Deadline calendar
New and changed in the deadline calendar
Every change to the deadline calendar since September 2026, newest first: deadlines added, dates moved, status changes, corrected obligation texts and legal consequences. Each line leads to the deadline in the calendar, which shows its source and the date of the information.
- In the last 30 days: 142 deadlines added, 1 date moved and 33 other deadlines changed.
Subscribe to changes
The feeds report every change, including the obligation text, status and legal consequence, which a calendar subscription does not show. Feed readers and intranet pages can pull them without signing up.
All deadlines (Atom) · All deadlines (JSON Feed)
One market role only: Power grid · Gas grid · TSO · Metering · Competitive metering · Supplier · Balancing · Direct marketing · Generation · Storage · Heat network · Charge points · Company-wide
Note: A classification for typical market roles, not a review of your individual case and not legal advice. Whether an obligation applies to your company (thresholds, exemptions) is for your legal department or counsel to confirm. The calendar doesn't replace your own deadline review.
November 2026
- 24 November 2026Obligation text changedFederal subsidy for transmission network costs 2027 to 2029
Before
Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat has until 4 December 2026 for its second reading. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).
- 24 November 2026AddedSignificant security incident: 24 hours, 72 hours, one monthDate: within 24 hours after; within 72 hours after; within 1 month after
- 24 November 2026AddedLow-voltage grid connection: state the time needed within ten working daysDate: within 10 working days after
- 24 November 2026AddedCharging equipment above 12 kVA: network operator responds within two monthsDate: within 2 months after
- 24 November 2026AddedMarket master data register: register a new market roleDate: within 1 month after
- 24 November 2026AddedMarket master data register: register a new plantDate: within 1 month after
- 24 November 2026AddedMarket master data register: record changesDate: within 1 month after
- 24 November 2026AddedSupplier switch within 24 hoursDate: within 24 hours after
- 24 November 2026AddedBuilding Modernisation Act: confirm the biomethane or hydrogen share with the billDate 1 January 2029
- 24 November 2026AddedBuilding Modernisation Act: operators of third-party heating systems ensure 10 percent heat from biomethane or hydrogenDate 1 January 2029
- 24 November 2026AddedDistrict heating with CHP: new calculation method for published primary energy factorsDate 1 January 2027
- 24 November 2026AddedData Act: data access built into the design of new connected productsDate 13 September 2026
- 24 November 2026AddedNotify the Federal Network Agency of supplying household customersDate: without undue delay after
- 24 November 2026AddedNotify the end of supplying household customersDate: at least 3 months before
- 24 November 2026AddedBill and final bill within six weeksDate: within 6 weeks after
- 24 November 2026AddedSet up an energy or environmental management system (EnEfG amendment)Date 11 October 2027
- 24 November 2026AddedWaste heat: report to the Federal Office for Energy Efficiency by 31 MarchDate 31 March 2027
- 24 November 2026AddedData centres: publish annual information and send it to the federal government (31 March)Date 31 March 2027
- 24 November 2026AddedData centres: power usage effectiveness (PUE) of 1.5 or lowerDate 1 July 2027
- 24 November 2026AddedData centres: electricity demand met entirely from renewable sourcesDate 1 January 2027
- 24 November 2026AddedEEG grid connection up to 30 kW: grid compatibility check result within one monthDate: within 1 month after
- 24 November 2026AddedEEG grid connection: grid compatibility check result within eight weeksDate: within 8 weeks after
- 24 November 2026AddedGHG quota: report 2026 charging electricity from public charge points to the Federal Environment AgencyDate 28 February 2027
- 24 November 2026AddedGHG quota: report non-public charging of battery electric cars for 2027 to the Federal Environment AgencyDate 15 November 2027
- 22 November 2026Obligation text changedBSI TR-03109-1 v2.0: gateway certificates only with MUSS+
Before
Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician, plus TAF 8 in its new form and TAF 15. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.
- 22 November 2026AddedMarket master data register: new data annex with ZEREZ ID applies (third MaStRV amendment)Date 1 April 2027
- 22 November 2026AddedPrice change on 1 January 2028: notice deadline in default supplyDate 20 November 2027
- 22 November 2026AddedFederal Network Agency quarterly survey: report supplier switches and disconnections for the fourth quarter of 2026Date 15 February 2027
- 22 November 2026Obligation text changedRedispatch without balancing: consultation on cost reimbursement closes
Before
Ruling Chamber 8 is consulting on how DSOs pay plant operators compensation when redispatch measures are not balanced: under the draft, per MWh of curtailed energy, a blended price of 72.5 percent ID-AEP and 27.5 percent reBAP plus a flat EUR 1.35/MWh, with a negative blended price triggering a payment by the plant operator. Comments are due by 21 October 2026, with the final ruling targeted by year end.
- 22 November 2026AddedRedispatch without balancing: compensation and cost pass-through under BK8-26-001-ADate 1 January 2027
- 22 November 2026AddedOffshore wind: consultation on the dynamic bidding procedure rules from 2027 closes (BK6-26-477)Date 4 December 2026
- 15 November 2026AddedHydrogen core network: publish the network charge for the following yearDate 1 November 2027
- 15 November 2026Status changedVDE-AR-N 4105:2026-03: end of the transition perioddate open → fixed
- 15 November 2026Obligation text changedVDE-AR-N 4105:2026-03: end of the transition period
Before
The 2026-03 edition replaces the 2018-11 edition. The end of the transition period on 1 March 2027 does not come from the standards body; according to VDE FNN, certificates under the 2018-11 edition remain sufficient until one of two periods expires: 12 months after DIN VDE V 0124-100 takes effect or 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.
- 15 November 2026AddedE-invoicing: paper and other formats from 2027 only up to EUR 800,000 prior-year turnover or via EDIDate 1 January 2027
- 15 November 2026Obligation text changedFederal subsidy for transmission network costs 2027 to 2029
Before
Under the government bill, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d draft EnWG) that lowers transmission network charges; the Bundesrat calls for EUR 6.5 billion, so the amount is open. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) draft EnWG).
- 15 November 2026Obligation text changedElectricity and energy tax: estimate of 2027 annual tax by 15 January
Before
Suppliers with annual returns and advance payments send the main customs office, by 15 January, a sound and traceable estimate of the expected annual tax; below 2,400 euros no notice is needed. On 30 June they estimate again and report by 15 August if the new estimate exceeds 100,000 euros and exceeds the set advance payments by more than 20 per cent (Section 8(6) StromStG, Section 39(5) EnergieStG).
- 15 November 2026Obligation text changedMiSpeL: ruling on market integration of storage and charging points
Before
The Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges.
- 15 November 2026Obligation text changedGeLi Gas 2.0 applies
Before
New supplier switch processes for gas, UTILMD Gas 1.1.
- 15 November 2026AddedGas and hydrogen disclosure on the bill: residual energy mix of the previous year (draft Section 42d EnWG)Date 1 July 2027
- 15 November 2026AddedGas reserve (government draft): levy on balancing group managers from 1 October 2027Date 1 October 2027
- 15 November 2026AddedRegional scenario of the planning region for the 2028 network expansion planDate 31 December 2027
- 15 November 2026Obligation text changedCongestion income 2027: report the planned use to the Federal Network Agency
Before
Transmission system operators tell the Federal Network Agency by 31 October how they plan to use the 2027 congestion income from allocating cross-zonal capacity. The basis is Article 4 of the ACER methodology on the use of congestion income under Article 19 of Regulation (EU) 2019/943.
- 15 November 2026AddedBill: show the price component for the mandatory biogenic share under Section 43 GModG (Section 3(1) no. 6 CO2KostAufG)Date 1 January 2029
- 15 November 2026AddedElectricity cost review from 2029: submit documents for the starting level (draft determination BK8-26-04#7 to #12)Date 1 July 2027
- 15 November 2026Obligation text changedElectricity efficiency benchmarking: data collection consultation closes
Before
Ruling Chamber 8 is consulting on which data electricity DSOs must supply for the efficiency benchmarking of the fifth regulatory period. Comments are due by 26 October 2026; the data collection follows afterwards.
- 15 November 2026Legal consequence changedAgNes: dynamic network charge for battery storage at levels 1 to 5Regulator can enforce → Fine possible
- 15 November 2026Legal consequence changedAgNes: dynamic network charge for generation plants at levels 1 to 5Regulator can enforce → Fine possible
- 11 November 2026Date movedGas WACC: the rate of return decision is issued31 December 2026 → 30 September 2027
- 11 November 2026Obligation text changedGas WACC: the rate of return decision is issued
Before
The Bundesnetzagentur intends to set the flat-rate return on capital for gas grid operators by the end of 2026. Gas distribution operators then calculate the revenue caps of the fifth regulatory period from 2028 with the adopted rate.
