<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
  <title>innobu deadline calendar: new and changed (Transmission system operator)</title>
  <subtitle>Every change to the energy transition deadline calendar: deadlines added, dates moved, status changes, corrected obligations and legal consequences, with dates.</subtitle>
  <link rel="self" type="application/atom+xml" href="https://www.innobu.com/assets/feeds/fristen-aenderungen-en-uenb.xml"/>
  <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-changes.html"/>
  <id>https://www.innobu.com/assets/feeds/fristen-aenderungen-en-uenb.xml</id>
  <updated>2026-11-24T00:00:00Z</updated>
  <author><name>innobu GmbH</name><uri>https://www.innobu.com/</uri></author>
  <rights>A classification for typical market roles, not a review of your individual case and not legal advice. Whether an obligation applies to your company (thresholds, exemptions) is for your legal department or counsel to confirm. The calendar doesn&#x27;t replace your own deadline review.</rights>
  <entry>
    <title>Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat has until 4 December 2026 for its second reading. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Source: https://dserver.bundestag.de/btd/21/082/2108236.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Significant security incident: 24 hours, 72 hours, one month</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#sicherheitsvorfall-meldung-energienetz"/>
    <id>tag:innobu.com,2026-11-24:fristen/sicherheitsvorfall-meldung-energienetz/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 24 hours after; within 72 hours after; within 1 month after.

Operators of energy supply networks, energy installations and digital energy services under Section 5c(1) sentence 1 nos. 1 to 3 EnWG report a significant security incident to the reporting office under Section 32 BSIG as an early warning at the latest 24 hours after becoming aware of it, with an initial assessment at the latest 72 hours after becoming aware of it, and with a final report at the latest one month after that notification, or a progress report if the incident is still ongoing (Section 5d(3) EnWG, Section 32(2) BSIG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__5d.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the government bill, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d draft EnWG) that lowers transmission network charges; the Bundesrat calls for EUR 6.5 billion, so the amount is open. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) draft EnWG).

Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Source: https://dserver.bundestag.de/btd/21/082/2108236.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Regional scenario of the planning region for the 2028 network expansion plan</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-14d-regionalszenario-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-14d-regionalszenario-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2027.

The distribution system operators of a planning region finalise their joint regional scenario, involving the transmission system operators, at least ten months before the network expansion plan is due and submit it to the Federal Network Agency. For the plan due on 31 October 2028 that means 31 December 2027.

Source: https://www.gesetze-im-internet.de/enwg_2005/__14d.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Congestion income 2027: report the planned use to the Federal Network Agency</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#engpasserloese-verwendung-plan-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/engpasserloese-verwendung-plan-2027/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Transmission system operators tell the Federal Network Agency by 31 October how they plan to use the 2027 congestion income from allocating cross-zonal capacity. The basis is Article 4 of the ACER methodology on the use of congestion income under Article 19 of Regulation (EU) 2019/943.

Transmission system operators had to tell the Federal Network Agency by 31 October 2026 how they planned to use the 2027 congestion income from allocating cross-zonal capacity. The basis is Article 4 of the ACER methodology on the use of congestion income under Article 19 of Regulation (EU) 2019/943.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK08/BK8_04_InfoRundschr/41_Rundschr/Downloads/Fristenkalender_Netzbetreiber_Netzentgelte_Elektrizitaet_2026.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: dynamic network charge for battery storage at levels 1 to 5</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-dynamisches-netzentgelt-speicher-2033"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-dynamisches-netzentgelt-speicher-2033/folge/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: dynamic network charge for generation plants at levels 1 to 5</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-dynamisches-netzentgelt-erzeuger-2035"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-dynamisches-netzentgelt-erzeuger-2035/folge/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Settlement of energy exchange between TSOs: consultation closes (BK6-26-401, BK6-26-402)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk6-energieaustausch-abrechnung-konsultation"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk6-energieaustausch-abrechnung-konsultation/neu/2026-11-11</id>
    <updated>2026-11-11T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 23 November 2026.

