  <title>innobu deadline calendar: new and changed (Default metering point operator)</title>
  <subtitle>Every change to the energy transition deadline calendar: deadlines added, dates moved, status changes, corrected obligations and legal consequences, with dates.</subtitle>
  <link rel="self" type="application/atom+xml" href="https://www.innobu.com/assets/feeds/fristen-aenderungen-en-gmsb.xml"/>
  <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-changes.html"/>
  <id>https://www.innobu.com/assets/feeds/fristen-aenderungen-en-gmsb.xml</id>
  <updated>2026-11-22T00:00:00Z</updated>
  <author><name>innobu GmbH</name><uri>https://www.innobu.com/</uri></author>
  <rights>A classification for typical market roles, not a review of your individual case and not legal advice. Whether an obligation applies to your company (thresholds, exemptions) is for your legal department or counsel to confirm. The calendar doesn&#x27;t replace your own deadline review.</rights>
  <entry>
    <title>Obligation text changed: BSI TR-03109-1 v2.0: gateway certificates only with MUSS+</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#smgw-tr-03109-1-v2-muss-plus-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/smgw-tr-03109-1-v2-muss-plus-2027/pflicht/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician, plus TAF 8 in its new form and TAF 15. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.

Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.

Source: https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/Schutzprofile/Uebergangsregelung-PP-0073_und_TR-03109-1.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: E-invoicing: paper and other formats from 2027 only up to EUR 800,000 prior-year turnover or via EDI</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#ustg-e-rechnung-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/ustg-e-rechnung-uebergang-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

For supplies from 1 January 2027, businesses may only send invoices to other businesses on paper or, with the recipient&#x27;s consent, in a format not complying with EN 16931 if their total turnover in the previous year was no more than EUR 800,000, or as an EDI invoice with the recipient&#x27;s consent. Both exceptions end on 31 December 2027 (Section 27(38) UStG).

Source: https://www.gesetze-im-internet.de/ustg_1980/__27.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: MiSpeL: ruling on market integration of storage and charging points</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mispel-festlegung"/>
    <id>tag:innobu.com,2026-11-24:fristen/mispel-festlegung/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges.

The Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges. The ruling was published in the Official Gazette on 7 October 2026 and takes effect upon notification (operative point 8).

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Aufsicht/MiSpeL/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: VDE-AR-N 4100:2026-04: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4100-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4100-uebergang-2027/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.vde-verlag.de/normen/0100932/vde-ar-n-4100-anwendungsregel-2026-04.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Default metering point operators: publish services and price sheets by 31 October 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-37-veroeffentlichung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-37-veroeffentlichung-2027/neu/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 October 2027.

By 31 October 2027, default metering point operators publish the scope of their installation duties under Section 29 MsbG, their standard and possible additional services, and price sheets with expected annual prices for at least three years (Section 37(1) MsbG).

Source: https://www.gesetze-im-internet.de/messbg/__37.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: § 14a EnWG: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#14a-uebergang"/>
    <id>tag:innobu.com,2026-11-24:fristen/14a-uebergang/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2022/BK6-22-300/Beschluss/BK6-22-300_Beschluss_Anlage1.pdf?__blob=publicationFile&amp;v=1

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Controllability check: network operators&#x27; tests and reports by 30 September via the TSOs&#x27; portals</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#steuerbarkeitscheck-meldung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/steuerbarkeitscheck-meldung-2027/neu/2026-10-28</id>
    <updated>2026-10-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 September 2027.

Every electricity network operator carries out test adjustments under Section 13a(1) EnWG and retrievals of actual feed-in every year, since 2026 also for plants below 100 kW; every default metering operator checks the deployment status of smart metering systems and control units every year and sends it to the network operator (Section 12(2b) EnWG). Under the TSOs&#x27; guidelines, tests and data submission via their portals must be completed by 30 September; upstream network operators check the data from 1 to 31 October.

Source: https://www.gesetze-im-internet.de/enwg_2005/__12.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: BSI TR-03109-1 v2.0: gateway certificates only with MUSS+</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#smgw-tr-03109-1-v2-muss-plus-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/smgw-tr-03109-1-v2-muss-plus-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician, plus TAF 8 in its new form and TAF 15. By mid-October 2026 no gateway had been certified under version 2.0.

Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.

