{
 "version": "https://jsonfeed.org/version/1.1",
 "title": "innobu deadline calendar: new and changed",
 "home_page_url": "https://www.innobu.com/en/deadline-calendar-changes.html",
 "feed_url": "https://www.innobu.com/assets/feeds/fristen-aenderungen-en.json",
 "description": "Every change to the energy transition deadline calendar: deadlines added, dates moved, status changes, corrected obligations and legal consequences, with dates.",
 "language": "en",
 "authors": [
  {
   "name": "innobu GmbH",
   "url": "https://www.innobu.com/"
  }
 ],
 "items": [
  {
   "id": "tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027",
   "title": "Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029",
   "content_text": "Obligation text changed.\n\nBefore: Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat has until 4 December 2026 for its second reading. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).\n\nUnder the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).\n\nSource: https://dserver.bundestag.de/btd/21/082/2108236.pdf\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "pflicht",
    "NB-S",
    "UENB",
    "LF"
   ],
   "_innobu": {
    "frist": "uenb-zuschuss-2027",
    "kind": "pflicht",
    "old": {
     "de": "Nach dem Gesetzesbeschluss des Bundestages vom 12.11.2026 erhalten die Übertragungsnetzbetreiber 2027 bis 2029 je 5,525 Milliarden Euro Zuschuss (§ 24d EnWG), der die Übertragungsnetzentgelte senkt; der Bundesrat berät im zweiten Durchgang bis 04.12.2026. Die Übertragungsnetzbetreiber veröffentlichen ihr Entgelt mit und ohne Zuschuss, Verteilnetzbetreiber zusätzlich ein fiktives Netzentgelt ohne Zuschuss, und Lieferanten weisen in der Rechnung auf den Zuschuss hin (§ 118 Abs. 5b EnWG).",
     "en": "Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat has until 4 December 2026 for its second reading. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG)."
    },
    "new": {
     "de": "Nach dem Gesetzesbeschluss des Bundestages vom 12.11.2026 erhalten die Übertragungsnetzbetreiber 2027 bis 2029 je 5,525 Milliarden Euro Zuschuss (§ 24d EnWG), der die Übertragungsnetzentgelte senkt; der Bundesrat hat am 20.11.2026 keinen Vermittlungsausschuss angerufen, die Verkündung steht aus. Die Übertragungsnetzbetreiber veröffentlichen ihr Entgelt mit und ohne Zuschuss, Verteilnetzbetreiber zusätzlich ein fiktives Netzentgelt ohne Zuschuss, und Lieferanten weisen in der Rechnung auf den Zuschuss hin (§ 118 Abs. 5b EnWG).",
     "en": "Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG)."
    },
    "source": "https://dserver.bundestag.de/btd/21/082/2108236.pdf"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/sicherheitsvorfall-meldung-energienetz/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#sicherheitsvorfall-meldung-energienetz",
   "title": "Added: Significant security incident: 24 hours, 72 hours, one month",
   "content_text": "Added: Date: within 24 hours after; within 72 hours after; within 1 month after.\n\nOperators of energy supply networks, energy installations and digital energy services under Section 5c(1) sentence 1 nos. 1 to 3 EnWG report a significant security incident to the reporting office under Section 32 BSIG as an early warning at the latest 24 hours after becoming aware of it, with an initial assessment at the latest 72 hours after becoming aware of it, and with a final report at the latest one month after that notification, or a progress report if the incident is still ongoing (Section 5d(3) EnWG, Section 32(2) BSIG).\n\nSource: https://www.gesetze-im-internet.de/enwg_2005/__5d.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "NB-S",
    "NB-G",
    "UENB",
    "AB"
   ],
   "_innobu": {
    "frist": "sicherheitsvorfall-meldung-energienetz",
    "kind": "neu",
    "old": null,
    "new": {
     "steps": [
      {
       "n": 24,
       "unit": "stunden",
       "direction": "nach",
       "what": {
        "de": "frühe Erstmeldung",
        "en": "early warning"
       }
      },
      {
       "n": 72,
       "unit": "stunden",
       "direction": "nach",
       "what": {
        "de": "Meldung mit erster Bewertung",
        "en": "notification with initial assessment"
       }
      },
      {
       "n": 1,
       "unit": "monate",
       "direction": "nach",
       "what": {
        "de": "Abschlussmeldung, bei andauerndem Vorfall Fortschrittsmeldung",
        "en": "final report, or progress report if the incident is ongoing"
       },
       "anchor": {
        "de": "der Meldung",
        "en": "the notification"
       }
      }
     ],
     "status": "fest",
     "title": {
      "de": "Erheblicher Sicherheitsvorfall: 24 Stunden, 72 Stunden, ein Monat",
