  <title>innobu deadline calendar: new and changed (Balance responsible party)</title>
  <subtitle>Every change to the energy transition deadline calendar: deadlines added, dates moved, status changes, corrected obligations and legal consequences, with dates.</subtitle>
  <link rel="self" type="application/atom+xml" href="https://www.innobu.com/assets/feeds/fristen-aenderungen-en-bkv.xml"/>
  <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-changes.html"/>
  <id>https://www.innobu.com/assets/feeds/fristen-aenderungen-en-bkv.xml</id>
  <updated>2026-11-24T00:00:00Z</updated>
  <author><name>innobu GmbH</name><uri>https://www.innobu.com/</uri></author>
  <rights>A classification for typical market roles, not a review of your individual case and not legal advice. Whether an obligation applies to your company (thresholds, exemptions) is for your legal department or counsel to confirm. The calendar doesn&#x27;t replace your own deadline review.</rights>
  <entry>
    <title>Added: Market master data register: register a new market role</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-marktakteur-registrierung"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastr-marktakteur-registrierung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 1 month after.

Market actors register for each market function within one month of first acting in it; network operators without undue delay after their licence is notified (Section 3(2) MaStRV).

Source: https://www.gesetze-im-internet.de/mastrv/__3.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Gas reserve (government draft): levy on balancing group managers from 1 October 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-35m-gasreserve-umlage-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-35m-gasreserve-umlage-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 October 2027.

Under the government draft, subject to the Bundestag&#x27;s decision: from the first levy period starting on 1 October 2027, the market area manager passes the costs of the gas reserve on to balancing group managers, per megawatt hour withdrawn at points with interval metering and with standard load profiles. It sets the levy anew for each yearly period starting on 1 October, bills monthly, may charge instalments and publishes the levy six weeks before each levy period starts; in basic gas supply the levy becomes a price component.

Source: https://dserver.bundestag.de/brd/2026/0652-26.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: KONNI 2.1: second consultation on a conversion fee from L-gas to H-gas closes</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk7-konni-21-konsultation-2026-11"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk7-konni-21-konsultation-2026-11/neu/2026-11-04</id>
    <updated>2026-11-04T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 23 November 2026.

Ruling Chamber 7 is consulting on a draft operative part and the amended standard conversion contract for the THE market area: from 1 April 2027 the market area manager would be allowed to charge balancing group managers a conversion fee in both directions, including from L-gas to H-gas, with seasonal factors and a cap of EUR 0.45/MWh for the short period to 30 September 2027. Comments are due by 23 November 2026.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2026/BK7-26-0006/BK7-26-01-0006_2_Konsultation.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: WasABi: balancing rules for hydrogen apply, data platform from July 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasabi-bilanzierung-wasserstoff-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasabi-bilanzierung-wasserstoff-2028/pflicht/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The hydrogen market area manager and the hydrogen network operators apply the WasABi balancing rules from 1 January 2028 (BK7-24-01-014, operative point 10). They set up the data exchange platform by 1 July 2027 and test it with market participants until 1 January 2028 (operative point 7(d)).

The hydrogen market area manager and the hydrogen network operators apply the WasABi balancing rules from 1 January 2028 (BK7-24-01-014, operative point 10). The market area manager sets up the data exchange platform by 1 July 2027 and tests it with market participants until 1 January 2028 (operative point 7(d)); the hydrogen network operators supply it with the data it needs.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0014/Anlagen/BK7-24-01-0014_Beschluss_Download_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Rules for secure data exchange in the scheduling process v2.4 become binding</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#fahrplanprozess-sicherer-austausch-v24-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/fahrplanprozess-sicherer-austausch-v24-2027/neu/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 October 2027.

From 1 October 2027 version 2.4 of the rules for secure data exchange in the scheduling process applies to all market participants required to implement it (Notice no. 17 on BK6-18-061).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2018/BK6-18-061/Mitteilungen/Mitteilung_Nr_17/Mitteilung_17.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: WasABi: set up the hydrogen data exchange platform</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasabi-datenaustauschplattform-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasabi-datenaustauschplattform-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 July 2027.

For hydrogen balancing under WasABi, the data exchange platform must be set up by 1 July 2027 and tested with market participants in an introduction phase until 1 January 2028; the IT interface specifications are announced to market participants beforehand (BK7-24-01-014, operative point 7(d)).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0014/Anlagen/BK7-24-01-0014_Beschluss_Download_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: WasABi: set up the hydrogen data exchange platform</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasabi-datenaustauschplattform-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasabi-datenaustauschplattform-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: For hydrogen balancing under WasABi, the data exchange platform must be set up by 1 July 2027 and tested with market participants in an introduction phase until 1 January 2028; the IT interface specifications are announced to market participants beforehand (BK7-24-01-0014, operative point 7(d)).