- 11 November 2026AddedElectricity cost review from 2029: consultation on data collection for the starting level closesDate 7 December 2026
- 11 November 2026AddedSettlement of energy exchange between TSOs: consultation closes (BK6-26-401, BK6-26-402)Date 23 November 2026
- 4 November 2026AddedKONNI 2.1: second consultation on a conversion fee from L-gas to H-gas closesDate 23 November 2026
- 1 November 2026Obligation text changedWasABi: balancing rules for hydrogen apply, data platform from July 2027
Before
The hydrogen market area manager and the hydrogen network operators apply the WasABi balancing rules from 1 January 2028 (BK7-24-01-014, operative point 10). They set up the data exchange platform by 1 July 2027 and test it with market participants until 1 January 2028 (operative point 7(d)).
- 1 November 2026Legal consequence changedAvoided network charges: 75 per cent cut from 2028Regulator can enforce → Fine possible
- 1 November 2026Legal consequence changedVDE-AR-N 4105:2026-03: end of the transition periodCivil-law consequence → Fine possible
- 1 November 2026Legal consequence changedVDE-AR-N 4100:2026-04: end of the transition periodRegulator can enforce → Fine possible
- 1 November 2026Legal consequence changedGrid package: system-serving connection capacity instead of maximum outputRegulator can enforce → Fine possible
- 1 November 2026AddedGrid expansion plan under section 14d EnWG: filing due 31 October 2028Date 31 October 2028
- 1 November 2026Legal consequence changedNEST: fifth regulatory period, gasRegulator can enforce → Fine possible
- 1 November 2026AddedDefault metering point operators: publish services and price sheets by 31 October 2027Date 31 October 2027
- 1 November 2026AddedRules for secure data exchange in the scheduling process v2.4 become bindingDate 1 October 2027
- 1 November 2026Legal consequence changedEU ETS 2 starts: emissions trading for buildings and transport replaces the national BEHGFine possible → Money is lost
- 1 November 2026Obligation text changedSmall electricity DSOs: notify charging points and stop operating them
Before
Electricity distribution system operators whose vertically integrated undertaking has fewer than 100,000 customers must notify the Federal Network Agency in text form of their activities relating to charging points they already developed, managed or operated before 27 July 2021, and cease them by the end of 31 December 2026, unless the agency has granted approval under Section 7c(2) EnWG beforehand (Section 118(34) sentences 1 to 4 EnWG).
- 1 November 2026AddedCongestion income 2028: report the planned use to the Federal Network AgencyDate 31 October 2027
- 1 November 2026Added2028 levies: publication by the transmission system operatorsDate 25 October 2027
- 1 November 2026Legal consequence changedSurcharge for special grid use: show contributions separatelyRegulator can enforce → Fine possible
- 1 November 2026Legal consequence changedAgNes: TSOs adjust network charges by 1 OctoberRegulator can enforce → Fine possible
- 1 November 2026Legal consequence changedAgNes: network operators identify prosumers and notify suppliersRegulator can enforce → Fine possible
- 1 November 2026Legal consequence changedAgNes: explain a late adjustment of network charges for 1 JanuaryRegulator can enforce → Fine possible
- 1 November 2026Legal consequence changedAgNes: submit network charge review data and charge report by 1 JanuaryRegulator can enforce → Fine possible
- 1 November 2026Legal consequence changedAgNes: final consumption data to the upstream network operatorRegulator can enforce → Fine possible
- 1 November 2026Legal consequence changedAgNes: final consumption data to the Federal Network AgencyRegulator can enforce → Fine possible
- 1 November 2026Legal consequence changedAgNes: publish the uniform national feed-in chargeRegulator can enforce → Fine possible
- 1 November 2026Legal consequence changedAgNes: DSOs report feed-in data to the TSORegulator can enforce → Fine possible
- 1 November 2026Legal consequence changedAgNes: publish the final settlement of the surcharge for special grid useRegulator can enforce → Fine possible
- 1 November 2026Legal consequence changed§ 14a EnWG: end of the transition periodRegulator can enforce → Fine possible
October 2026
- 28 October 2026AddedWaKandA: hydrogen network operators' joint annual report to Ruling Chamber 7Date 1 April 2029
- 28 October 2026AddedEU ETS 2: report on passing allowance costs on to consumers (Section 43(3) TEHG)Date 30 April 2028
- 28 October 2026AddedControllability check: network operators' tests and reports by 30 September via the TSOs' portalsDate 30 September 2027
- 28 October 2026AddedRenewables grid cost pass-through: notify the regulator of the 2028 amountDate 1 October 2027
- 28 October 2026AddedFederal Network Agency quarterly survey: report supplier switches and disconnections (15 February, May, August, November)Date 15 November 2026
- 28 October 2026AddedAgNes: submit network charge review data and charge report by 1 JanuaryDate 1 January 2029
- 27 October 2026AddedHeat networks: notify complex measure by end of 2026, otherwise 30 percent from 2030Date 31 December 2026
- 27 October 2026AddedHeat networks: at least 30 percent renewable heat or waste heat from 2030Date 1 January 2030
- 27 October 2026AddedHydrogen core network: submit planned costs by 31 May, actual costs by 30 JuneDate 31 May 2027
- 27 October 2026AddedHydrogen core network: publish the network charge for the following yearDate 1 November 2026
- 27 October 2026AddedWasABi: set up the hydrogen data exchange platformDate 1 July 2027
- 27 October 2026Obligation text changedWasABi: set up the hydrogen data exchange platform
Before
For hydrogen balancing under WasABi, the data exchange platform must be set up by 1 July 2027 and tested with market participants in an introduction phase until 1 January 2028; the IT interface specifications are announced to market participants beforehand (BK7-24-01-0014, operative point 7(d)).
- 27 October 2026AddedWasABi: balancing rules for hydrogen apply, data platform from July 2027Date 1 January 2028
- 27 October 2026Obligation text changedWasABi: balancing rules for hydrogen apply, data platform from July 2027
Before
The hydrogen market area manager and the hydrogen network operators apply the WasABi balancing rules from 1 January 2028 (BK7-24-01-0014, operative point 10). They set up the data exchange platform by 1 July 2027 and test it with market participants until 1 January 2028 (operative point 7(d)).
- 27 October 2026Obligation text changedGas WACC: end of the consultation on the rate of return
Before
Gas distribution grid operators can comment on the draft decision on the flat-rate return on capital. The draft proposes a 3.76 percent rate for the revenue caps from 2028; it only becomes binding with the final decision.
- 27 October 2026AddedAvoided network charges: 75 per cent cut from 2028Date 1 January 2028
- 27 October 2026Legal consequence changedPublish 2026 network lossesRegulator can enforce → Fine possible
- 27 October 2026Legal consequence changedVDE-AR-N 4105: deadline for power limitation evidenceCivil-law consequence → Money is lost
- 27 October 2026Obligation text changedVDE-AR-N 4105:2026-03: end of the transition period
Before
The 2026-03 edition replaces the 2018-11 edition. The end of the transition period on 1 March 2027 does not come from the standards body; according to VDE FNN, certificates under the 2018-11 edition remain sufficient for up to 24 months after the rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.
- 27 October 2026Obligation text changedFederal subsidy for transmission network costs 2027 to 2029
Before
Under the government bill, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 that lowers transmission network charges. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG draft).
- 27 October 2026Legal consequence changedRevenue cap 2028: TSO report on the adjustment and provisional network chargesRegulator can enforce → Fine possible
- 27 October 2026AddedEU ETS 2: report 2026 fuel emissions (gas suppliers)Date 30 April 2027
- 27 October 2026AddedEU ETS 2: first surrender of allowances for 2028 emissionsDate 31 May 2029
- 27 October 2026Obligation text changedEU ETS 2: first surrender of allowances for 2028 emissions
Before
Regulated entities under the EU ETS 2, for example suppliers placing natural gas or heating oil on the market for buildings and transport, surrender allowances for 2028 emissions for the first time by 31 May 2029, then each year by 31 May for the previous year (Article 30e(2) and Article 30k of the ETS Directive, transposed in Section 7(2) TEHG).
- 27 October 2026AddedEU emissions trading: 2026 emissions report for power and heating plantsDate 31 March 2027
- 27 October 2026Obligation text changedEU emissions trading: 2026 emissions report for power and heating plants
Before
Operators of installations in EU emissions trading, such as combined heat and power and heating plants above 20 MW rated thermal input, determine their emissions under the approved monitoring plan and report them to the German Emissions Trading Authority by the end of 31 March of the following year (Section 21(1) TEHG).
- 27 October 2026AddedEU emissions trading: surrender allowances for 2026Date 30 September 2027
- 27 October 2026AddedSubmit the draft scenario framework for electricity and for gas and hydrogenDate 30 June 2028
- 27 October 2026AddedCapacity market: TSO platform for prequalification by 1 May 2027Date 1 May 2027
- 27 October 2026Title changedCapacity market: TSO platform for prequalification by 1 May 2027
Before
Capacity market: TSO platform for prequalification from 1 May 2027
- 27 October 2026AddedCapacity market: apply to complete provisional prequalification by 31 October 2031Date 31 October 2031
- 27 October 2026AddedElectricity and energy tax: choose monthly or annual filing for 2027Date 31 December 2026
- 27 October 2026Obligation text changedElectricity and energy tax: choose monthly or annual filing for 2027
Before
Suppliers liable for electricity or energy tax choose between monthly and annual filing. The declaration for 2027 must reach the main customs office by 31 December 2026 (Section 8(2) StromStG); for energy tax it must be there before the start of the calendar year (Section 39(2) EnergieStG).
