  <title>innobu deadline calendar: new and changed (Plant operator (generation))</title>
  <subtitle>Every change to the energy transition deadline calendar: deadlines added, dates moved, status changes, corrected obligations and legal consequences, with dates.</subtitle>
  <link rel="self" type="application/atom+xml" href="https://www.innobu.com/assets/feeds/fristen-aenderungen-en-ab.xml"/>
  <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-changes.html"/>
  <id>https://www.innobu.com/assets/feeds/fristen-aenderungen-en-ab.xml</id>
  <updated>2026-11-24T00:00:00Z</updated>
  <author><name>innobu GmbH</name><uri>https://www.innobu.com/</uri></author>
  <rights>A classification for typical market roles, not a review of your individual case and not legal advice. Whether an obligation applies to your company (thresholds, exemptions) is for your legal department or counsel to confirm. The calendar doesn&#x27;t replace your own deadline review.</rights>
  <entry>
    <title>Added: Significant security incident: 24 hours, 72 hours, one month</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#sicherheitsvorfall-meldung-energienetz"/>
    <id>tag:innobu.com,2026-11-24:fristen/sicherheitsvorfall-meldung-energienetz/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 24 hours after; within 72 hours after; within 1 month after.

Operators of energy supply networks, energy installations and digital energy services under Section 5c(1) sentence 1 nos. 1 to 3 EnWG report a significant security incident to the reporting office under Section 32 BSIG as an early warning at the latest 24 hours after becoming aware of it, with an initial assessment at the latest 72 hours after becoming aware of it, and with a final report at the latest one month after that notification, or a progress report if the incident is still ongoing (Section 5d(3) EnWG, Section 32(2) BSIG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__5d.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Market master data register: register a new plant</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-einheit-registrierung"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastr-einheit-registrierung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 1 month after.

Operators register units, for example for generation and storage, and EEG plants in the market master data register within one month of commissioning, and CHP plants within one month of starting or, after modernisation, resuming continuous operation (Section 5(5) MaStRV).

Source: https://www.gesetze-im-internet.de/mastrv/__5.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Market master data register: record changes</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-aenderung-registrieren"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastr-aenderung-registrieren/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 1 month after.

When recorded data change, the responsible party registers the change within one month of it occurring (Section 7(1) MaStRV).

Source: https://www.gesetze-im-internet.de/mastrv/__7.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Market master data register: new data annex with ZEREZ ID applies (third MaStRV amendment)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastrv-zerez-id-netzbetreiber-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastrv-zerez-id-netzbetreiber-2027/neu/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 April 2027.

From 1 April 2027 the new annex to the Market Master Data Register Ordinance applies. Network operators then enter, as a mandatory field, the identification number from the central register for unit and component certificates (ZEREZ ID) for units commissioned from 1 January 2026; plug-in solar devices are exempt.

Source: https://www.recht.bund.de/bgbl/1/2026/291/regelungstext.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Redispatch without balancing: consultation on cost reimbursement closes</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-redispatch-ausgleich-konsultation"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk8-redispatch-ausgleich-konsultation/pflicht/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Ruling Chamber 8 is consulting on how DSOs pay plant operators compensation when redispatch measures are not balanced: under the draft, per MWh of curtailed energy, a blended price of 72.5 percent ID-AEP and 27.5 percent reBAP plus a flat EUR 1.35/MWh, with a negative blended price triggering a payment by the plant operator. Comments are due by 21 October 2026, with the final ruling targeted by year end.

Ruling Chamber 8 consulted until 21 October 2026 on how DSOs pay plant operators compensation when redispatch measures are not balanced: under the draft, per MWh of curtailed energy, a blended price of 72.5 percent ID-AEP and 27.5 percent reBAP plus a flat EUR 1.35/MWh, with a negative blended price triggering a payment by the plant operator. The comments have been published; the final ruling was still pending on 22 November 2026.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-001/BK8-26-0001-A_Konsultation_Festlegungsentwurf.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Redispatch without balancing: compensation and cost pass-through under BK8-26-001-A</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-redispatch-aufwendungsersatz-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk8-redispatch-aufwendungsersatz-2027/neu/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

Under the draft ruling, from 1 January 2027 DSOs pay plant operators compensation for redispatch measures without balancing, pass these costs through as volatile cost shares and publish the curtailed energy for each calendar quarter no later than three months after quarter end. The deductible for late advance notice first applies to calendar year 2028.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-001/Downloads/BK8-26-001-A_Festlegungsentwurf_DL_BF.pdf?__blob=publicationFile&amp;v=4

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Offshore wind: consultation on the dynamic bidding procedure rules from 2027 closes (BK6-26-477)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk6-offshore-gebotsverfahren-konsultation-2026-12"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk6-offshore-gebotsverfahren-konsultation-2026-12/neu/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 4 December 2026.

