  <title>innobu deadline calendar: new and changed (Competitive metering point operator)</title>
  <subtitle>Every change to the energy transition deadline calendar: deadlines added, dates moved, status changes, corrected obligations and legal consequences, with dates.</subtitle>
  <link rel="self" type="application/atom+xml" href="https://www.innobu.com/assets/feeds/fristen-aenderungen-en-wmsb.xml"/>
  <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-changes.html"/>
  <id>https://www.innobu.com/assets/feeds/fristen-aenderungen-en-wmsb.xml</id>
  <updated>2026-11-24T00:00:00Z</updated>
  <author><name>innobu GmbH</name><uri>https://www.innobu.com/</uri></author>
  <rights>A classification for typical market roles, not a review of your individual case and not legal advice. Whether an obligation applies to your company (thresholds, exemptions) is for your legal department or counsel to confirm. The calendar doesn&#x27;t replace your own deadline review.</rights>
  <entry>
    <title>Added: Market master data register: register a new market role</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-marktakteur-registrierung"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastr-marktakteur-registrierung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 1 month after.

Market actors register for each market function within one month of first acting in it; network operators without undue delay after their licence is notified (Section 3(2) MaStRV).

Source: https://www.gesetze-im-internet.de/mastrv/__3.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: BSI TR-03109-1 v2.0: gateway certificates only with MUSS+</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#smgw-tr-03109-1-v2-muss-plus-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/smgw-tr-03109-1-v2-muss-plus-2027/pflicht/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician, plus TAF 8 in its new form and TAF 15. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.

Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.

Source: https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/Schutzprofile/Uebergangsregelung-PP-0073_und_TR-03109-1.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Status changed: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/status/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="status" label="Status changed"/>
    <content type="text">Status changed: date open → fixed.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The 2026-03 edition replaces the 2018-11 edition. The end of the transition period on 1 March 2027 does not come from the standards body; according to VDE FNN, certificates under the 2018-11 edition remain sufficient until one of two periods expires: 12 months after DIN VDE V 0124-100 takes effect or 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.

The 2026-03 edition replaces the 2018-11 edition. According to VDE FNN, the transition period of VDE-AR-N 4105 ends on 1 March 2027; after that, unit certificates under the 2026 edition are required in principle. Because the revised DIN VDE V 0124-100 is not expected to be available by then, VDE FNN accepts unit certificates under the 2018-11 edition until the end of the transition period under Section 9.2: up to 12 months after the revised DIN VDE V 0124-100 takes effect, and at the latest up to 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Civil-law consequence → Fine possible.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The 2026-03 edition replaces the 2018-11 edition. The end of the transition period on 1 March 2027 does not come from the standards body; according to VDE FNN, certificates under the 2018-11 edition remain sufficient for up to 24 months after the rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.

The 2026-03 edition replaces the 2018-11 edition. According to VDE FNN, the transition period of VDE-AR-N 4105 ends on 1 March 2027; after that, unit certificates under the 2026 edition are required in principle. Because the revised DIN VDE V 0124-100 is not expected to be available by then, VDE FNN accepts unit certificates under the 2018-11 edition until the end of the transition period under Section 9.2: up to 12 months after the revised DIN VDE V 0124-100 takes effect, and at the latest up to 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: BSI TR-03109-1 v2.0: gateway certificates only with MUSS+</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#smgw-tr-03109-1-v2-muss-plus-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/smgw-tr-03109-1-v2-muss-plus-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician, plus TAF 8 in its new form and TAF 15. By mid-October 2026 no gateway had been certified under version 2.0.

Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.

Source: https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/Schutzprofile/Uebergangsregelung-PP-0073_und_TR-03109-1.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Standard metering contracts for default metering operators</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msv-gmsb"/>
    <id>tag:innobu.com,2026-11-24:fristen/msv-gmsb/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: BK6-24-125: Since 1 July 2026 default metering point operators conclude metering contracts only on the MSV-AN and MSV-LF templates and publish them for conclusion in text form. Electricity network operators and all metering point operators conclude the framework contract (MSB-RV) in its amended version and adapt existing contracts.

BK6-24-125: Since 1 July 2026 default metering point operators conclude metering contracts only on the MSV-AN and MSV-LF templates, adapt existing metering contracts to them and publish them for conclusion in text form. Electricity network operators and all metering point operators conclude the framework contract (MSB-RV) in its amended version and adapt existing contracts.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK06/BK6_83_Zug_Mess/846_messstellenvertrag/Messstellenvertrag_node.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Delete or anonymise personal metering data (MsbG maximum periods)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-loeschfrist-messwerte-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-loeschfrist-messwerte-2026/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2026.

Metering point operators must delete or anonymise personal metering data no later than three years after the end of the year of collection, i.e. data from 2023 by the end of 2026 (Section 60(6) MsbG). Network operators keep data used for network operation, planning and forecasts and for the concession fee for at most one year after the end of the year of collection (Section 66(3) sentence 2 no. 1), suppliers likewise for energy volume forecasts (Section 69(3) sentence 2 no. 1); for data collected in 2025 this period ends on 31 December 2026. For other purposes three years apply unless a Federal Network Agency determination provides otherwise.