- 27 October 2026AddedElectricity and energy tax: estimate of 2027 annual tax by 15 JanuaryDate 15 January 2027
- 27 October 2026Obligation text changedElectricity and energy tax: estimate of 2027 annual tax by 15 January
Before
Suppliers filing annually with advance payments send the main customs office by 15 January a traceable estimate of the expected annual tax, make a further estimate as of 30 June and report it by 15 August if it exceeds EUR 100,000 and deviates by more than 20 percent from the assessment (Section 8(6) StromStG, Section 39(5) EnergieStG).
- 27 October 2026Legal consequence changedElectricity and energy tax: estimate of 2027 annual tax by 15 JanuaryNo direct legal consequence → Fine possible
- 27 October 2026AddedElectricity and energy tax 2026: annual return by 31 May, payment by 25 JuneDate 31 May 2027
- 27 October 2026Obligation text changedSolar Peak Act: no EEG payment at negative prices for new plants
Before
For plants commissioned from 25 February 2025, the reference value drops to zero in every period with a negative spot market price. Plants below 100 kW are only covered from the end of the year in which a smart metering system is installed.
- 27 October 2026Obligation text changedBSI TR-03109-1 v2.0: gateway certificates only with MUSS+
Before
Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician, plus TAF 8 in its new form and TAF 15. By mid-October 2026 no gateway had been certified under version 2.0.
- 27 October 2026AddedSmart meter rollout: 90 percent for final consumers above 100,000 kWh by end of 2028Date 31 December 2028
- 27 October 2026Obligation text changedSmart meter rollout: 90 percent of the installation cases since February 2025
Before
By the end of 2026 default metering point operators must have completed at least 90 percent of the final-consumer metering points that have fallen due since 25 February 2025. According to its press release, the Bundesnetzagentur collects progress twice a year, and it has been running supervisory proceedings against laggards since March 2026.
- 27 October 2026Legal consequence changedRegulatory account: application for 2025Regulator can enforce → Fine possible
- 27 October 2026AddedRedispatch 2.0: move controllable resources into the plan-value modelDate 1 January 2031
- 27 October 2026AddedApply for the simplified procedure for electricity for the regulatory period from 2029Date 31 March 2027
- 27 October 2026AddedSimplified procedure gas for the sixth regulatory period: applicationDate 31 March 2031
- 27 October 2026Obligation text changedSimplified procedure gas for the sixth regulatory period: application
Before
Gas distribution system operators that want to use the simplified procedure or the very small operator rule in the sixth regulatory period from 2033 apply by 31 March of the second-to-last year before the period starts, i.e. by 31 March 2031 (RAMEN Gas, operative points 3.1, 16.6 and 16.9).
- 27 October 2026Legal consequence changedSimplified procedure gas for the sixth regulatory period: applicationMoney is lost → Exclusion or loss of role
- 27 October 2026AddedCapital cost surcharge gas 2028: notify the regulatorDate 30 June 2027
- 27 October 2026Obligation text changedCapital cost surcharge gas 2028: notify the regulator
Before
Gas network operators that include a capital cost surcharge in a year's revenue cap notify the regulator by 30 June of the previous year, for 2028 by 30 June 2027 (RAMEN Gas, operative point 11.7).
- 27 October 2026AddedRAMEN Gas: notify the capital cost deduction for 2028Date 30 June 2027
- 27 October 2026Obligation text changedGrid package: system-serving connection capacity instead of maximum output
Before
The right to a grid connection no longer covers the maximum generation output: for plants connected from 1 January 2027, the draft caps feed-in from new first-segment solar plants at 70 percent of installed capacity and from onshore wind at 280 watts per square metre of rotor area (Section 8 of the draft EEG). By then the transmission system operators submit joint procedure rules for transmission grid connections to the Federal Network Agency, which may include prioritisation principles; distribution system operators may adopt them. Grid operators show available capacity on grid maps every month; the electronic enquiry procedure from 135 kilowatts only arrives in 2028 under the draft.
- 27 October 2026Legal consequence changed2028 network charges: publication by 15 OctoberRegulator can enforce → Fine possible
- 27 October 2026Legal consequence changed2027 network charges: publication by 15 OctoberRegulator can enforce → Fine possible
- 27 October 2026AddedPublish the draft network development plans for electricity and for gas and hydrogenDate 31 May 2027
- 27 October 2026Obligation text changedStandard metering contracts for default metering operators
Before
BK6-24-125: Since 1 July 2026 default metering point operators conclude metering contracts only on the MSV-AN and MSV-LF templates and publish them for conclusion in text form. Electricity network operators and all metering point operators conclude the framework contract (MSB-RV) in its amended version and adapt existing contracts.
- 27 October 2026Obligation text changed§ 14a control: target for working control
Before
Under the four-stage approach of Technical Study 2.0, working control with core processes for first use cases is due by the end of 2026. This is a target, not a statutory MsbG deadline.
- 27 October 2026AddedDelete or anonymise personal metering data (MsbG maximum periods)Date 31 December 2026
- 27 October 2026AddedMetering point operators: data communication for the balancing market via the gateway on requestDate 1 January 2028
- 27 October 2026Obligation text changedMetering point operators: data communication for the balancing market via the gateway on request
Before
From 1 January 2028 metering point operators must, on request, offer as an additional service the data communication needed to take part in the balancing market via the smart meter gateway, including the IT connection (Section 34(2) sentence 2 no. 5 MsbG). They may only refuse for technical reasons, giving reasons in text form.
- 27 October 2026AddedModern metering devices: equip all remaining metering points by end of 2032Date 31 December 2032
- 27 October 2026AddedHydrogen meters: only devices that connect to the smart meter gatewayDate 1 January 2028
- 27 October 2026Obligation text changedMsbG Section 19(5): non-compliant metering systems above 100,000 kWh or 100 kW only under conditions
Before
From 1 January 2029, metering systems that do not meet smart metering system requirements may only be installed and used at metering points above 100,000 kWh annual consumption or at plants above 100 kW if a smart metering system installation has been announced or ordered, there are no disproportionate risks, and the connection user has consented or the BSI has issued a determination. For all other metering points this limit has applied since the end of 2025.
- 27 October 2026Obligation text changedMiSpeL: end of the transition period
Before
Until the end of September 2027 the demarcation option and the flat-rate option can be used only with the consent of the grid operator and the metering operator. Both use that period to set up metering, data delivery and billing for the two options.
- 27 October 2026AddedMethane Regulation: verified report with site-level measurementsDate 5 February 2027
- 27 October 2026Obligation text changedMethane Regulation: verified report with site-level measurements
Before
Operators in gas transmission, gas distribution, underground storage and LNG submit by 5 February 2027 a report on source-level methane emissions with site-level measurements for operated assets, assessed by a verifier, then each year by 31 May; for non-operated assets first by 5 February 2028 (Article 12(3) Regulation (EU) 2024/1787).
- 27 October 2026AddedMethane Regulation: emissions report for non-operated assetsDate 5 February 2027
- 27 October 2026AddedMethane Regulation: report the methane intensity of productionDate 5 August 2028
- 27 October 2026Obligation text changedMethane Regulation: report the methane intensity of production
Before
By 5 August 2028 and every year thereafter, importers report the methane intensity of the production of natural gas, crude oil and coal placed on the Union market under supply contracts concluded or renewed since 4 August 2024 (Article 29(1) Regulation (EU) 2024/1787).
- 27 October 2026AddedMethane Regulation: meet maximum methane intensity valuesDate 5 August 2030
- 27 October 2026Obligation text changedMethane Regulation: meet maximum methane intensity values
Before
By 5 August 2030 and every year thereafter, importers prove for supply contracts concluded or renewed after 5 August 2030 that the methane intensity of production is below the maximum values the Commission sets by delegated act (Article 29(2) Regulation (EU) 2024/1787).
- 27 October 2026AddedMethane Regulation: importers prove equivalent monitoring at producer levelDate 1 January 2027
- 27 October 2026AddedMethane Regulation: annual importer report under Annex IXDate 31 May 2027
- 27 October 2026AddedKWKG: apply for approval of heat networks and heat storage commissioned in 2026Date 1 July 2027
- 27 October 2026Legal consequence changedKWKG: apply for approval of heat networks and heat storage commissioned in 2026No direct legal consequence → Exclusion or loss of role
- 27 October 2026AddedKWKG: apply for approval of CHP plants in continuous operation since 2025Date 31 December 2026
- 27 October 2026Obligation text changedKRITIS umbrella act in force
Before
Physical resilience of critical facilities: registration with BBK and BSI, resilience plans. The original registration deadline was dropped; the ordinance will set the new one.