Ruling Chamber 6 is consulting on its draft rules for the two-stage dynamic bidding procedure in offshore wind tenders from 2027: bid steps with one decimal place, a step of 0.2 ct/kWh per round (0.1 ct/kWh with two bidders) and intermediate-round bids. Comments are due by 4 December 2026; the rules only become binding when the tender is announced after the amended Offshore Wind Act enters into force.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2026/BK6-26-477/BK6-26-477_konsultation.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: dynamic network charge for generation plants at levels 1 to 5</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-dynamisches-netzentgelt-erzeuger-2035"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-dynamisches-netzentgelt-erzeuger-2035/folge/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Avoided network charges: 75 per cent cut from 2028</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vermiedene-netzentgelte-abschmelzung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/vermiedene-netzentgelte-abschmelzung-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-02-1x1_verm_NE/Downloads/Festlegung_DL_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: publish the uniform national feed-in charge</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-einspeiseentgelt-veroeffentlichung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-einspeiseentgelt-veroeffentlichung-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Avoided network charges: 75 per cent cut from 2028</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vermiedene-netzentgelte-abschmelzung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/vermiedene-netzentgelte-abschmelzung-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

Electricity DSOs cut the avoided upstream costs underlying the charges for decentralised feed-in in stages: by 50 per cent from 1 July 2026 and from 1 January 2027, and by 75 per cent from 1 January 2028 (GBK-25-02-1#1, operative point 2).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-02-1x1_verm_NE/Downloads/Festlegung_DL_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: VDE-AR-N 4105: deadline for power limitation evidence</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-zertifikate-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-zertifikate-2028/folge/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Civil-law consequence → Money is lost.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EU emissions trading: 2026 emissions report for power and heating plants</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#tehg-emissionsbericht-anlagen-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/tehg-emissionsbericht-anlagen-2026/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 March 2027.

Operators of installations in EU emissions trading, such as combined heat and power and heating plants with a total rated thermal input of 20 MW or more, determine their emissions under the approved monitoring plan and report them to the German Emissions Trading Authority by the end of 31 March of the following year (Section 21(1) TEHG).

Source: https://www.gesetze-im-internet.de/tehg_2025/__21.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: EU emissions trading: 2026 emissions report for power and heating plants</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#tehg-emissionsbericht-anlagen-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/tehg-emissionsbericht-anlagen-2026/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Operators of installations in EU emissions trading, such as combined heat and power and heating plants above 20 MW rated thermal input, determine their emissions under the approved monitoring plan and report them to the German Emissions Trading Authority by the end of 31 March of the following year (Section 21(1) TEHG).

Operators of installations in EU emissions trading, such as combined heat and power and heating plants with a total rated thermal input of 20 MW or more, determine their emissions under the approved monitoring plan and report them to the German Emissions Trading Authority by the end of 31 March of the following year (Section 21(1) TEHG).

Source: https://www.gesetze-im-internet.de/tehg_2025/__21.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EU emissions trading: surrender allowances for 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#tehg-abgabe-berechtigungen-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/tehg-abgabe-berechtigungen-2026/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 September 2027.

Operators of installations in EU emissions trading surrender to the German Emissions Trading Authority by 30 September as many allowances as their installations emitted in the previous year (Section 7(1) TEHG).

Source: https://www.gesetze-im-internet.de/tehg_2025/__7.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Capacity market: TSO platform for prequalification by 1 May 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromvkg-plattform-praequalifizierung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromvkg-plattform-praequalifizierung-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 May 2027.

TSOs set up a joint web platform, for prequalification by 1 May 2027 and for capacity tenders by 15 October 2027 (Section 26(6) StromVKG). Plant operators submit their applications through it.

Source: https://www.gesetze-im-internet.de/stromvkg/__26.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Title changed: Capacity market: TSO platform for prequalification by 1 May 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromvkg-plattform-praequalifizierung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromvkg-plattform-praequalifizierung-2027/titel/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="titel" label="Title changed"/>
    <content type="text">Title changed.