Ruling Chamber 6 is consulting on two amendment proposals by all asynchronously connected TSOs to the common settlement rules for intended and unintended energy exchange under the Electricity Balancing Regulation: a new settlement time unit, and Annex 7 is deleted after the Baltic grids synchronised. Comments are due by 23 November 2026.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2026/BK6-26-402/BK6-26-402_verfahrenseroeffnung.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Grid package: system-serving connection capacity instead of maximum output</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#netzpaket-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/netzpaket-2027/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://dserver.bundestag.de/btd/21/078/2107866.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Rules for secure data exchange in the scheduling process v2.4 become binding</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#fahrplanprozess-sicherer-austausch-v24-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/fahrplanprozess-sicherer-austausch-v24-2027/neu/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 October 2027.

From 1 October 2027 version 2.4 of the rules for secure data exchange in the scheduling process applies to all market participants required to implement it (Notice no. 17 on BK6-18-061).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2018/BK6-18-061/Mitteilungen/Mitteilung_Nr_17/Mitteilung_17.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Congestion income 2028: report the planned use to the Federal Network Agency</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#engpasserloese-verwendung-plan-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/engpasserloese-verwendung-plan-2028/neu/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 October 2027.

Transmission system operators tell the Federal Network Agency in advance how they plan to use the 2028 congestion income from allocating cross-zonal capacity (Article 4 of the ACER methodology under Article 19(4) of Regulation (EU) 2019/943). The date is set by the Federal Network Agency deadline calendar; in 2026 it was 31 October.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK08/BK8_04_InfoRundschr/41_Rundschr/Downloads/Fristenkalender_Netzbetreiber_Netzentgelte_Elektrizitaet_2026.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: 2028 levies: publication by the transmission system operators</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enfg-umlagen-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/enfg-umlagen-2028/neu/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 25 October 2027.

The transmission system operators publish the 2028 CHP levy and offshore grid levy by 25 October 2027. Suppliers and grid operators carry the values into price sheets and grid fee billing.

Source: https://www.gesetze-im-internet.de/enfg/__11.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Surcharge for special grid use: show contributions separately</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#aufschlag-besondere-netznutzung-ausweis-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/aufschlag-besondere-netznutzung-ausweis-2027/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2024/2024_4-Steller/BK8-24-0001/Downloads/BK8-24-0001-A_Festlegung_Download_BF.pdf?__blob=publicationFile&amp;v=4

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: TSOs adjust network charges by 1 October</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-uenb-netzentgelte-anpassung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-uenb-netzentgelte-anpassung-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: explain a late adjustment of network charges for 1 January</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-netzentgelte-nachanpassung-erlaeuterung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-netzentgelte-nachanpassung-erlaeuterung-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: submit network charge review data and charge report by 1 January</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-netzentgelte-datenmeldung-bericht-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-netzentgelte-datenmeldung-bericht-2029/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: publish the uniform national feed-in charge</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-einspeiseentgelt-veroeffentlichung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-einspeiseentgelt-veroeffentlichung-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: DSOs report feed-in data to the TSO</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-einspeiseentgelt-datenmeldung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-einspeiseentgelt-datenmeldung-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: publish the final settlement of the surcharge for special grid use</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-aufschlag-endabrechnung-veroeffentlichung-2030"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-aufschlag-endabrechnung-veroeffentlichung-2030/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: AgNes: submit network charge review data and charge report by 1 January</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-netzentgelte-datenmeldung-bericht-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-netzentgelte-datenmeldung-bericht-2029/neu/2026-10-28</id>
    <updated>2026-10-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2029.

Operators of public electricity networks send the regulator, by 1 January each year, the data needed to review network charges together with a report on how the charges were calculated: basis and process under operative point 14, the documented allocation keys and other relevant aspects, so that an expert third party can follow the calculation without further information (AgNes draft ruling, operative point 16). The duty replaces the data and reporting duties under Section 28 StromNEV and Section 28 ARegV.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Publish 2026 network losses</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#verlustenergie-veroeffentlichung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/verlustenergie-veroeffentlichung-2027/folge/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.gesetze-im-internet.de/stromnev/__10.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the government bill, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 that lowers transmission network charges. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG draft).

Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Source: https://dserver.bundestag.de/btd/21/082/2108236.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Revenue cap 2028: TSO report on the adjustment and provisional network charges</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-eog-bericht-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/uenb-eog-bericht-2028/folge/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2019/2019_4-Steller/BK8-19-0001/BK8-19-0001-A_Festlegung_Download_BF.pdf?__blob=publicationFile&amp;v=1

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Submit the draft scenario framework for electricity and for gas and hydrogen</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#szenariorahmen-entwurf-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/szenariorahmen-entwurf-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 June 2028.

TSOs with control area responsibility submit the draft electricity scenario framework to the regulator by the end of 30 June of each even year (Section 12a(2) sentence 1 EnWG). For gas and hydrogen the coordination office of the gas TSOs submits it for approval on the same date (Section 15b(4) sentence 1 EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__12a.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Capacity market: TSO platform for prequalification by 1 May 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromvkg-plattform-praequalifizierung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromvkg-plattform-praequalifizierung-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 May 2027.

TSOs set up a joint web platform, for prequalification by 1 May 2027 and for capacity tenders by 15 October 2027 (Section 26(6) StromVKG). Plant operators submit their applications through it.

Source: https://www.gesetze-im-internet.de/stromvkg/__26.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Title changed: Capacity market: TSO platform for prequalification by 1 May 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromvkg-plattform-praequalifizierung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromvkg-plattform-praequalifizierung-2027/titel/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="titel" label="Title changed"/>
    <content type="text">Title changed.

Before: Capacity market: TSO platform for prequalification from 1 May 2027

Source: https://www.gesetze-im-internet.de/stromvkg/__26.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Regulatory account: application for 2025</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#regulierungskonto-antrag-2025"/>
    <id>tag:innobu.com,2026-11-24:fristen/regulierungskonto-antrag-2025/folge/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK08/BK8_04_InfoRundschr/41_Rundschr/Downloads/Fristenkalender_Netzbetreiber_Netzentgelte_Elektrizitaet_2026.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Redispatch 2.0: move controllable resources into the plan-value model</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#redispatch-planwertmodell-ueberfuehrung-2031"/>
    <id>tag:innobu.com,2026-11-24:fristen/redispatch-planwertmodell-ueberfuehrung-2031/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2031.

By 1 January 2031, distribution system operators, in coordination with the TSOs, are to move at least all controllable resources that can improve the efficiency of congestion management in the transmission grid into the plan-value model (BK6-23-241, annex BilAReM, section 2.3.1).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2023/BK6-23-241/BK6-23-241_bilarem.pdf?__blob=publicationFile&amp;v=1

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Grid package: system-serving connection capacity instead of maximum output</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#netzpaket-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/netzpaket-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The right to a grid connection no longer covers the maximum generation output: for plants connected from 1 January 2027, the draft caps feed-in from new first-segment solar plants at 70 percent of installed capacity and from onshore wind at 280 watts per square metre of rotor area (Section 8 of the draft EEG). By then the transmission system operators submit joint procedure rules for transmission grid connections to the Federal Network Agency, which may include prioritisation principles; distribution system operators may adopt them. Grid operators show available capacity on grid maps every month; the electronic enquiry procedure from 135 kilowatts only arrives in 2028 under the draft.

The right to a grid connection no longer covers the maximum generation output: for plants connected from 1 January 2027, the draft caps feed-in from new first-segment solar plants at 70 percent of installed capacity and from onshore wind at 280 watts per square metre of rotor area (Section 8 of the draft EEG). By then the transmission system operators submit joint procedure rules for transmission grid connections to the Federal Network Agency, which may include prioritisation principles; distribution system operators may adopt them. Operators with an extra-high/high or high/medium voltage transformation level show the connection capacity available there on a map every month (Section 17c(1) draft EnWG); the electronic enquiry procedure from 135 kilowatts only arrives in 2028 under the draft.