- 27 October 2026AddedReport the long-term gas and hydrogen forecast to the gas TSODate 1 March 2028
- 27 October 2026AddedSubmit the internal capacity order for 2028 to the gas TSODate 15 July 2027
- 27 October 2026AddedGas network charges 2027: final charges along the cascade (2, 12 and 16 December)Date 2 December 2026
- 27 October 2026AddedReport biogas costs for nationwide cost pooling (plan 2028, actual 2026)Date 31 August 2027
- 27 October 2026AddedGuarantee of origin register: report feed-in data by form (15 January, May, September)Date 15 January 2027
- 27 October 2026AddedCancel regional guarantees for 2026 (window 1 April to 31 July 2027)Date 31 July 2027
- 27 October 2026AddedGuarantee of origin register: report 2026 supply volumes and guarantees (Section 30(5) HkRNDV)Date 1 July 2027
- 27 October 2026Obligation text changedGuarantee of origin register: report 2026 supply volumes and guarantees (Section 30(5) HkRNDV)
Before
Every electricity supplier sends the register administration at the Federal Environment Agency by 1 July the data under Section 30(5) HkRNDV for the previous year, including the electricity supplied to final consumers and the guarantees of origin cancelled for it; this applied for the first time on 1 July 2026.
- 27 October 2026AddedGas TSOs: publish revenue information under Annex I of the Gas RegulationDate 31 December 2026
- 27 October 2026Obligation text changedGas TSOs: publish revenue information under Annex I of the Gas Regulation
Before
Gas transmission system operators publish each year before 1 January the information under Annex I point 1 of Regulation (EU) 2024/1789 on the methods, parameters and values used to set their regulated revenues, accessibly and in German and English on their website (BK9-25-0617, operative points 1, 3 and 4).
- 27 October 2026AddedHydrogen transmission: entry-exit rules and charges on the ENNOH platformDate 1 January 2033
- 27 October 2026Obligation text changedHydrogen transmission: entry-exit rules and charges on the ENNOH platform
Before
From 1 January 2033 hydrogen transmission network operators meet the requirements for transmission system operators under Articles 5, 10 and 13 of Regulation (EU) 2024/1789 and publish the network charges for each network point on the platform of the European Network of Network Operators for Hydrogen (ENNOH) (Article 7(9)).
- 27 October 2026AddedHydrogen networks: publish network charge setting and methodsDate 1 January 2031
- 27 October 2026AddedSubmit and publish the DSO compliance reportDate 31 March 2027
- 27 October 2026AddedReport on 2026 supply interruptions to the Federal Network Agency (Section 52 EnWG)Date 30 April 2027
- 27 October 2026AddedElectricity disclosure: show the 2026 fuel mix from 1 July (Section 42 EnWG)Date 1 July 2027
- 27 October 2026AddedOffer a fixed-price contract: suppliers with more than 200,000 customers on 31 Dec 2026Date 1 January 2027
- 27 October 2026AddedDetermine and publish the default supplier for 2028 to 2030 (Section 36 EnWG)Date 30 September 2027
- 27 October 2026AddedGas storage: 80 per cent fill level on 1 November, 30 per cent on 1 FebruaryDate 1 November 2026
- 27 October 2026Title changedGas storage: 80 per cent fill level on 1 November, 30 per cent on 1 February
Before
Gas storage: 90 percent fill level on 1 November, 30 percent on 1 February
- 27 October 2026Obligation text changedGas storage: 80 per cent fill level on 1 November, 30 per cent on 1 February
Before
Gas storage operators ensure by contract that each facility is filled to 90 percent of its working gas volume on 1 November 2026 and to 30 percent on 1 February 2027 (Section 35b(1) sentence 2 EnWG), unless a regulation under Section 35b(3) sets other values. The provision applies until the end of 31 March 2027 (Section 35i EnWG).
- 27 October 2026AddedSection 23c EnWG: publish network structural data by 1 AprilDate 1 April 2027
- 27 October 2026Obligation text changedSection 23c EnWG: publish network structural data by 1 April
Before
Every year by 1 April, electricity and gas network operators publish their network's structural data on their website, mostly as of 31 December of the previous year: line lengths, energy withdrawn, number of withdrawal or exit points, areas and further network data (Section 23c(1) and (4) EnWG). Electricity network operators also report the number of smart metering systems, of agreements under Section 14a EnWG and of grid connections not completed for more than three and more than six months after the request in the previous year (subsection 1 nos. 4a to 4d).
- 27 October 2026Legal consequence changedSection 23c EnWG: publish network structural data by 1 AprilRegulator can enforce → Fine possible
- 27 October 2026AddedL-gas market area conversion: report actual and planned costs to the regulatorDate 31 August 2027
- 27 October 2026Added"Use instead of curtail": first evaluation and report (Section 13k(9) EnWG)Date 1 July 2028
- 27 October 2026AddedFive-year forecast of congestion measures to the Federal Network Agency (Section 13(10) EnWG)Date 1 July 2027
- 27 October 2026AddedTSOs' system stability report (Section 12i EnWG)Date 1 January 2027
- 27 October 2026AddedBiogas grid connection: last day for the advance payment under the old rulesDate 31 December 2026
- 27 October 2026AddedSmall electricity DSOs: notify charging points and stop operating themDate 31 December 2026
- 27 October 2026Obligation text changedSmall electricity DSOs: notify charging points and stop operating them
Before
Electricity distribution system operators whose vertically integrated undertaking has fewer than 100,000 customers must notify the Federal Network Agency in text form of charging points they already operated before 27 July 2021 and stop operating them by the end of 31 December 2026, unless the agency has granted approval under Section 7c(2) EnWG beforehand (Section 118(34) sentences 3 and 4 EnWG).
- 27 October 2026AddedCompliance report of independent transmission operators (Section 10e EnWG)Date 30 September 2027
- 27 October 2026Legal consequence changedCongestion management: report the 2028 cost reference value and the 2026 differenceRegulator can enforce → Fine possible
- 27 October 2026AddedEnFG: report reduced levies for 2026 to the network operator (Section 52(2) EnFG)Date 31 March 2027
- 27 October 2026AddedEnFG: CHP forecast for 2028 and 2026 year-end settlement with the TSODate 31 August 2027
- 27 October 2026Obligation text changedEnFG: CHP forecast for 2028 and 2026 year-end settlement with the TSO
Before
By 31 August distribution system operators send the TSO the forecast CHP volumes, bonuses and grid withdrawals for the following year (Section 50 no. 3 EnFG). On the same date the year-end settlement between distribution and transmission system operators for the previous year takes place (Section 19(1) no. 2 EnFG); the resulting payment claims must be settled by 15 September (Section 19(2)).
- 27 October 2026AddedEnFG: final settlement of EEG and KWKG payments for 2026 to the TSODate 31 May 2027
- 27 October 2026AddedDetermine and report the EEG and KWKG funding requirement for 2028 (Section 4 EnFG)Date 30 September 2027
- 27 October 2026Obligation text changedDetermine and report the EEG and KWKG funding requirement for 2028 (Section 4 EnFG)
Before
The TSOs determine by 30 September the EEG and KWKG funding requirements for the following year and report them to the Federal Ministry for Economic Affairs, the Federal Office for Economic Affairs and Export Control and the Federal Network Agency, the latter also receiving the offshore connection costs (Section 4 EnFG).
- 27 October 2026AddedEnFG: report on storage and charging points with reduced levies for 2026Date 31 May 2027
- 27 October 2026Obligation text changedEnergy sharing: network operators' joint web platform (Section 20b EnWG)
Before
Network operators jointly build a nationwide web platform under Section 20b EnWG that also registers energy sharing agreements. The Federal Network Agency sets the date; until then energy sharing runs through the service model.
- 27 October 2026Legal consequence changedEnergy sharing: network operators' joint web platform (Section 20b EnWG)Regulator can enforce → Fine possible
- 27 October 2026AddedEEG innovation tender: bid date 1 May 2027, bids by 3 May 2027Date 1 May 2027
- 27 October 2026Date movedEEG innovation tender: bid date 1 May 2027, bids by 3 May 20271 May 2027 → 3 May 2027
- 27 October 2026Title changedEEG innovation tender: bid date 1 May 2027, bids by 3 May 2027
Before
EEG innovation tender: bid date 1 May 2027
- 27 October 2026Obligation text changedEEG innovation tender: bid date 1 May 2027, bids by 3 May 2027
Before
Bids must reach the Federal Network Agency by the bid date; the dates are set by law (Section 28e(1) EEG): 1 May and 1 September, until 2028.