Before: Capacity market: TSO platform for prequalification from 1 May 2027

Source: https://www.gesetze-im-internet.de/stromvkg/__26.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Capacity market: apply to complete provisional prequalification by 31 October 2031</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromvkg-abschluss-praequalifizierung-2031"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromvkg-abschluss-praequalifizierung-2031/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 October 2031.

Capacity providers with provisional prequalification submit the application to complete it, with the data and evidence under Section 62 StromVKG, to the responsible TSO via the joint platform by the end of 31 October 2031 (Section 61(2) StromVKG). By then every plant in a plant pool must have a smart metering system and load profile metering (Section 21 StromVKG).

Source: https://www.gesetze-im-internet.de/stromvkg/__61.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Electricity and energy tax: choose monthly or annual filing for 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromst-energiest-wahlrecht-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromst-energiest-wahlrecht-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2026.

Suppliers liable for electricity or energy tax decide how they file for 2027. For electricity annual filing is the default; anyone wanting monthly filing declares this to the main customs office by 31 December 2026 (Section 8(2) StromStG). For natural gas monthly filing is the default; annual filing must be declared in writing before the calendar year starts and applies for full calendar years until revoked (Section 39(1) and (2) EnergieStG).

Source: https://www.gesetze-im-internet.de/stromstg/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Electricity and energy tax: choose monthly or annual filing for 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromst-energiest-wahlrecht-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromst-energiest-wahlrecht-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Suppliers liable for electricity or energy tax choose between monthly and annual filing. The declaration for 2027 must reach the main customs office by 31 December 2026 (Section 8(2) StromStG); for energy tax it must be there before the start of the calendar year (Section 39(2) EnergieStG).

Suppliers liable for electricity or energy tax decide how they file for 2027. For electricity annual filing is the default; anyone wanting monthly filing declares this to the main customs office by 31 December 2026 (Section 8(2) StromStG). For natural gas monthly filing is the default; annual filing must be declared in writing before the calendar year starts and applies for full calendar years until revoked (Section 39(1) and (2) EnergieStG).

Source: https://www.gesetze-im-internet.de/stromstg/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Solar Peak Act: no EEG payment at negative prices for new plants</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#solarspitzen-negative-preise"/>
    <id>tag:innobu.com,2026-11-24:fristen/solarspitzen-negative-preise/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: For plants commissioned from 25 February 2025, the reference value drops to zero in every period with a negative spot market price. Plants below 100 kW are only covered from the end of the year in which a smart metering system is installed.

For plants commissioned from 25 February 2025 whose reference value was not already set in a bid date before that day, the reference value drops to zero in every period with a negative spot market price. Plants below 100 kW are only covered from the end of the year in which a smart metering system is installed, plants below 2 kW only from the end of the year of the determination under Section 85(2) no. 12 EEG.

Source: https://www.gesetze-im-internet.de/eeg_2014/__51.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: KWKG: apply for approval of CHP plants in continuous operation since 2025</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#kwkg-11-zulassungsantrag-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/kwkg-11-zulassungsantrag-2026/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2026.

Operators of CHP plants that started continuous operation in 2025 apply for approval to the Federal Office for Economic Affairs and Export Control by 31 December 2026. It then takes effect from the start of continuous operation (Section 11(3) sentence 1 KWKG); the same applies after modernisation or retrofitting.

Source: https://www.gesetze-im-internet.de/kwkg_2016/__11.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG innovation tender: bid date 1 May 2027, bids by 3 May 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-innovationsausschreibung-2027-05"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-innovationsausschreibung-2027-05/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 May 2027.

Bids must reach the Federal Network Agency by the bid date; the dates are set by law (Section 28e(1) EEG): 1 May and 1 September, until 2028. 1 May 2027 is a Saturday and a public holiday, so the submission period ends on Monday, 3 May 2027 (Sections 188 and 193 BGB).

Source: https://www.gesetze-im-internet.de/eeg_2014/__28e.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Date moved: EEG innovation tender: bid date 1 May 2027, bids by 3 May 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-innovationsausschreibung-2027-05"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-innovationsausschreibung-2027-05/termin/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="termin" label="Date moved"/>
    <content type="text">Date moved: 1 May 2027 → 3 May 2027.

Source: https://www.gesetze-im-internet.de/eeg_2014/__28e.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Title changed: EEG innovation tender: bid date 1 May 2027, bids by 3 May 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-innovationsausschreibung-2027-05"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-innovationsausschreibung-2027-05/titel/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="titel" label="Title changed"/>
    <content type="text">Title changed.