      "en": "Significant security incident: 24 hours, 72 hours, one month"
     }
    },
    "source": "https://www.gesetze-im-internet.de/enwg_2005/__5d.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/nav6-zeitbedarf-netzanschluss/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#nav6-zeitbedarf-netzanschluss",
   "title": "Added: Low-voltage grid connection: state the time needed within ten working days",
   "content_text": "Added: Date: within 10 working days after.\n\nThe network operator tells the connectee the expected time needed without undue delay and at the latest ten working days after the order to establish the grid connection (Section 6(1) NAV).\n\nSource: https://www.gesetze-im-internet.de/nav/__6.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "NB-S"
   ],
   "_innobu": {
    "frist": "nav6-zeitbedarf-netzanschluss",
    "kind": "neu",
    "old": null,
    "new": {
     "steps": [
      {
       "n": 10,
       "unit": "werktage",
       "direction": "nach"
      }
     ],
     "status": "fest",
     "title": {
      "de": "Netzanschluss Niederspannung: Zeitbedarf binnen zehn Werktagen mitteilen",
      "en": "Low-voltage grid connection: state the time needed within ten working days"
     }
    },
    "source": "https://www.gesetze-im-internet.de/nav/__6.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/nav19-zustimmung-ladeeinrichtung/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#nav19-zustimmung-ladeeinrichtung",
   "title": "Added: Charging equipment above 12 kVA: network operator responds within two months",
   "content_text": "Added: Date: within 2 months after.\n\nWhere charging equipment needs the network operator's consent because its total rated power exceeds 12 kVA per electrical installation, the network operator responds within two months of receiving the notification; if it refuses, it sets out the obstacle, possible remedies and the time needed for them (Section 19(2) NAV).\n\nSource: https://www.gesetze-im-internet.de/nav/__19.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "NB-S"
   ],
   "_innobu": {
    "frist": "nav19-zustimmung-ladeeinrichtung",
    "kind": "neu",
    "old": null,
    "new": {
     "steps": [
      {
       "n": 2,
       "unit": "monate",
       "direction": "nach"
      }
     ],
     "status": "fest",
     "title": {
      "de": "Ladeeinrichtungen über 12 kVA: Netzbetreiber äußert sich binnen zwei Monaten",
      "en": "Charging equipment above 12 kVA: network operator responds within two months"
     }
    },
    "source": "https://www.gesetze-im-internet.de/nav/__19.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/mastr-marktakteur-registrierung/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-marktakteur-registrierung",
   "title": "Added: Market master data register: register a new market role",
   "content_text": "Added: Date: within 1 month after.\n\nMarket actors register for each market function within one month of first acting in it; network operators without undue delay after their licence is notified (Section 3(2) MaStRV).\n\nSource: https://www.gesetze-im-internet.de/mastrv/__3.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "NB-S",
    "wMSB",
    "LF",
    "BKV"
   ],
   "_innobu": {
    "frist": "mastr-marktakteur-registrierung",
    "kind": "neu",
    "old": null,
    "new": {
     "steps": [
      {
       "n": 1,
       "unit": "monate",
       "direction": "nach"
      }
     ],
     "status": "fest",
     "title": {
      "de": "Marktstammdatenregister: neue Marktrolle registrieren",
      "en": "Market master data register: register a new market role"
     }
    },
    "source": "https://www.gesetze-im-internet.de/mastrv/__3.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/mastr-einheit-registrierung/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-einheit-registrierung",
   "title": "Added: Market master data register: register a new plant",
   "content_text": "Added: Date: within 1 month after.\n\nOperators register units, for example for generation and storage, and EEG plants in the market master data register within one month of commissioning, and CHP plants within one month of starting or, after modernisation, resuming continuous operation (Section 5(5) MaStRV).\n\nSource: https://www.gesetze-im-internet.de/mastrv/__5.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "AB",
    "SPB"
   ],
   "_innobu": {
    "frist": "mastr-einheit-registrierung",
    "kind": "neu",
    "old": null,
    "new": {
     "steps": [
      {
       "n": 1,
       "unit": "monate",
       "direction": "nach"
      }
     ],
     "status": "fest",
     "title": {