Source: https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/Schutzprofile/Uebergangsregelung-PP-0073_und_TR-03109-1.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Smart meter rollout: 90 percent for final consumers above 100,000 kWh by end of 2028</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#rollout-quote-grossverbraucher-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/rollout-quote-grossverbraucher-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2028.

For final consumers with more than 100,000 kWh annual consumption (Section 30(1) no. 1 MsbG), default metering point operators start installing smart metering systems in 2028 at the latest and equip at least 90 percent of the metering points to be newly equipped per installation case group in that period by the end of 2028 (Section 45(1) sentence 1 no. 3(a) MsbG). Further milestones follow at the end of 2030 and 2032.

Source: https://www.gesetze-im-internet.de/messbg/__45.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Smart meter rollout: 90 percent of the installation cases since February 2025</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#rollout-quote-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/rollout-quote-2026/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: By the end of 2026 default metering point operators must have completed at least 90 percent of the final-consumer metering points that have fallen due since 25 February 2025. According to its press release, the Bundesnetzagentur collects progress twice a year, and it has been running supervisory proceedings against laggards since March 2026.

For final consumers in the cases of Section 30(1) nos. 2 to 5 and (2) MsbG, i.e. with annual consumption above 6,000 up to 100,000 kWh, with an agreement under Section 14a EnWG or with a control unit at the grid connection point, default metering point operators must have equipped at least 90 percent of the metering points that have fallen due since 25 February 2025 by the end of 2026 (Section 45(1) sentence 1 no. 4(b) MsbG). For final consumers above 100,000 kWh the quota only starts in 2028 (no. 3). According to its press release, the Bundesnetzagentur collects progress twice a year; its supervisory proceedings since March 2026 concern the 20 percent quota for the end of 2025 (no. 4(a)).

Source: https://www.gesetze-im-internet.de/messbg/__45.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Standard metering contracts for default metering operators</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msv-gmsb"/>
    <id>tag:innobu.com,2026-11-24:fristen/msv-gmsb/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: BK6-24-125: Since 1 July 2026 default metering point operators conclude metering contracts only on the MSV-AN and MSV-LF templates and publish them for conclusion in text form. Electricity network operators and all metering point operators conclude the framework contract (MSB-RV) in its amended version and adapt existing contracts.

BK6-24-125: Since 1 July 2026 default metering point operators conclude metering contracts only on the MSV-AN and MSV-LF templates, adapt existing metering contracts to them and publish them for conclusion in text form. Electricity network operators and all metering point operators conclude the framework contract (MSB-RV) in its amended version and adapt existing contracts.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK06/BK6_83_Zug_Mess/846_messstellenvertrag/Messstellenvertrag_node.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: § 14a control: target for working control</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-steuerung-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-steuerung-2026/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the four-stage approach of Technical Study 2.0, working control with core processes for first use cases is due by the end of 2026. This is a target, not a statutory MsbG deadline.

Under the four-stage approach of Technical Study 2.0, a study by a consultancy, working control with core processes for first use cases is due by the end of 2026. No law and no authority sets this target; it is not a statutory MsbG deadline.

Source: https://www.utility-partners.de/msbg-novelle-wird-mit-kaum-erreichbaren-zielen-fuer-2026-beschlossen/

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Delete or anonymise personal metering data (MsbG maximum periods)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-loeschfrist-messwerte-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-loeschfrist-messwerte-2026/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2026.

Metering point operators must delete or anonymise personal metering data no later than three years after the end of the year of collection, i.e. data from 2023 by the end of 2026 (Section 60(6) MsbG). Network operators keep data used for network operation, planning and forecasts and for the concession fee for at most one year after the end of the year of collection (Section 66(3) sentence 2 no. 1), suppliers likewise for energy volume forecasts (Section 69(3) sentence 2 no. 1); for data collected in 2025 this period ends on 31 December 2026. For other purposes three years apply unless a Federal Network Agency determination provides otherwise.

Source: https://www.gesetze-im-internet.de/messbg/__60.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Metering point operators: data communication for the balancing market via the gateway on request</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-34-regelenergie-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-34-regelenergie-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

From 1 January 2028 metering point operators must, on request, offer as an additional service the data communication needed to take part in the balancing market via the smart meter gateway, including the IT connection (Section 34(2) sentence 2 no. 5 MsbG). They may only refuse while the service is technically impossible or while they are exempt from it under Section 31(1) MsbG, and only with comprehensible reasons in text form (Section 34(2) sentences 3 and 5 MsbG).