Source: https://dserver.bundestag.de/btd/21/078/2107866.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Publish the draft network development plans for electricity and for gas and hydrogen</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#nep-entwurf-strom-gas-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/nep-entwurf-strom-gas-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 May 2027.

TSOs with control area responsibility are to publish the draft electricity network development plan by the end of 31 May of each odd year (Section 12b(3) sentence 3 EnWG). The draft network development plan for gas and hydrogen must be published on the same date; it is prepared by the coordination office of the gas TSOs (Section 15c(4) EnWG). Downstream network operators can comment on both drafts.

Source: https://www.gesetze-im-internet.de/enwg_2005/__12b.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Report on 2026 supply interruptions to the Federal Network Agency (Section 52 EnWG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-52-versorgungsunterbrechungen-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-52-versorgungsunterbrechungen-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 April 2027.

All electricity and gas network operators submit to the Federal Network Agency by 30 April a report on all supply interruptions of the previous year, with time, duration, extent and cause of each interruption, the measures taken and the average interruption duration per connected final customer (Section 52 EnWG). According to the agency this applies regardless of the deadlines in its general rulings.

Source: https://www.gesetze-im-internet.de/enwg_2005/__52.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Section 23c EnWG: publish network structural data by 1 April</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-23c-strukturdaten-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-23c-strukturdaten-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 April 2027.

Every year by 1 April, electricity and gas network operators publish their network&#x27;s structural data on their website, mostly as of 31 December of the previous year or for that year: line lengths, energy withdrawn, number of withdrawal points (gas: exit points), for electricity the area supplied, and further network data (Section 23c(1) and (4) EnWG). Electricity network operators also report the number of smart metering systems, of agreements under Section 14a(1) sentence 1 EnWG and of grid connections that, in the previous year, remained uncompleted for more than three and more than six months after receipt of the connection request, broken down by voltage level (subsection 1 nos. 4a to 4d).

Source: https://www.gesetze-im-internet.de/enwg_2005/__23c.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Section 23c EnWG: publish network structural data by 1 April</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-23c-strukturdaten-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-23c-strukturdaten-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Every year by 1 April, electricity and gas network operators publish their network&#x27;s structural data on their website, mostly as of 31 December of the previous year: line lengths, energy withdrawn, number of withdrawal or exit points, areas and further network data (Section 23c(1) and (4) EnWG). Electricity network operators also report the number of smart metering systems, of agreements under Section 14a EnWG and of grid connections not completed for more than three and more than six months after the request in the previous year (subsection 1 nos. 4a to 4d).

Every year by 1 April, electricity and gas network operators publish their network&#x27;s structural data on their website, mostly as of 31 December of the previous year or for that year: line lengths, energy withdrawn, number of withdrawal points (gas: exit points), for electricity the area supplied, and further network data (Section 23c(1) and (4) EnWG). Electricity network operators also report the number of smart metering systems, of agreements under Section 14a(1) sentence 1 EnWG and of grid connections that, in the previous year, remained uncompleted for more than three and more than six months after receipt of the connection request, broken down by voltage level (subsection 1 nos. 4a to 4d).

Source: https://www.gesetze-im-internet.de/enwg_2005/__23c.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Section 23c EnWG: publish network structural data by 1 April</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-23c-strukturdaten-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-23c-strukturdaten-2027/folge/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.gesetze-im-internet.de/enwg_2005/__23c.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: &quot;Use instead of curtail&quot;: first evaluation and report (Section 13k(9) EnWG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-13k-evaluierung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-13k-evaluierung-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 July 2028.

TSOs with control area responsibility evaluate the application of &quot;use instead of curtail&quot; under Section 13k(1) to (7) EnWG for the first time by 1 July 2028 and every two years thereafter and submit a report. DSOs that have used the option under subsection 8 for at least twelve months evaluate their application likewise (Section 13k(9) EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__13k.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Five-year forecast of congestion measures to the Federal Network Agency (Section 13(10) EnWG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-13-10-redispatch-prognose-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-13-10-redispatch-prognose-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 July 2027.