Before: EEG innovation tender: bid date 1 May 2027

Source: https://www.gesetze-im-internet.de/eeg_2014/__28e.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: EEG innovation tender: bid date 1 May 2027, bids by 3 May 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-innovationsausschreibung-2027-05"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-innovationsausschreibung-2027-05/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Bids must reach the Federal Network Agency by the bid date; the dates are set by law (Section 28e(1) EEG): 1 May and 1 September, until 2028.

Bids must reach the Federal Network Agency by the bid date; the dates are set by law (Section 28e(1) EEG): 1 May and 1 September, until 2028. 1 May 2027 is a Saturday and a public holiday, so the submission period ends on Monday, 3 May 2027 (Sections 188 and 193 BGB).

Source: https://www.gesetze-im-internet.de/eeg_2014/__28e.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG tender solar second segment (rooftop): bid date 1 February 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-solar2-2027-02"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-solar2-2027-02/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 February 2027.

Bids must reach the Federal Network Agency by the bid date; the dates are set by law (Section 28b(1) EEG): 1 February, 1 June and 1 October, until 2029.

Source: https://www.gesetze-im-internet.de/eeg_2014/__28b.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG tender biomethane: bid date 1 April 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-biomethan-2027-04"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-biomethan-2027-04/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 April 2027.

Bids must reach the Federal Network Agency by the bid date; the dates are set by law (Section 28d(1) EEG): 1 April and 1 September, until 2028.

Source: https://www.gesetze-im-internet.de/eeg_2014/__28d.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG tender biomass: bid date 1 April 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-biomasse-2027-04"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-biomasse-2027-04/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 April 2027.

Bids must reach the Federal Network Agency by the bid date; the dates are set by law (Section 28c(1) EEG): 1 April and 1 October, until 2028.

Source: https://www.gesetze-im-internet.de/eeg_2014/__28c.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG: data for the 2026 final settlement to the network operator (28 February)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-71-endabrechnungsdaten-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-71-endabrechnungsdaten-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 28 February 2027.

Plant operators provide the network operator by 28 February with all data needed for the final settlement of the previous year, per installation (Section 71(1) no. 1 EEG), i.e. for 2026 by 28 February 2027. In direct marketing these data often come from the direct marketer in practice.

Source: https://www.gesetze-im-internet.de/eeg_2014/__71.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG transparency: plant operators above EUR 100,000 report missing data</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-71-4-transparenzangaben-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-71-4-transparenzangaben-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 July 2027.

Plant operators that received more than EUR 100,000 in payments under Section 19(1) or Section 50 EEG in the previous year and whose data in the market master data register are unpublished or incomplete send the TSO by 31 July the data for the European Commission&#x27;s transparency database, with address and register number (Section 71(4) EEG).

Source: https://www.gesetze-im-internet.de/eeg_2014/__71.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Negative prices: TSOs publish zero-value periods of 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-51a-nullwert-viertelstunden-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-51a-nullwert-viertelstunden-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 January 2027.

TSOs publish by 31 January on a joint website the number of quarter-hours and hours of the previous year in which the applicable value fell to zero because of negative prices (Section 51a(4) EEG). Plant operators and direct marketers need these figures for the extension of the support period under Section 51a.

Source: https://www.gesetze-im-internet.de/eeg_2014/__51a.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Biomass: prove feedstock logbook and environmental expert report for 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-44c-biomasse-nachweis-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-44c-biomasse-nachweis-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 28 February 2027.

Operators of biomass plants receiving EEG payments prove by 28 February for the previous year, where applicable, the share of electricity from liquid biomass with a copy of the feedstock logbook and the conditions of Section 44b(2) or Section 44c(4) or (5) with an environmental expert report (Section 44c(2) and (6) EEG).

Source: https://www.gesetze-im-internet.de/eeg_2014/__44c.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG: report a change of sales form for 1 January 2027 by end of November</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-21c-wechsel-veraeusserungsform-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-21c-wechsel-veraeusserungsform-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 November 2026.

Plant operators must notify the network operator before the start of the preceding calendar month if they first sell in a form under Section 21b EEG or switch between forms, including the balancing group (Section 21c(1) EEG). For a switch on 1 January 2027 that is 30 November 2026; the rule applies to every month change.