      "de": "Marktstammdatenregister: neue Anlage registrieren",
      "en": "Market master data register: register a new plant"
     }
    },
    "source": "https://www.gesetze-im-internet.de/mastrv/__5.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/mastr-aenderung-registrieren/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-aenderung-registrieren",
   "title": "Added: Market master data register: record changes",
   "content_text": "Added: Date: within 1 month after.\n\nWhen recorded data change, the responsible party registers the change within one month of it occurring (Section 7(1) MaStRV).\n\nSource: https://www.gesetze-im-internet.de/mastrv/__7.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "LF",
    "AB"
   ],
   "_innobu": {
    "frist": "mastr-aenderung-registrieren",
    "kind": "neu",
    "old": null,
    "new": {
     "steps": [
      {
       "n": 1,
       "unit": "monate",
       "direction": "nach"
      }
     ],
     "status": "fest",
     "title": {
      "de": "Marktstammdatenregister: Änderungen eintragen",
      "en": "Market master data register: record changes"
     }
    },
    "source": "https://www.gesetze-im-internet.de/mastrv/__7.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/lieferantenwechsel-24-stunden/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#lieferantenwechsel-24-stunden",
   "title": "Added: Supplier switch within 24 hours",
   "content_text": "Added: Date: within 24 hours after.\n\nSince 1 January 2026, the technical process of switching energy supplier must be completed within 24 hours and be possible on every working day; a longer period is only allowed where the registration relates to a supply date further in the future (Section 20a(2) EnWG).\n\nSource: https://www.gesetze-im-internet.de/enwg_2005/__20a.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "NB-S",
    "LF"
   ],
   "_innobu": {
    "frist": "lieferantenwechsel-24-stunden",
    "kind": "neu",
    "old": null,
    "new": {
     "steps": [
      {
       "n": 24,
       "unit": "stunden",
       "direction": "nach",
       "what": {
        "de": "technischer Wechsel",
        "en": "technical switch"
       }
      }
     ],
     "status": "fest",
     "title": {
      "de": "Lieferantenwechsel binnen 24 Stunden",
      "en": "Supplier switch within 24 hours"
     }
    },
    "source": "https://www.gesetze-im-internet.de/enwg_2005/__20a.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/gmodg-96-4-bestaetigung-biogener-anteil-2029/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#gmodg-96-4-bestaetigung-biogener-anteil-2029",
   "title": "Added: Building Modernisation Act: confirm the biomethane or hydrogen share with the bill",
   "content_text": "Added: Date 1 January 2029.\n\nFrom 2029, gas, oil and LPG heating systems newly installed in existing buildings must generate at least 10 percent of the heat supplied from biomethane, bio-oil, biogenic LPG or hydrogen (Section 43 GModG). Anyone supplying such buildings commercially with these fuels confirms to the customer with the bill that the requirements are met (Section 96(4) GModG).\n\nSource: https://www.gesetze-im-internet.de/geg/__96.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "LF"
   ],
   "_innobu": {
    "frist": "gmodg-96-4-bestaetigung-biogener-anteil-2029",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2029-01-01",
     "status": "fest",
     "title": {
      "de": "Gebäudemodernisierungsgesetz: Anteil aus Biomethan oder Wasserstoff mit der Abrechnung bestätigen",
      "en": "Building Modernisation Act: confirm the biomethane or hydrogen share with the bill"
     }
    },
    "source": "https://www.gesetze-im-internet.de/geg/__96.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/gmodg-43-6-betreiber-biogener-anteil-2029/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#gmodg-43-6-betreiber-biogener-anteil-2029",
   "title": "Added: Building Modernisation Act: operators of third-party heating systems ensure 10 percent heat from biomethane or hydrogen",
   "content_text": "Added: Date 1 January 2029.\n\nWhere a third party rather than the owner operates a gas, oil or LPG heating system installed in an existing building after 29 July 2026, the operator meets the obligation to generate at least 10 percent of the heat from biomethane, bio-oil, biogenic LPG or hydrogen from 2029 and at least 15 percent from 2030 (Section 43(1) and (6) GModG).\n\nSource: https://www.gesetze-im-internet.de/geg/__43.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "WN"
   ],
   "_innobu": {
    "frist": "gmodg-43-6-betreiber-biogener-anteil-2029",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2029-01-01",