Source: https://www.gesetze-im-internet.de/messbg/__60.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Metering point operators: data communication for the balancing market via the gateway on request</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-34-regelenergie-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-34-regelenergie-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

From 1 January 2028 metering point operators must, on request, offer as an additional service the data communication needed to take part in the balancing market via the smart meter gateway, including the IT connection (Section 34(2) sentence 2 no. 5 MsbG). They may only refuse while the service is technically impossible or while they are exempt from it under Section 31(1) MsbG, and only with comprehensible reasons in text form (Section 34(2) sentences 3 and 5 MsbG).

Source: https://www.gesetze-im-internet.de/messbg/__34.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Metering point operators: data communication for the balancing market via the gateway on request</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-34-regelenergie-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-34-regelenergie-2028/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: From 1 January 2028 metering point operators must, on request, offer as an additional service the data communication needed to take part in the balancing market via the smart meter gateway, including the IT connection (Section 34(2) sentence 2 no. 5 MsbG). They may only refuse for technical reasons, giving reasons in text form.

From 1 January 2028 metering point operators must, on request, offer as an additional service the data communication needed to take part in the balancing market via the smart meter gateway, including the IT connection (Section 34(2) sentence 2 no. 5 MsbG). They may only refuse while the service is technically impossible or while they are exempt from it under Section 31(1) MsbG, and only with comprehensible reasons in text form (Section 34(2) sentences 3 and 5 MsbG).

Source: https://www.gesetze-im-internet.de/messbg/__34.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Hydrogen meters: only devices that connect to the smart meter gateway</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-20-3-wasserstoff-zaehler-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-20-3-wasserstoff-zaehler-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

From 1 January 2028 new hydrogen meters may only be installed if they can be securely connected to a smart meter gateway (Section 20(3) with (1) MsbG).

Source: https://www.gesetze-im-internet.de/messbg/__20.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: MsbG Section 19(5): non-compliant metering systems above 100,000 kWh or 100 kW only under conditions</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-19-5-altmesssysteme-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-19-5-altmesssysteme-2029/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: From 1 January 2029, metering systems that do not meet smart metering system requirements may only be installed and used at metering points above 100,000 kWh annual consumption or at plants above 100 kW if a smart metering system installation has been announced or ordered, there are no disproportionate risks, and the connection user has consented or the BSI has issued a determination. For all other metering points this limit has applied since the end of 2025.

From 1 January 2029, metering systems that do not meet smart metering system requirements may only be installed and used at metering points above 100,000 kWh annual consumption or at plants above 100 kW if a smart metering system installation has been announced or ordered, there are no disproportionate risks, and either the connection user has consented or the installation was made on the basis of a BSI determination under the old law (version of 26 May 2023). For all other metering points this limit has applied since the end of 2025.

Source: https://www.gesetze-im-internet.de/messbg/__19.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: From this date only the 2026-03 edition applies to connecting generation plants to the low-voltage grid. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW have to be switched over by then.

The 2026-03 edition replaces the 2018-11 edition. According to VDE FNN, the transition period of VDE-AR-N 4105 ends on 1 March 2027; after that, unit certificates under the 2026 edition are required in principle. Because the revised DIN VDE V 0124-100 is not expected to be available by then, VDE FNN accepts unit certificates under the 2018-11 edition until the end of the transition period under Section 9.2: up to 12 months after the revised DIN VDE V 0124-100 takes effect, and at the latest up to 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Standard metering contracts for default metering operators</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msv-gmsb"/>
    <id>tag:innobu.com,2026-11-24:fristen/msv-gmsb/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: BK6-24-125: MSB-RV, MSV-AN and MSV-LF are binding for default metering point operators.

BK6-24-125: Since 1 July 2026 default metering point operators conclude metering contracts only on the MSV-AN and MSV-LF templates, adapt existing metering contracts to them and publish them for conclusion in text form. Electricity network operators and all metering point operators conclude the framework contract (MSB-RV) in its amended version and adapt existing contracts.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK06/BK6_83_Zug_Mess/846_messstellenvertrag/Messstellenvertrag_node.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: MsbG Section 3(3a): requested meter changes within one month</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-3-3a-aenderungsfrist"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-3-3a-aenderungsfrist/neu/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 27 May 2023.

If a connection owner or user requests a change or addition to the meter in the low-voltage grid, for instance for a cascade connection, the metering point operator carries it out within one month of receiving the order. After six weeks the connection owner may have the work done by a qualified third party at its own cost.

Source: https://www.gesetze-im-internet.de/messbg/__3.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Gas: new metering point operator framework contract</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msb-rahmenvertrag-gas-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/msb-rahmenvertrag-gas-2026/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Gas network operators and metering point operators had to draw up a new metering point operator framework contract by 1 October 2026. The previous ruling BK7-17-026 was revoked on the same day.