- 27 October 2026AddedEEG tender solar second segment (rooftop): bid date 1 February 2027Date 1 February 2027
- 27 October 2026AddedEEG tender biomethane: bid date 1 April 2027Date 1 April 2027
- 27 October 2026AddedEEG tender biomass: bid date 1 April 2027Date 1 April 2027
- 27 October 2026AddedTSOs: five-year outlook on renewables expansion and EEG paymentsDate 25 October 2027
- 27 October 2026AddedEEG: data for the 2026 final settlement to the network operator (28 February)Date 28 February 2027
- 27 October 2026AddedEEG transparency: plant operators above EUR 100,000 report missing dataDate 31 July 2027
- 27 October 2026AddedNegative prices: TSOs publish zero-value periods of 2026Date 31 January 2027
- 27 October 2026AddedBiomass: prove feedstock logbook and environmental expert report for 2026Date 28 February 2027
- 27 October 2026AddedEEG: report a change of sales form for 1 January 2027 by end of NovemberDate 30 November 2026
- 27 October 2026Obligation text changedEEG 2027 (government draft): transition payment instead of a feed-in tariff for new small systems
Before
Under the government draft, subject to the Bundestag's decision and EU state aid approval: new systems no longer receive a feed-in tariff, and the market premium only starts at 25 kW. Instead the grid operator pays a temporary transition payment for at most 36 months, for systems below 50 kW commissioned in 2027, below 25 kW commissioned in 2028 and below 7 kW commissioned in 2029 or 2030. Systems below 25 kW in other direct marketing receive a 1.5 ct/kWh bonus for up to 48 months. Rooftop systems below 100 kW cap feed-in at 50 percent permanently. Systems commissioned by 31 December 2026 stay under the old rules. In the MsbG, mandatory smart meters and control devices for generation start above 2 kW, and the installation quotas in Section 45 count metering points instead of kilowatts. The Bundesrat wants to drop the 2 kW threshold; the federal government rejects that.
- 27 October 2026Obligation text changedRedispatch without balancing: consultation on cost reimbursement closes
Before
Ruling Chamber 8 is consulting on how DSOs reimburse costs when redispatch measures are not specifically balanced. Comments are due by 21 October 2026, with the final ruling targeted by year end.
- 27 October 2026AddedSection 14a: publish control measures monthly by the 15thDate 1 March 2025
- 27 October 2026Obligation text changedSection 14a: publish control measures monthly by the 15th
Before
Network operators that control devices in a grid-oriented or preventive way show the affected network areas on a joint web platform and publish, machine-readable per postcode of the network area, the type of control, the number of devices affected, the average power reduced and the total duration, in monthly resolution by the 15th calendar day of the following month (BK6-22-300 Annex 1 para. 8.4, first from 1 March 2025 under para. 10.7).
- 27 October 2026AddedSection 14a: exemption for non-controllable devices ends with 2026 commissioningDate 1 January 2027
- 27 October 2026AddedBEHG: 2026 emissions report of fuel suppliers to the German Emissions Trading AuthorityDate 31 July 2027
- 27 October 2026Obligation text changedBEHG: 2026 emissions report of fuel suppliers to the German Emissions Trading Authority
Before
Anyone placing fuels on the market, such as gas suppliers, reports the verified fuel emissions of the previous year to the German Emissions Trading Authority by 31 July (Section 7(1) BEHG), i.e. for 2026 by 31 July 2027. Whether 2027 is still reported under the BEHG depends on the start of EU emissions trading for buildings and transport (Section 24(1) BEHG).
- 27 October 2026AddedBEHG: surrender emission allowances for 2026Date 30 September 2027
- 27 October 2026AddedSurcharge for special grid use: show contributions separatelyDate 25 October 2027
- 27 October 2026Obligation text changedFallback metering operator: publication for 2027
Before
At the start of the calendar year the Bundesnetzagentur publishes the name, address and website of the fallback metering operator responsible for each federal state, together with the operators that declared readiness. The basis is the monitoring data under section 35 EnWG.
- 27 October 2026Legal consequence changedReport customer numbers and federal states to the regulatorsRegulator can enforce → Fine possible
- 27 October 2026AddedReport the revenue cap adjustment and the network charge adjustment (Section 28 ARegV)Date 1 January 2027
- 27 October 2026AddedAgNes: TSOs adjust network charges by 1 OctoberDate 1 October 2028
- 27 October 2026Obligation text changedAgNes: framework ruling on electricity grid charges
Before
Under the draft of 6 August 2026, low-voltage connections up to 100,000 kWh keep a standing charge and an energy charge; those generating behind the connection pay a prosumer surcharge of 70 to 90 percent of the standing charge, plug-in solar devices excepted. Above that, and above low voltage, a capacity price applies, and generation plants above 30 kW pay a feed-in charge, existing plants and plants with an investment decision before notification only 20 years after commissioning. The draft provides dynamic grid charges only for storage (2030 at the earliest, 2033 at the latest) and generation (2032 to 2035), not for final customers for now. Follow-up rulings in 2027, effect from 2029.
- 27 October 2026AddedAgNes: network operators identify prosumers and notify suppliersDate 1 April 2028
- 27 October 2026AddedAgNes: show prosumer status on the electricity billDate 1 April 2028
- 27 October 2026AddedAgNes: explain a late adjustment of network charges for 1 JanuaryDate 14 December 2028
- 27 October 2026AddedAgNes: final consumption data to the upstream network operatorDate 30 June 2028
- 27 October 2026AddedAgNes: final consumption data to the Federal Network AgencyDate 30 September 2028
- 27 October 2026AddedAgNes: proof of the final investment decision for grandfatheringDate 31 March 2027
- 27 October 2026AddedAgNes: publish the uniform national feed-in chargeDate 15 October 2028
- 27 October 2026AddedAgNes: DSOs report feed-in data to the TSODate 30 June 2028
- 27 October 2026AddedAgNes: dynamic network charge for battery storage at levels 1 to 5Date 1 January 2033
- 27 October 2026AddedAgNes: dynamic network charge for generation plants at levels 1 to 5Date 1 January 2035
- 27 October 2026AddedAgNes: publish the final settlement of the surcharge for special grid useDate 15 September 2030
- 25 October 2026AddedWaKandA: hydrogen network access rules and joint booking platformDate 1 January 2028
- 25 October 2026AddedWaKandA: publish an overview of the hydrogen clustersDate 1 January 2027
- 25 October 2026AddedPublish 2026 network lossesDate 1 April 2027
- 25 October 2026AddedVDE-AR-N 4105: deadline for power limitation evidenceDate 1 March 2028
- 25 October 2026AddedFederal subsidy for transmission network costs 2027 to 2029Date 1 January 2027
- 25 October 2026Obligation text changedPower plant strategy (StromVKG): second auction for long-duration capacity
Before
On 29 December 2026 the Federal Network Agency auctions another 4.5 gigawatts of long-duration capacity. Eligible are generation plants able to feed in 80 percent of their capacity for at least ten consecutive hours, with a 15-year commitment.
- 25 October 2026Obligation text changedSmart meter rollout: 90 percent of total generation capacity
Before
By the end of 2032 default metering point operators must have equipped metering points covering at least 90 percent of the total installed generation capacity, separately for systems up to and above 100 kilowatts. The yardstick is installed capacity, not the number of metering points.
- 25 October 2026Obligation text changedSmart meter rollout: 90 percent of new generation capacity by the end of 2030
Before
By the end of 2030 default metering point operators must have equipped at least 90 percent of the generation capacity commissioned from 1 October 2028 to 30 September 2030, separately for systems up to and above 100 kilowatts. The yardstick is installed capacity, not the number of metering points.
- 25 October 2026Obligation text changedSmart meter rollout: 90 percent of new generation capacity by the end of 2028, for the first time also above 100 kilowatts
Before
By the end of 2028 default metering point operators must have equipped, for systems up to 100 kilowatts, at least 90 percent of the capacity commissioned from 1 October 2026 to 30 September 2028 and at least 50 percent of the capacity commissioned from 1 January 2018 to 25 February 2025. For systems above 100 kilowatts equipping starts in 2028 at the latest, and by the end of 2028 the equipped metering points must cover 90 percent of the capacity commissioned from 1 October 2027 to 30 September 2028.
- 25 October 2026Obligation text changedSmart meter rollout: 90 percent of the installation cases since February 2025
Before
By the end of 2026 default metering point operators must have completed at least 90 percent of the metering points that have fallen due since 25 February 2025. According to its press release, the Bundesnetzagentur collects progress twice a year, and it has been running supervisory proceedings against laggards since March 2026.
- 25 October 2026Obligation text changedMaKo format release, notice no. 56
Before
25 AHB and MIG versions covering 13 EDIFACT message types, AS4 profile 1.2 and the AS4 transport rules 2.6 become binding. Test plan, exception handling and fallback scenarios need to be in place.
- 25 October 2026Obligation text changedHeating costs ordinance: retrofit remote reading
Before
Building owners retrofit or replace heat and hot water meters and heat cost allocators installed up to 1 December 2021 that cannot be read remotely by the end of 2026 (Section 5(3) HeizkostenV). The same duty applies to a heat supplier that bills occupants directly by their share of total consumption (Section 1(3) HeizkostenV).
- 25 October 2026AddedElectricity efficiency benchmarking: submit 2026 data to the Federal Network AgencyDate 30 April 2027
- 25 October 2026AddedReport customer numbers and federal states to the regulatorsDate 31 March 2027
- 23 October 2026Obligation text changedWPG § 32: decarbonisation roadmap for heat networks
Before
Operators of existing heat networks submit the roadmap: 30 percent renewable by 2030, 80 percent by 2040.