     "status": "fest",
     "title": {
      "de": "Gebäudemodernisierungsgesetz: Betreiber fremder Heizungen sichern 10 Prozent Wärme aus Biomethan oder Wasserstoff",
      "en": "Building Modernisation Act: operators of third-party heating systems ensure 10 percent heat from biomethane or hydrogen"
     }
    },
    "source": "https://www.gesetze-im-internet.de/geg/__43.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/gmodg-22-primaerenergiefaktor-fernwaerme-2027/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#gmodg-22-primaerenergiefaktor-fernwaerme-2027",
   "title": "Added: District heating with CHP: new calculation method for published primary energy factors",
   "content_text": "Added: Date 1 January 2027.\n\nFrom 1 January 2027, builders may only use a primary energy factor published by the district heating supplier for heat from CHP plants if it was determined using the method of DIN EN 15316-4-5:2017-09 and the publication states this method; otherwise the district heating value in Annex 4 GModG applies (Section 22 GModG, amended by Article 2 of Federal Law Gazette 2026 I No. 226).\n\nSource: https://www.recht.bund.de/bgbl/1/2026/226/regelungstext.pdf\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "WN"
   ],
   "_innobu": {
    "frist": "gmodg-22-primaerenergiefaktor-fernwaerme-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-01-01",
     "status": "fest",
     "title": {
      "de": "Fernwärme mit KWK: neue Berechnungsmethode für veröffentlichte Primärenergiefaktoren",
      "en": "District heating with CHP: new calculation method for published primary energy factors"
     }
    },
    "source": "https://www.recht.bund.de/bgbl/1/2026/226/regelungstext.pdf"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/eu-data-act-art3-produktgestaltung-2026/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#eu-data-act-art3-produktgestaltung-2026",
   "title": "Added: Data Act: data access built into the design of new connected products",
   "content_text": "Added: Date 13 September 2026.\n\nConnected products and related services placed on the market after 12 September 2026 must be designed so that users can access their data, including metadata, by default easily, securely, free of charge, in a machine-readable format and, where relevant and technically feasible, directly (Article 3(1) and Article 50 of Regulation (EU) 2023/2854).\n\nSource: https://eur-lex.europa.eu/eli/reg/2023/2854/oj/deu\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "LF",
    "CPO"
   ],
   "_innobu": {
    "frist": "eu-data-act-art3-produktgestaltung-2026",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2026-09-13",
     "status": "in-kraft",
     "title": {
      "de": "Data Act: Datenzugang schon in der Gestaltung neuer vernetzter Produkte",
      "en": "Data Act: data access built into the design of new connected products"
     }
    },
    "source": "https://eur-lex.europa.eu/eli/reg/2023/2854/oj/deu"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/enwg5-anzeige-belieferung/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg5-anzeige-belieferung",
   "title": "Added: Notify the Federal Network Agency of supplying household customers",
   "content_text": "Added: Date: without undue delay after.\n\nEnergy suppliers notify the Federal Network Agency without undue delay when they start supplying household customers (Section 5(1) and (2) EnWG).\n\nSource: https://www.gesetze-im-internet.de/enwg_2005/__5.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "LF"
   ],
   "_innobu": {
    "frist": "enwg5-anzeige-belieferung",
    "kind": "neu",
    "old": null,
    "new": {
     "steps": [
      {
       "unit": "unverzueglich",
       "direction": "nach"
      }
     ],
     "status": "fest",
     "title": {
      "de": "Belieferung von Haushaltskunden bei der Bundesnetzagentur anzeigen",
      "en": "Notify the Federal Network Agency of supplying household customers"
     }
    },
    "source": "https://www.gesetze-im-internet.de/enwg_2005/__5.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/enwg5-anzeige-beendigung/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg5-anzeige-beendigung",
   "title": "Added: Notify the end of supplying household customers",
   "content_text": "Added: Date: at least 3 months before.\n\nEnergy suppliers notify the end of supply so that the notification reaches the Federal Network Agency at least three months before the planned end date, and do not stop earlier unless they have filed for insolvency (Section 5(2) EnWG).\n\nSource: https://www.gesetze-im-internet.de/enwg_2005/__5.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "LF"
   ],