The TSOs jointly prepare each year a forecast of the volume of grid-related measures under Section 13(1) and (2) EnWG for the next five years and send it to the Federal Network Agency by 1 July (Section 13(10) sentence 1 EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__13.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: TSOs&#x27; system stability report (Section 12i EnWG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-12i-systemstabilitaetsbericht-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-12i-systemstabilitaetsbericht-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

TSOs with control area responsibility report to the regulator every two years on the security, reliability, stability and performance of their network and of the electricity supply system, after 2025 again on 1 January 2027 (Section 12i(1) EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__12i.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Compliance report of independent transmission operators (Section 10e EnWG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-10e-ito-gleichbehandlungsbericht-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-10e-ito-gleichbehandlungsbericht-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 September 2027.

The compliance officer of an independent transmission operator prepares an annual report on the measures implementing the compliance programme and submits it to the regulator by 30 September (Section 10e(4) sentence 2 EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__10e.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Congestion management: report the 2028 cost reference value and the 2026 difference</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#engpassmanagement-referenzwert-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/engpassmanagement-referenzwert-2028/folge/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.gesetze-im-internet.de/aregv/__17.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EnFG: CHP forecast for 2028 and 2026 year-end settlement with the TSO</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enfg-50-kwk-prognose-jahresendabrechnung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enfg-50-kwk-prognose-jahresendabrechnung-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 August 2027.

By 31 August distribution system operators send the TSO the forecast CHP volumes, bonuses and grid withdrawals for the following year (Section 50 no. 3 EnFG). On the same date the year-end settlement between distribution and transmission system operators for the previous year takes place (Section 19(1) no. 2 EnFG); the resulting payment claims must be settled by 15 September (Section 19(2)), as must the differences between passed-on and finally settled EEG volumes (Section 19(3)).

Source: https://www.gesetze-im-internet.de/enfg/__50.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: EnFG: CHP forecast for 2028 and 2026 year-end settlement with the TSO</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enfg-50-kwk-prognose-jahresendabrechnung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enfg-50-kwk-prognose-jahresendabrechnung-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: By 31 August distribution system operators send the TSO the forecast CHP volumes, bonuses and grid withdrawals for the following year (Section 50 no. 3 EnFG). On the same date the year-end settlement between distribution and transmission system operators for the previous year takes place (Section 19(1) no. 2 EnFG); the resulting payment claims must be settled by 15 September (Section 19(2)).

By 31 August distribution system operators send the TSO the forecast CHP volumes, bonuses and grid withdrawals for the following year (Section 50 no. 3 EnFG). On the same date the year-end settlement between distribution and transmission system operators for the previous year takes place (Section 19(1) no. 2 EnFG); the resulting payment claims must be settled by 15 September (Section 19(2)), as must the differences between passed-on and finally settled EEG volumes (Section 19(3)).

Source: https://www.gesetze-im-internet.de/enfg/__50.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EnFG: final settlement of EEG and KWKG payments for 2026 to the TSO</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enfg-50-endabrechnung-vnb-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enfg-50-endabrechnung-vnb-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 May 2027.

Distribution system operators send their upstream TSO by 31 May the final settlements of EEG and KWKG payments for the previous year, individually and in aggregate, for each installation with register number and volumes, plus the other data under Section 50 no. 2 EnFG. The aggregated settlements must be audited (Section 55(1) EnFG).

Source: https://www.gesetze-im-internet.de/enfg/__50.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Determine and report the EEG and KWKG funding requirement for 2028 (Section 4 EnFG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enfg-4-finanzierungsbedarf-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enfg-4-finanzierungsbedarf-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 September 2027.

The TSOs determine by 30 September the EEG and KWKG funding requirements for the following year and report: to the Federal Ministry for Economic Affairs the EEG funding requirement and the expected amount of the claim under Section 6(1) sentence 1 or 2 EnFG for the current year, to the Federal Ministry of Agriculture the total follow-up support paid for small manure plants in the previous year, to the Federal Office for Economic Affairs and Export Control the KWKG funding requirement, and to the Federal Network Agency both funding requirements and the offshore connection costs (Section 4 nos. 1 to 4 EnFG).