- 23 October 2026Title changedWPG: heat plans for all municipalities with 100,000 inhabitants or fewer
Before
WPG: heat plans for all municipalities under 100,000 inhabitants
- 23 October 2026Obligation text changedWPG: heat plans for all municipalities with 100,000 inhabitants or fewer
Before
After the large cities, all remaining municipalities must submit their heat planning; utilities provide the data basis.
- 23 October 2026Obligation text changedGas WACC: end of the consultation on the rate of return
Before
Gas distribution grid operators can comment on the draft decision on the flat-rate return on capital. The 3.76 percent rate carries the revenue caps from 2028.
- 23 October 2026Obligation text changedVDE-AR-N 4105:2026-03: end of the transition period
Before
From this date only the 2026-03 edition applies to connecting generation plants to the low-voltage grid. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW have to be switched over by then.
- 23 October 2026Status changedVDE-AR-N 4100:2026-04: end of the transition periodplanned → date open
- 23 October 2026AddedSmart meter rollout: 90 percent of total generation capacityDate 31 December 2032
- 23 October 2026AddedSmart meter rollout: 90 percent of new generation capacity by the end of 2030Date 31 December 2030
- 23 October 2026AddedSmart meter rollout: 90 percent of new generation capacity by the end of 2028, for the first time also above 100 kilowattsDate 31 December 2028
- 23 October 2026Title changedSmart meter rollout: 90 percent of new generation capacity from plants above 7 and up to 100 kilowatts
Before
Smart meter rollout: 90 percent of new generation capacity up to 100 kilowatts
- 23 October 2026Obligation text changedSmart meter rollout: 90 percent of new generation capacity from plants above 7 and up to 100 kilowatts
Before
By the end of 2026 default metering point operators must have equipped at least 90 percent of the generation capacity up to 100 kilowatts that came online between 25 February 2025 and 30 September 2026. The yardstick is installed capacity, not the number of metering points.
- 23 October 2026Obligation text changedSmart meter rollout: 20 percent of the mandatory installation cases
Before
Default metering point operators had to fit at least 20 percent of all metering points due for a smart metering system by the end of 2025. The Bundesnetzagentur opened supervisory proceedings against 434 companies that missed the quota, running since March 2026.
- 23 October 2026Obligation text changedRegulatory account: application for 2025
Before
Electricity network operators apply for the 2025 regulatory account balance with the regulator by 31 December 2026.
- 23 October 2026Obligation text changedRedispatch 2.0: choice of settlement method for 2027
Before
Under ruling BK6-23-241, the plant operator sets the settlement method for each technical resource by 30 November for the following year. Without a decision the simplified peak settlement applies; the flat-rate settlement ends for existing resources at the end of 2028.
- 23 October 2026Obligation text changedGerman NIS2 implementation act in force
Before
Applies without a transition period: registration, risk management, reporting within 24 and 72 hours, management liability.
- 23 October 2026Obligation text changedGrid package: system-serving connection capacity instead of maximum output
Before
The right to a grid connection no longer covers the maximum generation output: for plants connected from 1 January 2027, the draft caps feed-in from new first-segment solar plants at 70 percent of installed capacity and from onshore wind at 280 watts per square metre of rotor area (Section 8 of the draft EEG). By then the transmission system operators submit procedure rules with prioritisation criteria to the Federal Network Agency, and distribution system operators may adopt them. Grid operators show available capacity on grid maps every month; the electronic enquiry procedure from 135 kilowatts only arrives in 2028 under the draft.
- 23 October 2026Title changedGrid expansion plan under section 14d EnWG: filing due 31 October 2026
Before
Grid expansion plan under section 14d EnWG: first filing
- 23 October 2026Obligation text changedGrid expansion plan under section 14d EnWG: filing due 31 October 2026
Before
Distribution system operators with 100,000 or more customers submit their first grid expansion plan to the Federal Network Agency, then every two years by 31 October. Smaller operators are covered only if they curtailed more than 3 percent of wind or solar output in each of the two previous years.
- 23 October 2026Obligation text changedStandard metering contracts for default metering operators
Before
BK6-24-125: MSB-RV, MSV-AN and MSV-LF are binding for default metering point operators.
- 23 October 2026AddedDefault metering point operators: publish services and price sheets by 31 OctoberDate 31 October 2026
- 23 October 2026AddedMsbG Section 3(3a): requested meter changes within one monthDate 27 May 2023
- 23 October 2026Obligation text changedGas: new metering point operator framework contract
Before
Gas network operators and metering point operators had to draw up a new metering point operator framework contract by 1 October 2026. The previous ruling BK7-17-026 was revoked on the same day.
- 23 October 2026Title changed24-hour supplier switch: statutory duty since 2026
Before
24-hour supplier switch: full obligation, electricity
- 23 October 2026Obligation text changed24-hour supplier switch: statutory duty since 2026
Before
Star-shaped switch process via the MaLo ID; extension to gas and hydrogen still open.
- 23 October 2026Obligation text changedSAP ECC and IS-U: end of mainstream maintenance
Before
Extended maintenance until 2030 at a surcharge. Migrations to S/4HANA Utilities take 18 to 36 months.
- 23 October 2026Obligation text changedHeating costs ordinance: retrofit remote reading
Before
Heat suppliers retrofit or replace meters installed before 5 October 2021 that cannot be read remotely (FFVAV). Building owners do the same for heat and hot water meters and heat cost allocators (Heating Costs Ordinance).
- 23 October 2026AddedFFVAV: make district heating meters remotely readable by the end of 2026Date 31 December 2026
- 23 October 2026Status changedCongestion income 2026: report the actual use to the Federal Network Agencyfixed → date open
- 23 October 2026Title changedEnergy sharing: network operators' joint web platform (Section 20b EnWG)
Before
Energy sharing: practical start with the BNetzA platform
- 23 October 2026Obligation text changedEnergy sharing across the grid boundary
Before
From 1 June 2028 energy sharing must also work across adjacent balancing areas. According to the Federal Network Agency's Notice No. 73, the supplier based service model covers this too, with no further implementation by network operators.
- 23 October 2026AddedEEG: control via the smart meter gateway from 2028Date 1 January 2028
- 23 October 2026Date movedEEG onshore wind tender: bid deadline 1 November 20261 November 2026 → 2 November 2026
- 23 October 2026Obligation text changedEEG onshore wind tender: bid deadline 1 November 2026
Before
Bids for onshore wind turbines must reach the Federal Network Agency by the bid deadline. According to the agency, the volume is about 2,495 MW and the 2026 ceiling price is 7.25 cents per kilowatt hour.
- 23 October 2026Title changedEEG first-segment solar tender: bid deadline 1 December 2026
Before
EEG ground-mounted solar tender: bid deadline 1 December 2026
- 23 October 2026Obligation text changedEEG first-segment solar tender: bid deadline 1 December 2026
Before
Bids for ground-mounted solar plants (first segment) must reach the Federal Network Agency by the bid deadline. According to the agency, the actual volume is about 2,079 MW.
- 23 October 2026AddedEEG 2027 (government draft): refinancing contribution for new plants from 100 kWDate 1 January 2027
- 23 October 2026Title changedEEG 2027 (government draft): transition payment instead of a feed-in tariff for new small systems
Before
EEG 2027 (government draft): no fixed tariff for new PV below 25 kW
- 23 October 2026Obligation text changedEEG 2027 (government draft): transition payment instead of a feed-in tariff for new small systems
Before
Under the government draft, subject to the Bundestag's decision and EU state aid approval: new PV systems below 25 kW receive a temporary transition payment from the grid operator for at most 36 months instead of the feed-in tariff, then direct marketing with a 1.5 ct/kWh bonus for up to 48 months. Rooftop systems below 100 kW cap feed-in at 50 percent permanently. Systems commissioned by 31 December 2026 stay under the old rules. In the MsbG, mandatory smart meters and control devices for generation start above 2 kW, and the installation quotas in Section 45 count metering points instead of kilowatts. The Bundesrat wants to drop the 2 kW threshold; the federal government rejects that.
- 23 October 2026Obligation text changedBSIG § 39: first evidence for critical installations
Before
Operators of critical installations must prove their security measures through an audit, review or certification, then every three years. The BSI sets the date, at the earliest three years after the installation counts as critical.
- 23 October 2026Obligation text changedBRÜCKEN ruling: provisions for decommissioning and dismantling gas grids
Before
From the fifth regulatory period, allocations to and releases of provisions for decommissioning and unavoidable dismantling of gas grids count as cost shares outside the efficiency benchmark. Operators and lessors of gas grids need a traceable derivation of those provisions in the cost review.
- 23 October 2026Obligation text changedAgNes: framework ruling on electricity grid charges
Before
Under the draft of 6 August 2026, low-voltage connections up to 100,000 kWh keep a standing charge and an energy charge; those generating behind the connection pay a prosumer surcharge of 70 to 90 percent of the standing charge, plug-in solar devices excepted. Above that, and above low voltage, a capacity price applies, and generation plants above 30 kW pay a feed-in charge. The draft provides dynamic grid charges only for storage (2030 at the earliest, 2033 at the latest) and generation (2032 to 2035), not for final customers for now. Follow-up rulings in 2027, effect from 2029.