Source: https://www.gesetze-im-internet.de/messbg/__34.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Metering point operators: data communication for the balancing market via the gateway on request</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-34-regelenergie-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-34-regelenergie-2028/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: From 1 January 2028 metering point operators must, on request, offer as an additional service the data communication needed to take part in the balancing market via the smart meter gateway, including the IT connection (Section 34(2) sentence 2 no. 5 MsbG). They may only refuse for technical reasons, giving reasons in text form.

From 1 January 2028 metering point operators must, on request, offer as an additional service the data communication needed to take part in the balancing market via the smart meter gateway, including the IT connection (Section 34(2) sentence 2 no. 5 MsbG). They may only refuse while the service is technically impossible or while they are exempt from it under Section 31(1) MsbG, and only with comprehensible reasons in text form (Section 34(2) sentences 3 and 5 MsbG).

Source: https://www.gesetze-im-internet.de/messbg/__34.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Modern metering devices: equip all remaining metering points by end of 2032</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-29-3-moderne-messeinrichtung-2032"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-29-3-moderne-messeinrichtung-2032/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2032.

Where no smart metering system is planned, default metering point operators equip metering points of final consumers and plant operators at least with modern metering devices, where economically justifiable, by the end of 31 December 2032; for new buildings and major renovations by completion of the building (Section 29(3) MsbG).

Source: https://www.gesetze-im-internet.de/messbg/__29.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Hydrogen meters: only devices that connect to the smart meter gateway</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-20-3-wasserstoff-zaehler-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-20-3-wasserstoff-zaehler-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

From 1 January 2028 new hydrogen meters may only be installed if they can be securely connected to a smart meter gateway (Section 20(3) with (1) MsbG).

Source: https://www.gesetze-im-internet.de/messbg/__20.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: MsbG Section 19(5): non-compliant metering systems above 100,000 kWh or 100 kW only under conditions</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-19-5-altmesssysteme-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-19-5-altmesssysteme-2029/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: From 1 January 2029, metering systems that do not meet smart metering system requirements may only be installed and used at metering points above 100,000 kWh annual consumption or at plants above 100 kW if a smart metering system installation has been announced or ordered, there are no disproportionate risks, and the connection user has consented or the BSI has issued a determination. For all other metering points this limit has applied since the end of 2025.

From 1 January 2029, metering systems that do not meet smart metering system requirements may only be installed and used at metering points above 100,000 kWh annual consumption or at plants above 100 kW if a smart metering system installation has been announced or ordered, there are no disproportionate risks, and either the connection user has consented or the installation was made on the basis of a BSI determination under the old law (version of 26 May 2023). For all other metering points this limit has applied since the end of 2025.

Source: https://www.gesetze-im-internet.de/messbg/__19.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: MiSpeL: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mispel-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/mispel-uebergang-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Until the end of September 2027 the demarcation option and the flat-rate option can be used only with the consent of the grid operator and the metering operator. Both use that period to set up metering, data delivery and billing for the two options.

Until the end of September 2027 the demarcation option and the flat-rate option can be used only with the consent of the grid operator and the metering operator; the flat-rate option also only after state aid approval for Section 19(3c) EEG. Both use that period to set up metering, data delivery and billing for the two options.

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Aufsicht/MiSpeL/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: EEG 2027 (government draft): transition payment instead of a feed-in tariff for new small systems</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-2027-kleinanlagen"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-2027-kleinanlagen/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the government draft, subject to the Bundestag&#x27;s decision and EU state aid approval: new systems no longer receive a feed-in tariff, and the market premium only starts at 25 kW. Instead the grid operator pays a temporary transition payment for at most 36 months, for systems below 50 kW commissioned in 2027, below 25 kW commissioned in 2028 and below 7 kW commissioned in 2029 or 2030. Systems below 25 kW in other direct marketing receive a 1.5 ct/kWh bonus for up to 48 months. Rooftop systems below 100 kW cap feed-in at 50 percent permanently. Systems commissioned by 31 December 2026 stay under the old rules. In the MsbG, mandatory smart meters and control devices for generation start above 2 kW, and the installation quotas in Section 45 count metering points instead of kilowatts. The Bundesrat wants to drop the 2 kW threshold; the federal government rejects that.