Source: https://www.gesetze-im-internet.de/enfg/__4.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Determine and report the EEG and KWKG funding requirement for 2028 (Section 4 EnFG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enfg-4-finanzierungsbedarf-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enfg-4-finanzierungsbedarf-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The TSOs determine by 30 September the EEG and KWKG funding requirements for the following year and report them to the Federal Ministry for Economic Affairs, the Federal Office for Economic Affairs and Export Control and the Federal Network Agency, the latter also receiving the offshore connection costs (Section 4 EnFG).

The TSOs determine by 30 September the EEG and KWKG funding requirements for the following year and report: to the Federal Ministry for Economic Affairs the EEG funding requirement and the expected amount of the claim under Section 6(1) sentence 1 or 2 EnFG for the current year, to the Federal Ministry of Agriculture the total follow-up support paid for small manure plants in the previous year, to the Federal Office for Economic Affairs and Export Control the KWKG funding requirement, and to the Federal Network Agency both funding requirements and the offshore connection costs (Section 4 nos. 1 to 4 EnFG).

Source: https://www.gesetze-im-internet.de/enfg/__4.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Energy sharing: network operators&#x27; joint web platform (Section 20b EnWG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#energy-sharing-plattform"/>
    <id>tag:innobu.com,2026-11-24:fristen/energy-sharing-plattform/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Network operators jointly build a nationwide web platform under Section 20b EnWG that also registers energy sharing agreements. The Federal Network Agency sets the date; until then energy sharing runs through the service model.

Network operators jointly build a nationwide web platform under Section 20b EnWG that also registers energy sharing agreements. The Federal Network Agency sets the date. Independently of the platform, every distribution system operator has had to enable energy sharing within its balancing area since 1 June 2026 (Section 42c(4) EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__20b.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Energy sharing: network operators&#x27; joint web platform (Section 20b EnWG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#energy-sharing-plattform"/>
    <id>tag:innobu.com,2026-11-24:fristen/energy-sharing-plattform/folge/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.gesetze-im-internet.de/enwg_2005/__20b.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: TSOs: five-year outlook on renewables expansion and EEG payments</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-74-enfg-60-vorausschau-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-74-enfg-60-vorausschau-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 25 October 2027.

TSOs prepare and publish by 25 October an outlook for the expansion of renewables (Section 74(1) EEG) and for the payments due (Section 60(1) EnFG) over the following five calendar years.

Source: https://www.gesetze-im-internet.de/eeg_2014/__74.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Negative prices: TSOs publish zero-value periods of 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-51a-nullwert-viertelstunden-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-51a-nullwert-viertelstunden-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 January 2027.

TSOs publish by 31 January on a joint website the number of quarter-hours and hours of the previous year in which the applicable value fell to zero because of negative prices (Section 51a(4) EEG). Plant operators and direct marketers need these figures for the extension of the support period under Section 51a.

Source: https://www.gesetze-im-internet.de/eeg_2014/__51a.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Surcharge for special grid use: show contributions separately</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#aufschlag-besondere-netznutzung-ausweis-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/aufschlag-besondere-netznutzung-ausweis-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 25 October 2027.

Each year by 25 October the TSOs show the contributions from the surcharge for special feed-in-related grid use (renewables grid cost pass-through) and from the mechanism under Section 19(2) sentence 15 StromNEV for the following year separately on netztransparenz.de (BK8-24-001-A, operative point 7 sentence 2).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2024/2024_4-Steller/BK8-24-0001/Downloads/BK8-24-0001-A_Festlegung_Download_BF.pdf?__blob=publicationFile&amp;v=4

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: AgNes: TSOs adjust network charges by 1 October</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-uenb-netzentgelte-anpassung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-uenb-netzentgelte-anpassung-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 October 2028.

Under the AgNes draft, TSOs adjust their network charges for the following year by 1 October, DSOs by 15 October (operative point 14.4 sentence 1).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
</feed>