   "_innobu": {
    "frist": "enwg5-anzeige-beendigung",
    "kind": "neu",
    "old": null,
    "new": {
     "steps": [
      {
       "n": 3,
       "unit": "monate",
       "direction": "vor",
       "what": {
        "de": "Zugang bei der Bundesnetzagentur",
        "en": "receipt by the Federal Network Agency"
       },
       "anchor": {
        "de": "dem geplanten Beendigungstermin",
        "en": "the planned end date"
       }
      }
     ],
     "status": "fest",
     "title": {
      "de": "Beendigung der Belieferung von Haushaltskunden anzeigen",
      "en": "Notify the end of supplying household customers"
     }
    },
    "source": "https://www.gesetze-im-internet.de/enwg_2005/__5.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/enwg40c-rechnung-sechs-wochen/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg40c-rechnung-sechs-wochen",
   "title": "Added: Bill and final bill within six weeks",
   "content_text": "Added: Date: within 6 weeks after.\n\nEnergy suppliers provide final customers with the bill at the latest six weeks after the end of the billing period and with the final bill at the latest six weeks after the end of supply; for monthly billing under Section 40b(1) the deadline is three weeks (Section 40c(2) EnWG).\n\nSource: https://www.gesetze-im-internet.de/enwg_2005/__40c.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "LF"
   ],
   "_innobu": {
    "frist": "enwg40c-rechnung-sechs-wochen",
    "kind": "neu",
    "old": null,
    "new": {
     "steps": [
      {
       "n": 6,
       "unit": "wochen",
       "direction": "nach"
      }
     ],
     "status": "fest",
     "title": {
      "de": "Rechnung und Abschlussrechnung binnen sechs Wochen",
      "en": "Bill and final bill within six weeks"
     }
    },
    "source": "https://www.gesetze-im-internet.de/enwg_2005/__40c.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/enefg-8-ems-novelle-2027/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#enefg-8-ems-novelle-2027",
   "title": "Added: Set up an energy or environmental management system (EnEfG amendment)",
   "content_text": "Added: Date 11 October 2027.\n\nUnder the government draft amending the EnEfG, companies with total final energy consumption above 23.6 GWh that reached this status by the end of 2025 set up an energy or environmental management system by 11 October 2027 (draft Section 8 EnEfG).\n\nSource: https://dserver.bundestag.de/btd/21/080/2108027.pdf\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "UNT"
   ],
   "_innobu": {
    "frist": "enefg-8-ems-novelle-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-10-11",
     "status": "geplant",
     "title": {
      "de": "Energie- oder Umweltmanagementsystem einrichten (EnEfG-Novelle)",
      "en": "Set up an energy or environmental management system (EnEfG amendment)"
     }
    },
    "source": "https://dserver.bundestag.de/btd/21/080/2108027.pdf"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/enefg-17-abwaerme-meldung-2027/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#enefg-17-abwaerme-meldung-2027",
   "title": "Added: Waste heat: report to the Federal Office for Energy Efficiency by 31 March",
   "content_text": "Added: Date 31 March 2027.\n\nCompanies whose total final energy consumption averaged more than 2.5 GWh over the last three calendar years send the Federal Office for Energy Efficiency the information on their waste heat every year by 31 March and update it without delay when it changes (Section 17(2) EnEfG).\n\nSource: https://www.gesetze-im-internet.de/enefg/__17.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "UNT"
   ],
   "_innobu": {
    "frist": "enefg-17-abwaerme-meldung-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-03-31",
     "status": "fest",
     "title": {
      "de": "Abwärme melden: Informationen an die Bundesstelle für Energieeffizienz bis 31. März",
      "en": "Waste heat: report to the Federal Office for Energy Efficiency by 31 March"
     }
    },
    "source": "https://www.gesetze-im-internet.de/enefg/__17.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/enefg-13-rechenzentren-bericht-2027/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#enefg-13-rechenzentren-bericht-2027",
   "title": "Added: Data centres: publish annual information and send it to the federal government (31 March)",
   "content_text": "Added: Date 31 March 2027.\n\nOperators of data centres with a non-redundant rated connected load of 300 kW or more publish the information under Annex 3 EnEfG for the previous year every year by 31 March and send it to the federal government (Section 13(1) EnEfG).\n\nSource: https://www.gesetze-im-internet.de/enefg/__13.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "UNT"