Source: https://www.gesetze-im-internet.de/eeg_2014/__21c.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Redispatch without balancing: consultation on cost reimbursement closes</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-redispatch-ausgleich-konsultation"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk8-redispatch-ausgleich-konsultation/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Ruling Chamber 8 is consulting on how DSOs reimburse costs when redispatch measures are not specifically balanced. Comments are due by 21 October 2026, with the final ruling targeted by year end.

Ruling Chamber 8 consulted until 21 October 2026 on how DSOs pay plant operators compensation when redispatch measures are not balanced: under the draft, per MWh of curtailed energy, a blended price of 72.5 percent ID-AEP and 27.5 percent reBAP plus a flat EUR 1.35/MWh, with a negative blended price triggering a payment by the plant operator. The comments have been published; the final ruling was still pending on 22 November 2026.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-001/BK8-26-0001-A_Konsultation_Festlegungsentwurf.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Section 14a: exemption for non-controllable devices ends with 2026 commissioning</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk6-22-300-ausnahme-nicht-steuerbare-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk6-22-300-ausnahme-nicht-steuerbare-2026/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

For controllable consumption devices that demonstrably cannot be controlled and cannot be made controllable at reasonable cost, paragraphs 3 to 5 of determination BK6-22-300 only do not apply if they are commissioned by 31 December 2026 (Annex 1 para. 10.6). For commissioning from 2027 participation in grid-oriented control and the ban on refusing or delaying the connection for lack of grid capacity apply without this exemption.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2022/BK6-22-300/Beschluss/BK6-22-300_Beschluss_Anlage1.pdf?__blob=publicationFile&amp;v=1

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: AgNes: proof of the final investment decision for grandfathering</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-investitionsentscheidung-nachweis-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-investitionsentscheidung-nachweis-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 March 2027.

Operators of generation plants, battery storage, pumped storage and electrolysers that rely on a final investment decision taken before publication for the charging rules prove it to the responsible network operator by 31 March 2027 (AgNes draft ruling, operative points 17.4 to 17.7).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: AgNes: publish the uniform national feed-in charge</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-einspeiseentgelt-veroeffentlichung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-einspeiseentgelt-veroeffentlichung-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 15 October 2028.

The TSOs determine a uniform national capacity-based feed-in charge each year and publish it by 15 October for the following year as a separate item in the price sheet, first in 2028 for 2029 (AgNes draft ruling, operative point 9.2).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: AgNes: dynamic network charge for generation plants at levels 1 to 5</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-dynamisches-netzentgelt-erzeuger-2035"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-dynamisches-netzentgelt-erzeuger-2035/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2035.

Network operators bill the dynamic network charge to operators of generation plants at grid and transformer levels 1 to 5 from 1 January 2035 at the latest, not before 1 January 2032; offshore wind is exempt (AgNes draft ruling, operative point 12.2 sentence 2, subject to the condition in operative point 12.3).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: VDE-AR-N 4105: deadline for power limitation evidence</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-zertifikate-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-zertifikate-2028/neu/2026-10-25</id>
    <updated>2026-10-25T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 March 2028.

According to VDE FNN, power limitation under Section 9 EEG can be implemented until 1 March 2028 through P AV,E protection certified under VDE-AR-N 4105:2026-03, P AV,E monitoring certified under the 2018-11 edition, or a permanent active power reduction at the inverter.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Power plant strategy (StromVKG): second auction for long-duration capacity</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromvkg-langzeitkapazitaeten-2026-12"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromvkg-langzeitkapazitaeten-2026-12/pflicht/2026-10-25</id>
    <updated>2026-10-25T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: On 29 December 2026 the Federal Network Agency auctions another 4.5 gigawatts of long-duration capacity. Eligible are generation plants able to feed in 80 percent of their capacity for at least ten consecutive hours, with a 15-year commitment.

On 29 December 2026 the Federal Network Agency auctions further long-duration capacity, in principle 4.5 gigawatts; the exact volume follows from the announcement due on 10 November 2026. Eligible are generation plants able to feed in 80 percent of their capacity for at least ten consecutive hours, with a 15-year commitment.

Source: https://www.gesetze-im-internet.de/stromvkg/BJNR0D2AB0026.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Redispatch 2.0: choice of settlement method for 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#redispatch-abrechnungsvariante-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/redispatch-abrechnungsvariante-2027/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under ruling BK6-23-241, the plant operator sets the settlement method for each technical resource by 30 November for the following year. Without a decision the simplified peak settlement applies; the flat-rate settlement ends for existing resources at the end of 2028.