Under the government draft, subject to the Bundestag&#x27;s decision and EU state aid approval: new systems no longer receive a feed-in tariff, and the market premium only starts at 25 kW. Instead the grid operator pays a temporary transition payment for at most 36 months, for systems below 50 kW commissioned in 2027, below 25 kW commissioned in 2028 and below 7 kW commissioned in 2029 or 2030. Systems below 25 kW in other direct marketing receive a 1.5 ct/kWh bonus for up to 48 months. Rooftop systems below 100 kW cap feed-in at 50 percent permanently. Systems commissioned by 31 December 2026 stay under the old rules. In the MsbG, mandatory smart meters and control devices for generation start above 2 kW, and the installation quotas in Section 45 count metering points instead of kilowatts. The Bundesrat wants to drop the 2 kW threshold; the federal government rejects that (Bundestag printed paper 21/8298, no. 54).

Source: https://dserver.bundestag.de/btd/21/078/2107867.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Fallback metering operator: publication for 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#auffang-msb-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/auffang-msb-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: At the start of the calendar year the Bundesnetzagentur publishes the name, address and website of the fallback metering operator responsible for each federal state, together with the operators that declared readiness. The basis is the monitoring data under section 35 EnWG.

At the start of the calendar year the Bundesnetzagentur publishes the name, address and website of the fallback metering operator responsible under Section 11(3) sentence 1 no. 3 MsbG, i.e. the operator with the most smart metering systems nationwide, together with the operators that declared readiness under sentence 1 nos. 1 and 2. The basis is the monitoring data under section 35 EnWG.

Source: https://www.gesetze-im-internet.de/messbg/__11.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Smart meter rollout: 90 percent of total generation capacity</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#rollout-quote-erzeuger-2032"/>
    <id>tag:innobu.com,2026-11-24:fristen/rollout-quote-erzeuger-2032/pflicht/2026-10-25</id>
    <updated>2026-10-25T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: By the end of 2032 default metering point operators must have equipped metering points covering at least 90 percent of the total installed generation capacity, separately for systems up to and above 100 kilowatts. The yardstick is installed capacity, not the number of metering points.

By the end of 2032 default metering point operators must have equipped metering points covering at least 90 percent of the total installed generation capacity, separately for systems above 7 and up to 100 kilowatts and systems above 100 kilowatts. The yardstick is installed capacity, not the number of metering points.

Source: https://www.gesetze-im-internet.de/messbg/__45.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Smart meter rollout: 90 percent of new generation capacity by the end of 2030</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#rollout-quote-erzeuger-2030"/>
    <id>tag:innobu.com,2026-11-24:fristen/rollout-quote-erzeuger-2030/pflicht/2026-10-25</id>
    <updated>2026-10-25T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: By the end of 2030 default metering point operators must have equipped at least 90 percent of the generation capacity commissioned from 1 October 2028 to 30 September 2030, separately for systems up to and above 100 kilowatts. The yardstick is installed capacity, not the number of metering points.

By the end of 2030 default metering point operators must have equipped at least 90 percent of the generation capacity commissioned from 1 October 2028 to 30 September 2030, separately for systems above 7 and up to 100 kilowatts and systems above 100 kilowatts. The yardstick is installed capacity, not the number of metering points.

Source: https://www.gesetze-im-internet.de/messbg/__45.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Smart meter rollout: 90 percent of new generation capacity by the end of 2028, for the first time also above 100 kilowatts</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#rollout-quote-erzeuger-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/rollout-quote-erzeuger-2028/pflicht/2026-10-25</id>
    <updated>2026-10-25T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: By the end of 2028 default metering point operators must have equipped, for systems up to 100 kilowatts, at least 90 percent of the capacity commissioned from 1 October 2026 to 30 September 2028 and at least 50 percent of the capacity commissioned from 1 January 2018 to 25 February 2025. For systems above 100 kilowatts equipping starts in 2028 at the latest, and by the end of 2028 the equipped metering points must cover 90 percent of the capacity commissioned from 1 October 2027 to 30 September 2028.

By the end of 2028 default metering point operators must have equipped, for systems above 7 and up to 100 kilowatts, at least 90 percent of the capacity commissioned from 1 October 2026 to 30 September 2028 and at least 50 percent of the capacity commissioned from 1 January 2018 to 25 February 2025. For systems above 100 kilowatts equipping starts in 2028 at the latest, and by the end of 2028 the equipped metering points must cover 90 percent of the capacity commissioned from 1 October 2027 to 30 September 2028.