   ],
   "_innobu": {
    "frist": "enefg-13-rechenzentren-bericht-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-03-31",
     "status": "fest",
     "title": {
      "de": "Rechenzentren: Jahresinformationen veröffentlichen und an den Bund übermitteln (31. März)",
      "en": "Data centres: publish annual information and send it to the federal government (31 March)"
     }
    },
    "source": "https://www.gesetze-im-internet.de/enefg/__13.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/enefg-11-rechenzentren-pue-2027/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#enefg-11-rechenzentren-pue-2027",
   "title": "Added: Data centres: power usage effectiveness (PUE) of 1.5 or lower",
   "content_text": "Added: Date 1 July 2027.\n\nData centres of 300 kW or more that started operating before 1 July 2026 permanently reach an annual average power usage effectiveness of 1.5 or lower from 1 July 2027, and 1.3 or lower from 1 July 2030 (Section 11(1) EnEfG).\n\nSource: https://www.gesetze-im-internet.de/enefg/__11.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "UNT"
   ],
   "_innobu": {
    "frist": "enefg-11-rechenzentren-pue-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-07-01",
     "status": "fest",
     "title": {
      "de": "Rechenzentren: Energieverbrauchseffektivität (PUE) höchstens 1,5",
      "en": "Data centres: power usage effectiveness (PUE) of 1.5 or lower"
     }
    },
    "source": "https://www.gesetze-im-internet.de/enefg/__11.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/enefg-11-5-rechenzentren-oekostrom-2027/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#enefg-11-5-rechenzentren-oekostrom-2027",
   "title": "Added: Data centres: electricity demand met entirely from renewable sources",
   "content_text": "Added: Date 1 January 2027.\n\nFrom 1 January 2027, operators of data centres of 300 kW or more cover their electricity consumption entirely with electricity from renewable sources on a balance-sheet basis (Section 11(5) no. 2 EnEfG).\n\nSource: https://www.gesetze-im-internet.de/enefg/__11.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "UNT"
   ],
   "_innobu": {
    "frist": "enefg-11-5-rechenzentren-oekostrom-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-01-01",
     "status": "fest",
     "title": {
      "de": "Rechenzentren: Strombedarf zu 100 Prozent aus erneuerbaren Energien",
      "en": "Data centres: electricity demand met entirely from renewable sources"
     }
    },
    "source": "https://www.gesetze-im-internet.de/enefg/__11.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/eeg8-zeitplan-kleinanlagen/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg8-zeitplan-kleinanlagen",
   "title": "Added: EEG grid connection up to 30 kW: grid compatibility check result within one month",
   "content_text": "Added: Date: within 1 month after.\n\nSince 1 January 2025, for plants under Section 8(1) sentence 2 EEG, electricity network operators send the result of the grid compatibility check, with schedule, information on attendance, cost estimate and equipment under Section 9, without undue delay and at the latest one month after receiving the request; requests must be possible via a web portal (Section 8(7) EEG).\n\nSource: https://www.gesetze-im-internet.de/eeg_2014/__8.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "NB-S"
   ],
   "_innobu": {
    "frist": "eeg8-zeitplan-kleinanlagen",
    "kind": "neu",
    "old": null,
    "new": {
     "steps": [
      {
       "n": 1,
       "unit": "monate",
       "direction": "nach"
      }
     ],
     "status": "fest",
     "title": {
      "de": "EEG-Netzanschluss bis 30 kW: Ergebnis der Netzverträglichkeitsprüfung binnen eines Monats",
      "en": "EEG grid connection up to 30 kW: grid compatibility check result within one month"
     }
    },
    "source": "https://www.gesetze-im-internet.de/eeg_2014/__8.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/eeg8-netzvertraeglichkeitspruefung/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg8-netzvertraeglichkeitspruefung",
   "title": "Added: EEG grid connection: grid compatibility check result within eight weeks",
   "content_text": "Added: Date: within 8 weeks after.\n\nElectricity network operators send applicants the result of the grid compatibility check, with a schedule and the necessary information, without undue delay and at the latest eight weeks after receiving the required information (Section 8(6) EEG).\n\nSource: https://www.gesetze-im-internet.de/eeg_2014/__8.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "NB-S"
   ],