Under BK6-23-241 (BilAReM section 3.2.1), operators of wind and solar plants from 100 kW set the settlement method for each technical resource by 30 November for the following year. Without a decision the simplified peak settlement applies; the flat-rate settlement ends for existing resources at the end of 2028 unless feed-in is not metered quarter-hourly.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2023/BK6-23-241/BK6-23-241_beschluss.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG: control via the smart meter gateway from 2028</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-smgw-steuerung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-smgw-steuerung-2028/neu/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

From 1 January 2028, and once a smart metering system is installed, plants above 25 kW in direct marketing must be readable and remotely controllable via the smart meter gateway (Section 10b(2) EEG). From 2028, after a smart metering system and control device have been installed, grid operators pay the plant operator EUR 100 gross for each year begun until the controllability test has succeeded (Section 9(2a) EEG).

Source: https://www.gesetze-im-internet.de/eeg_2014/__10b.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Date moved: EEG onshore wind tender: bid deadline 1 November 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-wind-2026-11"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-wind-2026-11/termin/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="termin" label="Date moved"/>
    <content type="text">Date moved: 1 November 2026 → 2 November 2026.

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Wind_Onshore/GT01112026/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: EEG onshore wind tender: bid deadline 1 November 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-wind-2026-11"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-wind-2026-11/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Bids for onshore wind turbines must reach the Federal Network Agency by the bid deadline. According to the agency, the volume is about 2,495 MW and the 2026 ceiling price is 7.25 cents per kilowatt hour.

Bids for onshore wind turbines must reach the Federal Network Agency by the bid deadline; as 1 November 2026 is a Sunday, bids are due by midnight on Monday, 2 November 2026. According to the agency, the volume is about 2,495 MW and the 2026 ceiling price is 7.25 cents per kilowatt hour.

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Wind_Onshore/GT01112026/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Title changed: EEG first-segment solar tender: bid deadline 1 December 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-solar-2026-12"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-solar-2026-12/titel/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="titel" label="Title changed"/>
    <content type="text">Title changed.

Before: EEG ground-mounted solar tender: bid deadline 1 December 2026

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Solaranlagen1/01122026/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: EEG first-segment solar tender: bid deadline 1 December 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-solar-2026-12"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-solar-2026-12/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Bids for ground-mounted solar plants (first segment) must reach the Federal Network Agency by the bid deadline. According to the agency, the actual volume is about 2,079 MW.

Bids for first-segment solar plants (ground-mounted and on structures that are neither buildings nor noise barriers) must reach the Federal Network Agency by the bid date. According to the agency, the volume is about 2,226 MW and the ceiling price 5.53 cents per kilowatt hour.

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Solaranlagen1/01122026/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG 2027 (government draft): refinancing contribution for new plants from 100 kW</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-2027-refinanzierungsbeitrag"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-2027-refinanzierungsbeitrag/neu/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

Under the government draft, subject to the Bundestag&#x27;s decision and EU state aid approval: operators of new plants from 100 kW with an award or a notification under Section 20(2) EEG pay the grid operator a refinancing contribution per kilowatt hour fed in for years in which the annual market value exceeds the applicable value. The grid operator collects it with monthly instalments due on the 15th of the following month, and it falls due four weeks after the final statement reaches the plant operator.

Source: https://dserver.bundestag.de/btd/21/078/2107867.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Power plant strategy (StromVKG): second auction for long-duration capacity</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromvkg-langzeitkapazitaeten-2026-12"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromvkg-langzeitkapazitaeten-2026-12/neu/2026-10-11</id>
    <updated>2026-10-11T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 29 December 2026.

On 29 December 2026 the Federal Network Agency auctions further long-duration capacity, in principle 4.5 gigawatts; the exact volume follows from the announcement due on 10 November 2026. Eligible are generation plants able to feed in 80 percent of their capacity for at least ten consecutive hours, with a 15-year commitment.

Source: https://www.gesetze-im-internet.de/stromvkg/BJNR0D2AB0026.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Power plant strategy (StromVKG): auction for generation capacity</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromvkg-erzeugungskapazitaeten-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromvkg-erzeugungskapazitaeten-2027/neu/2026-10-11</id>
    <updated>2026-10-11T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 18 May 2027.

On 18 May 2027 the Federal Network Agency auctions 2 gigawatts of generation capacity. Only generation plants are eligible, with a 15-year commitment.

Source: https://www.gesetze-im-internet.de/stromvkg/BJNR0D2AB0026.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>