Source: https://www.gesetze-im-internet.de/messbg/__45.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Smart meter rollout: 90 percent of the installation cases since February 2025</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#rollout-quote-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/rollout-quote-2026/pflicht/2026-10-25</id>
    <updated>2026-10-25T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: By the end of 2026 default metering point operators must have completed at least 90 percent of the metering points that have fallen due since 25 February 2025. According to its press release, the Bundesnetzagentur collects progress twice a year, and it has been running supervisory proceedings against laggards since March 2026.

For final consumers in the cases of Section 30(1) nos. 2 to 5 and (2) MsbG, i.e. with annual consumption above 6,000 up to 100,000 kWh, with an agreement under Section 14a EnWG or with a control unit at the grid connection point, default metering point operators must have equipped at least 90 percent of the metering points that have fallen due since 25 February 2025 by the end of 2026 (Section 45(1) sentence 1 no. 4(b) MsbG). For final consumers above 100,000 kWh the quota only starts in 2028 (no. 3). According to its press release, the Bundesnetzagentur collects progress twice a year; its supervisory proceedings since March 2026 concern the 20 percent quota for the end of 2025 (no. 4(a)).

Source: https://www.gesetze-im-internet.de/messbg/__45.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: MaKo format release, notice no. 56</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mako-oktober-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/mako-oktober-2026/pflicht/2026-10-25</id>
    <updated>2026-10-25T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: 25 AHB and MIG versions covering 13 EDIFACT message types, AS4 profile 1.2 and the AS4 transport rules 2.6 become binding. Test plan, exception handling and fallback scenarios need to be in place.

25 AHB and MIG versions covering 13 EDIFACT message types, AS4 profile 1.2 and the AS4 transport rules 2.6 have been binding since 1 October 2026 for all market participants required to implement the market communication determinations.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK06/BK6_83_Zug_Mess/835_mitteilungen_datenformate/Mitteilung_56/Mitteilung_Nr_56.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Status changed: VDE-AR-N 4100:2026-04: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4100-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4100-uebergang-2027/status/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="status" label="Status changed"/>
    <content type="text">Status changed: planned → date open.

Source: https://www.vde-verlag.de/normen/0100932/vde-ar-n-4100-anwendungsregel-2026-04.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Smart meter rollout: 90 percent of total generation capacity</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#rollout-quote-erzeuger-2032"/>
    <id>tag:innobu.com,2026-11-24:fristen/rollout-quote-erzeuger-2032/neu/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2032.

By the end of 2032 default metering point operators must have equipped metering points covering at least 90 percent of the total installed generation capacity, separately for systems above 7 and up to 100 kilowatts and systems above 100 kilowatts. The yardstick is installed capacity, not the number of metering points.

Source: https://www.gesetze-im-internet.de/messbg/__45.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Smart meter rollout: 90 percent of new generation capacity by the end of 2030</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#rollout-quote-erzeuger-2030"/>
    <id>tag:innobu.com,2026-11-24:fristen/rollout-quote-erzeuger-2030/neu/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2030.

By the end of 2030 default metering point operators must have equipped at least 90 percent of the generation capacity commissioned from 1 October 2028 to 30 September 2030, separately for systems above 7 and up to 100 kilowatts and systems above 100 kilowatts. The yardstick is installed capacity, not the number of metering points.

Source: https://www.gesetze-im-internet.de/messbg/__45.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Smart meter rollout: 90 percent of new generation capacity by the end of 2028, for the first time also above 100 kilowatts</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#rollout-quote-erzeuger-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/rollout-quote-erzeuger-2028/neu/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2028.

By the end of 2028 default metering point operators must have equipped, for systems above 7 and up to 100 kilowatts, at least 90 percent of the capacity commissioned from 1 October 2026 to 30 September 2028 and at least 50 percent of the capacity commissioned from 1 January 2018 to 25 February 2025. For systems above 100 kilowatts equipping starts in 2028 at the latest, and by the end of 2028 the equipped metering points must cover 90 percent of the capacity commissioned from 1 October 2027 to 30 September 2028.