- 18 October 2026Status changedVDE-AR-N 4105:2026-03: end of the transition periodfixed → date open
- 18 October 2026Status changedVDE-AR-N 4100:2026-04: end of the transition periodfixed → planned
- 18 October 2026AddedRevenue cap 2028: TSO report on the adjustment and provisional network chargesDate 29 September 2027
- 18 October 2026AddedControllability: TSOs' overall report under Section 12(2c) EnWGDate 30 November 2026
- 18 October 2026AddedCoalition committee: smart meter rollout above 90 percent of all relevant metering points by end of 2030Date 31 December 2030
- 18 October 2026AddedQuality element for grid reliability: submit 2026 data to the Federal Network AgencyDate 30 April 2027
- 18 October 2026AddedUse instead of curtail: daily tenders for curtailment volumes (Section 13k EnWG)Date 1 October 2026
- 18 October 2026Added2028 network charges: publication by 15 OctoberDate 15 October 2027
- 18 October 2026AddedMsbG Section 19(5): non-compliant metering systems above 100,000 kWh or 100 kW only under conditionsDate 1 January 2029
- 18 October 2026AddedCapital cost mark-up 2028: application to the regulatorDate 30 June 2027
- 18 October 2026AddedEU proposal: smart metering systems for 50 percent of all final customers (Article 18b Regulation (EU) 2019/943)Date 31 December 2031
- 18 October 2026AddedEU ETS 2: first allowance auction on EEX (early auctions)Date 18 January 2027
- 18 October 2026AddedCongestion management: report the 2028 cost reference value and the 2026 differenceDate 31 August 2027
- 18 October 2026AddedCongestion income 2026: report the actual use to the Federal Network AgencyDate 31 January 2027
- 18 October 2026AddedRenewables grid cost pass-through: binding notification to the TSODate 14 October 2027
- 17 October 2026Title changedEU AI Act: transparency duties under Art. 50
Before
EU AI Act: classification and transparency obligations
- 17 October 2026Obligation text changedEU AI Act: transparency duties under Art. 50
Before
AI systems must be classified, transparency obligations apply. High-risk requirements follow in stages.
- 17 October 2026Obligation text changedEU AI Act: high-risk requirements, Annex III
Before
AI in critical infrastructure and grid operations falls under Annex III; the BNetzA becomes market surveillance authority.
- 14 October 2026Obligation text changedBSI TR-03109-6 v2.0 for gateway administrators
Before
New and re-certification under v2.0 with ISMS and pentest requirements; v1.0 runs in parallel until end of 2028.
- 14 October 2026AddedBSI TR-03109-1 v2.0: gateway certificates only with MUSS+Date 1 January 2027
- 14 October 2026AddedSmart meter gateways: installation only to version 2.0 of protection profile and TR-03109-1Date 1 January 2028
- 14 October 2026Obligation text changedSmart meter rollout: 90 percent of the 2029 to 2030 installation cases
Before
Third interim mark of the statutory rollout: at least 90 percent of the metering points that fall due in 2029 and 2030. The target year for the full stock is 2032.
- 14 October 2026Obligation text changedSmart meter rollout: 90 percent of the installation cases since February 2025
Before
By the end of 2026 default metering point operators must have completed at least 90 percent of the metering points that have fallen due since 25 February 2025. The Bundesnetzagentur collects progress twice a year and has been running supervisory proceedings against laggards since March 2026.
- 14 October 2026Title changedMaBiS hub: go-live (BDEW scenario)
Before
MaBiS hub: go-live
- 14 October 2026Obligation text changedMaBiS hub: go-live (BDEW scenario)
Before
Central electricity balance group settlement is scheduled to go live on 1 October 2029 under the introduction scenario. Block 1 of the ruling (BK6-24-210-1) was open for comment until 17 November 2025; block 2 on balance group settlement follows.
- 14 October 2026Title changedMaBiS hub: test systems of all market partners ready (BDEW scenario)
Before
MaBiS hub: market partner systems adapted
- 14 October 2026Obligation text changedMaBiS hub: test systems of all market partners ready (BDEW scenario)
Before
Under the introduction scenario, market partners adapt their systems to the MaBiS hub by 1 July 2028. From 1 January 2029 the hub is filled with master and movement data.
- 14 October 2026Obligation text changedEEG 2027 (government draft): transition payment instead of a feed-in tariff for new small systems
Before
Under the government draft, subject to the Bundestag's decision and EU state aid approval: new PV systems below 25 kW receive a temporary transition payment from the grid operator for at most 36 months instead of the feed-in tariff, then direct marketing with a 1.5 ct/kWh bonus for up to 48 months. Rooftop systems below 100 kW cap feed-in at 50 percent permanently, and mandatory smart meters for generation start above 2 kW. Systems commissioned by 31 December 2026 stay under the old rules.
- 14 October 2026AddedaFRR at the Czech border: consultation on the capacity method closesDate 16 October 2026
- 14 October 2026Obligation text changedAgNes: framework ruling on electricity grid charges
Before
Time-variable charges, capacity prices and feed-in charges are set; follow-up rulings 2027, effect from 2029.
- 14 October 2026Obligation text changedAgNes: follow-up rulings that fill in the detail
Before
After the framework ruling at the end of 2026, the Bundesnetzagentur sets the detail in 2027, including time variable charges and capacity prices. Distribution system operators plan billing and systems against these follow-up rulings.
- 13 October 2026Status changedSmart meter rollout: 20 percent of the mandatory installation casesin force → fixed
- 13 October 2026Obligation text changedGrid package: system-serving connection capacity instead of maximum output
Before
The right to a grid connection no longer covers the maximum generation output. Grid operators are to prioritise connection projects by planning maturity and grid benefit and to show available capacity on grid maps every month. The electronic enquiry procedure from 135 kilowatts only arrives in 2028 under the draft.
- 13 October 2026Obligation text changedNEST: fifth regulatory period, electricity
Before
New electricity incentive regulation with quality elements on digitalisation and energy transition capability.
- 13 October 2026Obligation text changedNEST: fifth regulatory period, gas
Before
New incentive regulation under the NEST rulings of December 2025, then three-year periods.
- 13 October 2026Dropped§ 14a control: target for working controlBefore: planned
- 13 October 2026AddedCongestion income 2027: report the planned use to the Federal Network AgencyDate 31 October 2026
- 13 October 2026Date moved§ 14a EnWG: end of the transition period31 December 2028 → 1 January 2029
- 13 October 2026Obligation text changed§ 14a EnWG: end of the transition period
Before
From 2029 grid-oriented control based on grid state data applies; preventive control ends.
- 11 October 2026AddedPower plant strategy (StromVKG): second auction for long-duration capacityDate 29 December 2026
- 11 October 2026AddedPower plant strategy (StromVKG): auction for generation capacityDate 18 May 2027
- 11 October 2026AddedRegulatory account: application for 2025Date 31 December 2026
- 11 October 2026AddedGas: new metering point operator framework contractDate 1 October 2026
- 11 October 2026AddedSchedule nomination process description v4.7 becomes bindingDate 1 April 2027
- 11 October 2026AddedSecure exchange rules for scheduling v2.4 become bindingDate 1 October 2027
- 11 October 2026AddedRenewables grid cost pass-through: binding notification to the TSODate 14 October 2026
- 11 October 2026AddedRedispatch without balancing: consultation on cost reimbursement closesDate 21 October 2026
- 11 October 2026AddedElectricity efficiency benchmarking: data collection consultation closesDate 26 October 2026
- 4 October 2026Status changedWiM Gas 2.0 appliesfixed → in force
- 4 October 2026AddedMiSpeL: end of the transition periodDate 30 September 2027
- 4 October 2026Status changedMiSpeL: ruling on market integration of storage and charging pointsplanned → fixed
- 4 October 2026Obligation text changedMiSpeL: ruling on market integration of storage and charging points
Before
The Federal Network Agency plans to publish the ruling with a demarcation option and a flat-rate option for storage and charging points in mixed use. It sets how volumes are separated for EEG support and levy privileges.
- 4 October 2026Status changedMaKo format release, notice no. 56fixed → in force
- 4 October 2026Status changedMaKo format release, notice no. 58planned → fixed
- 4 October 2026Title changedMaKo format release, notice no. 58
Before
MaKo format release, notice no. 57: UTILTS is replaced
- 4 October 2026Obligation text changedMaKo format release, notice no. 58
Before
UTILTS is fully replaced by API web services; metering periods, switching times and load curves move into new structures. Anyone processing UTILTS today needs an API connection by then.