   "_innobu": {
    "frist": "eeg8-netzvertraeglichkeitspruefung",
    "kind": "neu",
    "old": null,
    "new": {
     "steps": [
      {
       "n": 8,
       "unit": "wochen",
       "direction": "nach"
      }
     ],
     "status": "fest",
     "title": {
      "de": "EEG-Netzanschluss: Ergebnis der Netzverträglichkeitsprüfung binnen acht Wochen",
      "en": "EEG grid connection: grid compatibility check result within eight weeks"
     }
    },
    "source": "https://www.gesetze-im-internet.de/eeg_2014/__8.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/bimschv38-8-ladestrom-oeffentlich-2027/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#bimschv38-8-ladestrom-oeffentlich-2027",
   "title": "Added: GHG quota: report 2026 charging electricity from public charge points to the Federal Environment Agency",
   "content_text": "Added: Date 28 February 2027.\n\nAnyone who wants electricity from publicly accessible charge points credited towards the greenhouse gas reduction quota reports the quantity drawn in the obligation year to the competent body at the Federal Environment Agency by the end of 28 February of the following year (Section 8(1) sentence 1 no. 1 of the 38th BImSchV).\n\nSource: https://www.gesetze-im-internet.de/bimschv_38_2017/__8.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "CPO"
   ],
   "_innobu": {
    "frist": "bimschv38-8-ladestrom-oeffentlich-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-02-28",
     "status": "fest",
     "title": {
      "de": "THG-Quote: Ladestrom öffentlicher Ladepunkte 2026 beim Umweltbundesamt mitteilen",
      "en": "GHG quota: report 2026 charging electricity from public charge points to the Federal Environment Agency"
     }
    },
    "source": "https://www.gesetze-im-internet.de/bimschv_38_2017/__8.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/bimschv38-8-ladestrom-bev-2027/neu/2026-11-24",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#bimschv38-8-ladestrom-bev-2027",
   "title": "Added: GHG quota: report non-public charging of battery electric cars for 2027 to the Federal Environment Agency",
   "content_text": "Added: Date 15 November 2027.\n\nFor electricity drawn to charge battery electric vehicles outside public charge points, the report to the competent body at the Federal Environment Agency is due by the end of 15 November of the obligation year (Section 8(1) sentence 1 no. 2 of the 38th BImSchV).\n\nSource: https://www.gesetze-im-internet.de/bimschv_38_2017/__8.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-24T00:00:00Z",
   "tags": [
    "neu",
    "LF",
    "CPO"
   ],
   "_innobu": {
    "frist": "bimschv38-8-ladestrom-bev-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-11-15",
     "status": "fest",
     "title": {
      "de": "THG-Quote: nicht-öffentliches Laden reiner E-Autos 2027 beim Umweltbundesamt mitteilen",
      "en": "GHG quota: report non-public charging of battery electric cars for 2027 to the Federal Environment Agency"
     }
    },
    "source": "https://www.gesetze-im-internet.de/bimschv_38_2017/__8.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/smgw-tr-03109-1-v2-muss-plus-2027/pflicht/2026-11-22",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#smgw-tr-03109-1-v2-muss-plus-2027",
   "title": "Obligation text changed: BSI TR-03109-1 v2.0: gateway certificates only with MUSS+",
   "content_text": "Obligation text changed.\n\nBefore: Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician, plus TAF 8 in its new form and TAF 15. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.\n\nAnyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.\n\nSource: https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/Schutzprofile/Uebergangsregelung-PP-0073_und_TR-03109-1.pdf?__blob=publicationFile\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-22T00:00:00Z",
   "tags": [
    "pflicht",
    "gMSB",
    "wMSB"
   ],
   "_innobu": {
    "frist": "smgw-tr-03109-1-v2-muss-plus-2027",
    "kind": "pflicht",
    "old": {
     "de": "Wer ein Smart-Meter-Gateway nach Schutzprofil und TR-03109-1 in Version 2.0 zertifizieren lässt, muss ab dem 1. Januar 2027 auch die MUSS+-Anforderungen nachweisen, laut BSI unter anderem eine WAN-API, registrierende Leistungsmessung über das lokale metrologische Netz und den Werksreset durch den Service-Techniker. Dazu gehören TAF 8 in neuer Fassung und TAF 15. Übergangsweise dürfen Gateways nach TR v1.1 und Schutzprofil v1.3 laut BSI noch bis zum 31.12.2027 eingebaut werden.",
     "en": "Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician, plus TAF 8 in its new form and TAF 15. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure."