Source: https://www.gesetze-im-internet.de/messbg/__45.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Title changed: Smart meter rollout: 90 percent of new generation capacity from plants above 7 and up to 100 kilowatts</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#rollout-quote-erzeuger-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/rollout-quote-erzeuger-2026/titel/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="titel" label="Title changed"/>
    <content type="text">Title changed.

Before: Smart meter rollout: 90 percent of new generation capacity up to 100 kilowatts

Source: https://www.gesetze-im-internet.de/messbg/__45.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Smart meter rollout: 90 percent of new generation capacity from plants above 7 and up to 100 kilowatts</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#rollout-quote-erzeuger-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/rollout-quote-erzeuger-2026/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: By the end of 2026 default metering point operators must have equipped at least 90 percent of the generation capacity up to 100 kilowatts that came online between 25 February 2025 and 30 September 2026. The yardstick is installed capacity, not the number of metering points.

By the end of 2026 default metering point operators must have equipped at least 90 percent of the capacity of plants above 7 and up to 100 kilowatts that came online between 25 February 2025 and 30 September 2026. The yardstick is installed capacity, not the number of metering points.

Source: https://www.gesetze-im-internet.de/messbg/__45.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Smart meter rollout: 20 percent of the mandatory installation cases</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#rollout-quote-2025"/>
    <id>tag:innobu.com,2026-11-24:fristen/rollout-quote-2025/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Default metering point operators had to fit at least 20 percent of all metering points due for a smart metering system by the end of 2025. The Bundesnetzagentur opened supervisory proceedings against 434 companies that missed the quota, running since March 2026.

Default metering point operators had to fit at least 20 percent of all metering points due for a smart metering system by the end of 2025. Since March 2026 the Bundesnetzagentur has opened supervisory proceedings against 434 companies that missed the quota; 150 of them had been closed by 21 September 2026.

Source: https://www.gesetze-im-internet.de/messbg/__45.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Standard metering contracts for default metering operators</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msv-gmsb"/>
    <id>tag:innobu.com,2026-11-24:fristen/msv-gmsb/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: BK6-24-125: MSB-RV, MSV-AN and MSV-LF are binding for default metering point operators.

BK6-24-125: Since 1 July 2026 default metering point operators conclude metering contracts only on the MSV-AN and MSV-LF templates, adapt existing metering contracts to them and publish them for conclusion in text form. Electricity network operators and all metering point operators conclude the framework contract (MSB-RV) in its amended version and adapt existing contracts.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK06/BK6_83_Zug_Mess/846_messstellenvertrag/Messstellenvertrag_node.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Default metering point operators: publish services and price sheets by 31 October</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-37-veroeffentlichung-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-37-veroeffentlichung-2026/neu/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 October 2026.

Every year by 31 October, default metering point operators publish the scope of their installation duties under Section 29 MsbG, their standard and possible additional services, and price sheets with expected annual prices for at least three years (Section 37(1) MsbG). Prices for additional services must be reviewed at least every two years.

Source: https://www.gesetze-im-internet.de/messbg/__37.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: MsbG Section 3(3a): requested meter changes within one month</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-3-3a-aenderungsfrist"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-3-3a-aenderungsfrist/neu/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 27 May 2023.

If a connection owner or user requests a change or addition to the meter in the low-voltage grid, for instance for a cascade connection, the metering point operator carries it out within one month of receiving the order. After six weeks the connection owner may have the work done by a qualified third party at its own cost.

Source: https://www.gesetze-im-internet.de/messbg/__3.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Gas: new metering point operator framework contract</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msb-rahmenvertrag-gas-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/msb-rahmenvertrag-gas-2026/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Gas network operators and metering point operators had to draw up a new metering point operator framework contract by 1 October 2026. The previous ruling BK7-17-026 was revoked on the same day.

Since 1 October 2026 the new gas metering point operator framework contract applies; ruling BK7-17-026 was revoked on the same day. Gas network operators and all metering point operators conclude the contract in its current version and adapt existing contracts, and gas network operators publish it (BK7-24-01-009, operative items 13 to 15).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0009/Anlagen/BK7-24-01-0009_Beschluss_DL_BF.pdf?__blob=publicationFile&amp;v=4

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Title changed: 24-hour supplier switch: statutory duty since 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#lfw24-vollpflicht"/>
    <id>tag:innobu.com,2026-11-24:fristen/lfw24-vollpflicht/titel/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="titel" label="Title changed"/>
    <content type="text">Title changed.