Since 1 October 2026 the new gas metering point operator framework contract applies; ruling BK7-17-026 was revoked on the same day. Gas network operators and all metering point operators conclude the contract in its current version and adapt existing contracts, and gas network operators publish it (BK7-24-01-009, operative items 13 to 15).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0009/Anlagen/BK7-24-01-0009_Beschluss_DL_BF.pdf?__blob=publicationFile&amp;v=4

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Status changed: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/status/2026-10-18</id>
    <updated>2026-10-18T00:00:00Z</updated>
    <category term="status" label="Status changed"/>
    <content type="text">Status changed: fixed → date open.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: MsbG Section 19(5): non-compliant metering systems above 100,000 kWh or 100 kW only under conditions</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-19-5-altmesssysteme-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-19-5-altmesssysteme-2029/neu/2026-10-18</id>
    <updated>2026-10-18T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2029.

From 1 January 2029, metering systems that do not meet smart metering system requirements may only be installed and used at metering points above 100,000 kWh annual consumption or at plants above 100 kW if a smart metering system installation has been announced or ordered, there are no disproportionate risks, and either the connection user has consented or the installation was made on the basis of a BSI determination under the old law (version of 26 May 2023). For all other metering points this limit has applied since the end of 2025.

Source: https://www.gesetze-im-internet.de/messbg/__19.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: BSI TR-03109-6 v2.0 for gateway administrators</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#tr-03109-6-v2"/>
    <id>tag:innobu.com,2026-11-24:fristen/tr-03109-6-v2/pflicht/2026-10-14</id>
    <updated>2026-10-14T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: New and re-certification under v2.0 with ISMS and pentest requirements; v1.0 runs in parallel until end of 2028.

Gateway administrators have their GWA system assessed against version 2.0 at the next certification or recertification from 1 January 2027. Version 2.0 covers remote workplaces, cloud service providers, zero trust, time servers and penetration tests, among other things. Version 1.0 stays valid until 31 December 2028.

Source: https://www.bsi.bund.de/DE/Themen/Unternehmen-und-Organisationen/Standards-und-Zertifizierung/Smart-metering/Administration-und-Betrieb/TechnRichtlinie/TR_03109-6.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: BSI TR-03109-1 v2.0: gateway certificates only with MUSS+</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#smgw-tr-03109-1-v2-muss-plus-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/smgw-tr-03109-1-v2-muss-plus-2027/neu/2026-10-14</id>
    <updated>2026-10-14T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.

Source: https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/Schutzprofile/Uebergangsregelung-PP-0073_und_TR-03109-1.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Smart meter gateways: installation only to version 2.0 of protection profile and TR-03109-1</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#smgw-einbau-neuer-stand-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/smgw-einbau-neuer-stand-2028/neu/2026-10-14</id>
    <updated>2026-10-14T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

Under the BSI transition rules, gateways certified to protection profile PP-0073 version 1.3 and TR-03109-1 version 1.1 may only be installed until 31 December 2027, and recertification to that standard can be requested until that date at the latest. After that, version 2.0 applies to newly installed gateways. Devices already in the field can move to the new standard by software update.

Source: https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/Schutzprofile/Uebergangsregelung-PP-0073_und_TR-03109-1.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Gas: new metering point operator framework contract</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msb-rahmenvertrag-gas-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/msb-rahmenvertrag-gas-2026/neu/2026-10-11</id>
    <updated>2026-10-11T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 October 2026.

Since 1 October 2026 the new gas metering point operator framework contract applies; ruling BK7-17-026 was revoked on the same day. Gas network operators and all metering point operators conclude the contract in its current version and adapt existing contracts, and gas network operators publish it (BK7-24-01-009, operative items 13 to 15).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0009/Anlagen/BK7-24-01-0009_Beschluss_DL_BF.pdf?__blob=publicationFile&amp;v=4

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/neu/2026-09-30</id>
    <updated>2026-09-30T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 March 2027.

The 2026-03 edition replaces the 2018-11 edition. According to VDE FNN, the transition period of VDE-AR-N 4105 ends on 1 March 2027; after that, unit certificates under the 2026 edition are required in principle. Because the revised DIN VDE V 0124-100 is not expected to be available by then, VDE FNN accepts unit certificates under the 2018-11 edition until the end of the transition period under Section 9.2: up to 12 months after the revised DIN VDE V 0124-100 takes effect, and at the latest up to 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Metering Act Section 40: new gas meters with load profile metering on the smart meter gateway</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-gas-rlm-gateway-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-gas-rlm-gateway-2028/neu/2026-09-28</id>
    <updated>2026-09-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 July 2028.

New gas meters with interval (load profile) metering must be connected to existing smart meter gateways from 1 July 2028 at the latest. Other new gas meters follow once connection is technically possible and causes no extra cost.

Source: https://www.gesetze-im-internet.de/messbg/__40.html