For hydrogen balancing under WasABi, the data exchange platform must be set up by 1 July 2027 and tested with market participants in an introduction phase until 1 January 2028; the IT interface specifications are announced to market participants beforehand (BK7-24-01-014, operative point 7(d)).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0014/Anlagen/BK7-24-01-0014_Beschluss_Download_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: WasABi: balancing rules for hydrogen apply, data platform from July 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasabi-bilanzierung-wasserstoff-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasabi-bilanzierung-wasserstoff-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

The hydrogen market area manager and the hydrogen network operators apply the WasABi balancing rules from 1 January 2028 (BK7-24-01-014, operative point 10). The market area manager sets up the data exchange platform by 1 July 2027 and tests it with market participants until 1 January 2028 (operative point 7(d)); the hydrogen network operators supply it with the data it needs.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0014/Anlagen/BK7-24-01-0014_Beschluss_Download_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: WasABi: balancing rules for hydrogen apply, data platform from July 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasabi-bilanzierung-wasserstoff-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasabi-bilanzierung-wasserstoff-2028/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The hydrogen market area manager and the hydrogen network operators apply the WasABi balancing rules from 1 January 2028 (BK7-24-01-0014, operative point 10). They set up the data exchange platform by 1 July 2027 and test it with market participants until 1 January 2028 (operative point 7(d)).

The hydrogen market area manager and the hydrogen network operators apply the WasABi balancing rules from 1 January 2028 (BK7-24-01-014, operative point 10). The market area manager sets up the data exchange platform by 1 July 2027 and tests it with market participants until 1 January 2028 (operative point 7(d)); the hydrogen network operators supply it with the data it needs.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0014/Anlagen/BK7-24-01-0014_Beschluss_Download_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: WaKandA: hydrogen network access rules and joint booking platform</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wakanda-kapazitaetsplattform-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/wakanda-kapazitaetsplattform-2028/neu/2026-10-25</id>
    <updated>2026-10-25T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

Operators of regulated hydrogen networks apply the WaKandA network access rules from 1 January 2028 and allocate entry and exit capacity through a joint capacity booking platform. Existing entry and exit contracts are adapted by then.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0015/Anlagen/BK7-24-01-0015_Beschluss_Download_BF.pdf?__blob=publicationFile&amp;v=3

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Redispatch 2.0: choice of settlement method for 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#redispatch-abrechnungsvariante-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/redispatch-abrechnungsvariante-2027/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under ruling BK6-23-241, the plant operator sets the settlement method for each technical resource by 30 November for the following year. Without a decision the simplified peak settlement applies; the flat-rate settlement ends for existing resources at the end of 2028.

Under BK6-23-241 (BilAReM section 3.2.1), operators of wind and solar plants from 100 kW set the settlement method for each technical resource by 30 November for the following year. Without a decision the simplified peak settlement applies; the flat-rate settlement ends for existing resources at the end of 2028 unless feed-in is not metered quarter-hourly.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2023/BK6-23-241/BK6-23-241_beschluss.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Schedule nomination process description v4.7 becomes binding</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#fahrplananmeldung-v47-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/fahrplananmeldung-v47-2027/neu/2026-10-11</id>
    <updated>2026-10-11T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 April 2027.

From 1 April 2027 version 4.7 of the schedule nomination process description applies to all market participants required to implement it. The changes relate to European market coupling.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2018/BK6-18-061/Mitteilungen/Mitteilung_Nr_17/Mitteilung_17.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Secure exchange rules for scheduling v2.4 become binding</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#fahrplan-sicherheit-v24-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/fahrplan-sicherheit-v24-2027/neu/2026-10-11</id>
    <updated>2026-10-11T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 October 2027.

From 1 October 2027 version 2.4 of the rules for secure exchange in scheduling applies to all market participants required to implement it. It covers transmission channels and certificates for schedule exchange.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2018/BK6-18-061/Mitteilungen/Mitteilung_Nr_17/Mitteilung_17.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: REMIT II: new reporting formats and first exposure report</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#remit-meldungen-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/remit-meldungen-2027/neu/2026-09-28</id>
    <updated>2026-09-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 29 October 2027.

From 29 October 2027 the new data fields apply to continuous transaction reporting to ACER. Market participants with positions of 600 GWh per year or more report exposures quarterly, first in October 2027; balancing service transactions must be reported monthly from 29 April 2028.

Source: https://eur-lex.europa.eu/eli/reg_impl/2026/256/oj

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Redispatch 2.0: choice of settlement method for 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#redispatch-abrechnungsvariante-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/redispatch-abrechnungsvariante-2027/neu/2026-09-28</id>
    <updated>2026-09-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 November 2026.

Under BK6-23-241 (BilAReM section 3.2.1), operators of wind and solar plants from 100 kW set the settlement method for each technical resource by 30 November for the following year. Without a decision the simplified peak settlement applies; the flat-rate settlement ends for existing resources at the end of 2028 unless feed-in is not metered quarter-hourly.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2023/BK6-23-241/BK6-23-241_beschluss.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>