- 4 October 2026AddedBRÜCKEN ruling: provisions for decommissioning and dismantling gas gridsDate 1 January 2028
September 2026
- 30 September 2026AddedVDE-AR-N 4105:2026-03: end of the transition periodDate 1 March 2027
- 30 September 2026AddedVDE-AR-N 4100:2026-04: end of the transition periodDate 1 April 2027
- 29 September 2026Added§ 14a EnWG module 3: offer and bill the time-variable network chargeDate 1 April 2025
- 28 September 2026AddedCapacity market (StromVKG): first technology-open capacity auctionDate 1 December 2027
- 28 September 2026AddedElectricity storage: commissioning deadline for the grid fee exemption under Section 118(6) EnWGDate 4 August 2029
- 28 September 2026AddedSolar Peak Act: no EEG payment at negative prices for new plantsDate 25 February 2025
- 28 September 2026AddedREMIT II: new reporting formats and first exposure reportDate 29 October 2027
- 28 September 2026AddedRedispatch 2.0: choice of settlement method for 2027Date 30 November 2026
- 28 September 2026AddedMetering Act Section 40: new gas meters with load profile metering on the smart meter gatewayDate 1 July 2028
- 28 September 2026AddedElectricity suppliers: duty to hold adequate hedging strategies (Section 5(4a) EnWG)Date 23 December 2025
- 28 September 2026AddedCHP Act: cut-off for commercial operation or permit of CHP plants, heat networks and heat storageDate 31 December 2026
- 28 September 2026AddedCustomer installations: transition period for existing installations endsDate 1 January 2029
- 28 September 2026AddedPrice change on 1 January 2027: notice deadline in default supplyDate 20 November 2026
- 28 September 2026AddedEU ETS 2 starts: emissions trading for buildings and transport replaces the national BEHGDate 1 January 2028
- 28 September 2026Added2027 levies: publication by the transmission system operatorsDate 25 October 2026
- 28 September 2026AddedEEG onshore wind tender: bid deadline 1 November 2026Date 1 November 2026
- 28 September 2026AddedEEG first-segment solar tender: bid deadline 1 December 2026Date 1 December 2026
- 28 September 2026AddedAFIR: card payment at existing fast chargers from 50 kWDate 1 January 2027
- 27 September 2026AddedSmart meter rollout: 20 percent of the mandatory installation casesDate 31 December 2025
- 26 September 2026AddedEEG 2027 (government draft): transition payment instead of a feed-in tariff for new small systemsDate 1 January 2027
- 23 September 2026Obligation text changedGrid expansion plan under section 14d EnWG: filing due 31 October 2026
Before
Distribution grid operators submit the grid expansion plan to the Bundesnetzagentur for the first time, then every two years. The congestion analysis with measures is mandatory.
- 23 September 2026Status changed§ 14a control: target for working controlfixed → planned
- 23 September 2026Title changed§ 14a control: target for working control
Before
MsbG: functional control with core processes
- 23 September 2026Obligation text changed§ 14a control: target for working control
Before
Default metering operators must offer § 14a control technically. Penalty payments against rollout laggards have been running since March 2026.
- 23 September 2026Status changedMiSpeL: ruling on market integration of storage and charging pointsfixed → planned
- 23 September 2026Obligation text changedMiSpeL: ruling on market integration of storage and charging points
Before
Balancing and grid charges for storage and bidirectional charging points; MaKo automation only from 2027.
- 23 September 2026Obligation text changedMaKo format release, notice no. 56
Before
26 EDIFACT formats and AS4 adjustments become binding. Test schedule, clarification processes and fallback scenarios must be in place.
- 23 September 2026Obligation text changedAFIR: ISO 15118-20 for new charging points
Before
From 2027 new public and private charging points must support ISO 15118-20 for bidirectional charging. Plug and charge under ISO 15118-2 has applied since 8 January 2026. The PKI and the OCPP back end have to carry both.
- 23 September 2026Obligation text changedHeating costs ordinance: retrofit remote reading
Before
All heat and hot water meters must be remotely readable; FFVAV requires the same for suppliers.
- 23 September 2026Obligation text changedEnergy sharing: network operators' joint web platform (Section 20b EnWG)
Before
The § 20b platform and the BNetzA clarification of July 2026 push mass operation to 2027. Date open.
- 23 September 2026Obligation text changedEnergy sharing across the grid boundary
Before
Shared use must also work in the balancing area of a directly neighbouring distribution grid operator. That requires two grid operators to coordinate allocation, balancing and billing.
- 23 September 2026Obligation text changedEnergy sharing under § 42c EnWG
Before
Grid operators must settle energy sharing communities. Practical start with the BNetzA platform under § 20b realistically not before 2027.
- 18 September 2026AddedFallback metering operator: publication for 2027Date 1 January 2027
- 14 September 2026AddedGas WACC: the rate of return decision is issuedDate 31 December 2026
- 14 September 2026Added2027 network charges: publication by 15 OctoberDate 15 October 2026
- 13 September 2026Obligation text changedGas WACC: end of the consultation on the rate of return
Before
Gas distribution grid operators can still comment on the draft ruling on the flat rate of return. The 3.76 percent rate carries the revenue caps of the fifth gas regulatory period from 2028.
- 13 September 2026AddedSmart meter rollout: 90 percent of new generation capacity from plants above 7 and up to 100 kilowattsDate 31 December 2026
- 13 September 2026Title changedGrid package: system-serving connection capacity instead of maximum output
Before
Grid package: capacity maps and reservation from 135 kW
- 13 September 2026Obligation text changedGrid package: system-serving connection capacity instead of maximum output
Before
Monthly grid capacity maps, status information within two months, flexible grid connection agreements. Bundestag from September 2026.
- 11 September 2026AddedGas WACC: end of the consultation on the rate of returnDate 14 September 2026
- 11 September 2026AddedGrid development scenarios 2027: end of the consultationDate 28 September 2026
- 11 September 2026Obligation text changedGrid development scenarios 2027: end of the consultation
Before
Distribution grid operators and municipal utilities can comment on the draft electricity and gas/hydrogen scenarios. These assumptions frame the grid development plan and with it the hydrogen volumes that reach their own gas networks.
- 11 September 2026Obligation text changedGrid development scenarios 2027: end of the consultation
Before
Distribution grid operators and municipal utilities can comment on the electricity and gas/hydrogen drafts. The assumptions frame the grid development plan.
- 11 September 2026Title changedSmart meter rollout: 90 percent of the 2029 to 2030 installation cases
Before
Smart meter rollout: 95 percent of mandatory cases
- 11 September 2026Obligation text changedSmart meter rollout: 90 percent of the 2029 to 2030 installation cases
Before
Third mandatory quota under MsbG; the target year for the full rollout is 2032.
- 11 September 2026Title changedSmart meter rollout: 90 percent of the 2027 to 2028 installation cases
Before
Smart meter rollout: 50 percent of mandatory cases
- 11 September 2026Obligation text changedSmart meter rollout: 90 percent of the 2027 to 2028 installation cases
Before
Second mandatory quota under MsbG; BNetzA supervisory proceedings have been running since the 20 percent quota.
- 11 September 2026AddedSmart meter rollout: 90 percent of all mandatory casesDate 31 December 2032
- 11 September 2026AddedSmart meter rollout: 90 percent of the installation cases since February 2025Date 31 December 2026
- 11 September 2026AddedGrid expansion plan under section 14d EnWG: filing due 31 October 2026Date 31 October 2026
- 11 September 2026Obligation text changedGrid expansion plan under section 14d EnWG: filing due 31 October 2026
Before
Distribution system operators file the grid expansion plan with the regulator for the first time, then every two years. Required content includes a congestion analysis of existing line sections with the measures planned for them, ordered as optimisation, reinforcement and expansion.
- 11 September 2026AddedMaBiS hub: go-live (BDEW scenario)Date 1 October 2029
- 11 September 2026Title changedMaBiS hub: test systems of all market partners ready (BDEW scenario)
Before
MaBiS hub: go-live
- 11 September 2026Obligation text changedMaBiS hub: test systems of all market partners ready (BDEW scenario)
Before
Central balancing settlement in two blocks; ruling on block 1 in 2026, go-live in the second half of 2028.
- 11 September 2026AddedKI-MIG: the Bundesnetzagentur becomes market surveillance authorityDate 29 July 2026
- 11 September 2026Obligation text changedAFIR: ISO 15118-20 for new charging points
Before
Plug and charge under ISO 15118-20 for new public and private charging points; PKI and OCPP back end must follow.
- 11 September 2026AddedEnergy sharing across the grid boundaryDate 1 June 2028
- 11 September 2026AddedBSIG § 39: first evidence for critical installationsDate 6 December 2028
- 11 September 2026Obligation text changedEU AI Act: labelling duty extends to AI already in use
Before
The four month transition period ends. Generative AI systems placed on the market before 2 August 2026 must mark their output in machine readable form, which covers chatbots and text generators in utility customer service.
- 10 September 2026AddedMaKo format release, notice no. 58Date 1 April 2027
- 10 September 2026AddedEU AI Act: labelling duty extends to AI already in useDate 2 December 2026
- 10 September 2026AddedAgNes: follow-up rulings that fill in the detailDate 31 December 2027