Before: 24-hour supplier switch: full obligation, electricity

Source: https://www.gesetze-im-internet.de/enwg_2005/__20a.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: 24-hour supplier switch: statutory duty since 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#lfw24-vollpflicht"/>
    <id>tag:innobu.com,2026-11-24:fristen/lfw24-vollpflicht/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Star-shaped switch process via the MaLo ID; extension to gas and hydrogen still open.

Since 1 January 2026 the technical supplier switch must be completed within 24 hours and be possible on every working day (Section 20a(2) sentence 4 EnWG); under Section 3 no. 31 EnWG energy includes gas and hydrogen. So far the Federal Network Agency has set the processes only for electricity (star-shaped switch via the MaLo ID, BK6-22-024); it did not change the gas switching processes in BK7-24-01-009.

Source: https://www.gesetze-im-internet.de/enwg_2005/__20a.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG: control via the smart meter gateway from 2028</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-smgw-steuerung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-smgw-steuerung-2028/neu/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

From 1 January 2028, and once a smart metering system is installed, plants above 25 kW in direct marketing must be readable and remotely controllable via the smart meter gateway (Section 10b(2) EEG). From 2028, after a smart metering system and control device have been installed, grid operators pay the plant operator EUR 100 gross for each year begun until the controllability test has succeeded (Section 9(2a) EEG).

Source: https://www.gesetze-im-internet.de/eeg_2014/__10b.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Title changed: EEG 2027 (government draft): transition payment instead of a feed-in tariff for new small systems</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-2027-kleinanlagen"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-2027-kleinanlagen/titel/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="titel" label="Title changed"/>
    <content type="text">Title changed.

Before: EEG 2027 (government draft): no fixed tariff for new PV below 25 kW

Source: https://dserver.bundestag.de/btd/21/078/2107867.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: EEG 2027 (government draft): transition payment instead of a feed-in tariff for new small systems</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-2027-kleinanlagen"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-2027-kleinanlagen/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the government draft, subject to the Bundestag&#x27;s decision and EU state aid approval: new PV systems below 25 kW receive a temporary transition payment from the grid operator for at most 36 months instead of the feed-in tariff, then direct marketing with a 1.5 ct/kWh bonus for up to 48 months. Rooftop systems below 100 kW cap feed-in at 50 percent permanently. Systems commissioned by 31 December 2026 stay under the old rules. In the MsbG, mandatory smart meters and control devices for generation start above 2 kW, and the installation quotas in Section 45 count metering points instead of kilowatts. The Bundesrat wants to drop the 2 kW threshold; the federal government rejects that.

Under the government draft, subject to the Bundestag&#x27;s decision and EU state aid approval: new systems no longer receive a feed-in tariff, and the market premium only starts at 25 kW. Instead the grid operator pays a temporary transition payment for at most 36 months, for systems below 50 kW commissioned in 2027, below 25 kW commissioned in 2028 and below 7 kW commissioned in 2029 or 2030. Systems below 25 kW in other direct marketing receive a 1.5 ct/kWh bonus for up to 48 months. Rooftop systems below 100 kW cap feed-in at 50 percent permanently. Systems commissioned by 31 December 2026 stay under the old rules. In the MsbG, mandatory smart meters and control devices for generation start above 2 kW, and the installation quotas in Section 45 count metering points instead of kilowatts. The Bundesrat wants to drop the 2 kW threshold; the federal government rejects that (Bundestag printed paper 21/8298, no. 54).

Source: https://dserver.bundestag.de/btd/21/078/2107867.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Status changed: VDE-AR-N 4100:2026-04: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4100-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4100-uebergang-2027/status/2026-10-18</id>
    <updated>2026-10-18T00:00:00Z</updated>
    <category term="status" label="Status changed"/>
    <content type="text">Status changed: fixed → planned.

Source: https://www.vde-verlag.de/normen/0100932/vde-ar-n-4100-anwendungsregel-2026-04.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Controllability: TSOs&#x27; overall report under Section 12(2c) EnWG</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#steuerbarkeit-gesamtbericht-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/steuerbarkeit-gesamtbericht-2026/neu/2026-10-18</id>
    <updated>2026-10-18T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 November 2026.

The transmission system operators submit the overall report on network operators&#x27; controllability tests and on the equipment status reported by default metering operators to the Federal Network Agency and the Federal Ministry for Economic Affairs by 30 November. Under the TSOs&#x27; guidelines the checked results must reach them by 31 October; tests and reports run until 30 September.

