 and paragraph 2 sentence 2 no. 6 (German). gesetze-im-internet.de, retrieved 14 October 2026.
  13. Federal Network Agency, Ruling Chamber 6: Annex 1 to ruling BK6-22-300 of 27 November 2023, clauses 2.6, 4.2 and 10.5 (German). bundesnetzagentur.de, retrieved 14 October 2026.
  14. BSI: Certification report for protection profile BSI-CC-PP-0073-V2-2024, Smart Meter Gateway, version 2.0 of 13 December 2024, chapter B.1, functional package Power Limitation. commoncriteriaportal.org, retrieved 14 October 2026.
  15. BDEW: Integrated control function in the SMGW, article of 4 October 2024 on the association's submission to the BSI consultation, referring to the BSI discussion paper "Steuerung mit Nachweisführung im Smart-Meter-Gateway" of August 2024 (German). bdew.de, retrieved 14 October 2026.
  16. BSI: Implementation note on TR-03109-1, control with verification in the SMGW ("Steuerung mit Nachweisführung im SMGW"), status 16 September 2025, sections 1, 2.1.1 and 2.1.5 (German). bsi.bund.de, retrieved 14 October 2026.
  17. pv magazine: Control of flexibilities directly from the smart meter gateway without a control box successfully tested, 17 December 2025 (German). pv-magazine.de, retrieved 14 October 2026. Trade press.
  18. Zeitung für kommunale Wirtschaft: digitalisation ticker, item on the EEBUS certification of 14 September 2026 (German). zfk.de, retrieved 14 October 2026. Trade press.
  19. BSI: Certified products under section 24 MsbG, smart meter gateway (German). bsi.bund.de, retrieved 14 October 2026.
  20. Zeitung für kommunale Wirtschaft: digitalisation ticker, two items of 1 July 2026 on gateways with an integrated CLS module and on control directly from the gateway (German). zfk.de, retrieved 14 October 2026. Trade press, company statements.
  21. BSI: TR-03109-1, errata on TAF 14, download page dated 16 December 2019 (German). bsi.bund.de, retrieved 14 October 2026.
  22. Power Plus Communications: PPC receives recertification for smart meter gateways. ppc-ag.de, retrieved 14 October 2026. Manufacturer source.
  23. BSI: Roadmap process, marked as archive, content last updated 20 May 2022 (German). bsi.bund.de, retrieved 14 October 2026.
  24. BSI: Certificate page BSI-K-TR-0856-2026, Secure Smart Grid Hub (SGH-S) V2.00, test basis field: BSI TR-03109-1, version 1.1; all 19 TR certificates on the list name the same test basis, the latest per manufacturer being BSI-K-TR-0822-2025, BSI-K-TR-0795-2025, BSI-K-TR-0677-2024 and BSI-K-TR-0639-2025 (German). bsi.bund.de, retrieved 14 October 2026.

Further reading on innobu.com

Related tools

Contents of the handbook

  1. 1The legal framework: from the GDEW to today's MsbG
  2. 2Devices and architecture: what an intelligent metering system is
  3. 3BSI standards, certification and the smart metering PKI
  4. 4Tariff use cases: TAF 1 to 16 and version 2.0
  5. 5Grid-oriented control under §14a EnWG
  6. 6Dynamic tariffs and grid charges in transition
  7. 7Market communication: how meter readings become processes
  8. 8Rollout practice: figures, supervision and what nobody measures
  9. +The model: from the meter to the billing system
  10. +Reading paths through ten topic fields
  11. +Open questions and negative findings

Questions about implementing this in your organisation?

Arrange a conversation