Source: https://www.gesetze-im-internet.de/enwg_2005/__12.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Coalition committee: smart meter rollout above 90 percent of all relevant metering points by end of 2030</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#smart-meter-zielmarke-2030"/>
    <id>tag:innobu.com,2026-11-24:fristen/smart-meter-zielmarke-2030/neu/2026-10-18</id>
    <updated>2026-10-18T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2030.

The coalition committee wants the rollout for all relevant metering points more than 90 percent complete by the end of 2030, two years ahead of the current MsbG target year 2032. A low-cost &quot;Smart Meter Light&quot; is planned for customers outside the mandatory rollout. No draft bill has been published yet.

Source: https://www.bundesregierung.de/resource/blob/2196306/2445592/bc8e5e160d879f0bdd593121a96a45d2/2026-07-02-koaausschuss-data.pdf?download=1

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: MsbG Section 19(5): non-compliant metering systems above 100,000 kWh or 100 kW only under conditions</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-19-5-altmesssysteme-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-19-5-altmesssysteme-2029/neu/2026-10-18</id>
    <updated>2026-10-18T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2029.

From 1 January 2029, metering systems that do not meet smart metering system requirements may only be installed and used at metering points above 100,000 kWh annual consumption or at plants above 100 kW if a smart metering system installation has been announced or ordered, there are no disproportionate risks, and either the connection user has consented or the installation was made on the basis of a BSI determination under the old law (version of 26 May 2023). For all other metering points this limit has applied since the end of 2025.

Source: https://www.gesetze-im-internet.de/messbg/__19.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EU proposal: smart metering systems for 50 percent of all final customers (Article 18b Regulation (EU) 2019/943)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eu-imsys-quote-50-2031"/>
    <id>tag:innobu.com,2026-11-24:fristen/eu-imsys-quote-50-2031/neu/2026-10-18</id>
    <updated>2026-10-18T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2031.

Under Commission proposal COM(2026) 600, smart metering systems would have to cover at least 50 percent of all final customers, with 75 percent as the next step. Member states below 30 percent when the regulation enters into force get until 31 December 2031 and 31 December 2034; Germany stood at 5.9 percent on 30 June 2026. The cost-benefit analysis would only apply to rollout beyond 75 percent. Nothing has been adopted yet.

Source: https://dserver.bundestag.de/brd/2026/0501-26.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: BSI TR-03109-6 v2.0 for gateway administrators</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#tr-03109-6-v2"/>
    <id>tag:innobu.com,2026-11-24:fristen/tr-03109-6-v2/pflicht/2026-10-14</id>
    <updated>2026-10-14T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: New and re-certification under v2.0 with ISMS and pentest requirements; v1.0 runs in parallel until end of 2028.

Gateway administrators have their GWA system assessed against version 2.0 at the next certification or recertification from 1 January 2027. Version 2.0 covers remote workplaces, cloud service providers, zero trust, time servers and penetration tests, among other things. Version 1.0 stays valid until 31 December 2028.

Source: https://www.bsi.bund.de/DE/Themen/Unternehmen-und-Organisationen/Standards-und-Zertifizierung/Smart-metering/Administration-und-Betrieb/TechnRichtlinie/TR_03109-6.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: BSI TR-03109-1 v2.0: gateway certificates only with MUSS+</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#smgw-tr-03109-1-v2-muss-plus-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/smgw-tr-03109-1-v2-muss-plus-2027/neu/2026-10-14</id>
    <updated>2026-10-14T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.

Source: https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/Schutzprofile/Uebergangsregelung-PP-0073_und_TR-03109-1.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Smart meter gateways: installation only to version 2.0 of protection profile and TR-03109-1</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#smgw-einbau-neuer-stand-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/smgw-einbau-neuer-stand-2028/neu/2026-10-14</id>
    <updated>2026-10-14T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

Under the BSI transition rules, gateways certified to protection profile PP-0073 version 1.3 and TR-03109-1 version 1.1 may only be installed until 31 December 2027, and recertification to that standard can be requested until that date at the latest. After that, version 2.0 applies to newly installed gateways. Devices already in the field can move to the new standard by software update.

Source: https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/Schutzprofile/Uebergangsregelung-PP-0073_und_TR-03109-1.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>