    },
    "new": {
     "de": "Wer ein Smart-Meter-Gateway nach Schutzprofil und TR-03109-1 in Version 2.0 zertifizieren lässt, muss ab dem 1. Januar 2027 auch die MUSS+-Anforderungen nachweisen, laut BSI unter anderem eine WAN-API, registrierende Leistungsmessung über das lokale metrologische Netz und den Werksreset durch den Service-Techniker. Übergangsweise dürfen Gateways nach TR v1.1 und Schutzprofil v1.3 laut BSI noch bis zum 31.12.2027 eingebaut werden.",
     "en": "Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure."
    },
    "source": "https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/Schutzprofile/Uebergangsregelung-PP-0073_und_TR-03109-1.pdf?__blob=publicationFile"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/mastrv-zerez-id-netzbetreiber-2027/neu/2026-11-22",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastrv-zerez-id-netzbetreiber-2027",
   "title": "Added: Market master data register: new data annex with ZEREZ ID applies (third MaStRV amendment)",
   "content_text": "Added: Date 1 April 2027.\n\nFrom 1 April 2027 the new annex to the Market Master Data Register Ordinance applies. Network operators then enter, as a mandatory field, the identification number from the central register for unit and component certificates (ZEREZ ID) for units commissioned from 1 January 2026; plug-in solar devices are exempt.\n\nSource: https://www.recht.bund.de/bgbl/1/2026/291/regelungstext.pdf\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-22T00:00:00Z",
   "tags": [
    "neu",
    "NB-S",
    "AB"
   ],
   "_innobu": {
    "frist": "mastrv-zerez-id-netzbetreiber-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-04-01",
     "status": "fest",
     "title": {
      "de": "Marktstammdatenregister: neue Datenanlage mit ZEREZ-ID gilt (Dritte MaStRV-Änderung)",
      "en": "Market master data register: new data annex with ZEREZ ID applies (third MaStRV amendment)"
     }
    },
    "source": "https://www.recht.bund.de/bgbl/1/2026/291/regelungstext.pdf"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/grundversorgung-preisaenderung-2028/neu/2026-11-22",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#grundversorgung-preisaenderung-2028",
   "title": "Added: Price change on 1 January 2028: notice deadline in default supply",
   "content_text": "Added: Date 20 November 2027.\n\nDefault suppliers changing their general prices on 1 January 2028 must publish the change at least six weeks in advance, notify customers by letter and post it online. For household customers on special contracts, Section 41(5) EnWG sets a one month notice period.\n\nSource: https://www.gesetze-im-internet.de/stromgvv/__5.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-22T00:00:00Z",
   "tags": [
    "neu",
    "LF"
   ],
   "_innobu": {
    "frist": "grundversorgung-preisaenderung-2028",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-11-20",
     "status": "fest",
     "title": {
      "de": "Preisänderung zum 1. Januar 2028: Bekanntgabefrist in der Grundversorgung",
      "en": "Price change on 1 January 2028: notice deadline in default supply"
     }
    },
    "source": "https://www.gesetze-im-internet.de/stromgvv/__5.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/bnetza-quartalsabfrage-vnb-2027-02/neu/2026-11-22",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#bnetza-quartalsabfrage-vnb-2027-02",
   "title": "Added: Federal Network Agency quarterly survey: report supplier switches and disconnections for the fourth quarter of 2026",
   "content_text": "Added: Date 15 February 2027.\n\nElectricity and gas DSOs send the Federal Network Agency monthly data on supplier switches and disconnections via MonEDa, for each quarter by the 15th of the second following month at the latest; for the fourth quarter of 2026 by 15 February 2027, then 15 May, 15 August and 15 November. The survey form is filled in on a rolling basis and earlier quarters' values stay in it.\n\nSource: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/AbfrageVNB/artikel.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-22T00:00:00Z",
   "tags": [
    "neu",
    "NB-S",
    "NB-G"
   ],
   "_innobu": {
    "frist": "bnetza-quartalsabfrage-vnb-2027-02",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-02-15",
     "status": "fest",
     "title": {
      "de": "Quartalsabfrage der Bundesnetzagentur: Lieferantenwechsel und Sperrungen für das vierte Quartal 2026 melden",
      "en": "Federal Network Agency quarterly survey: report supplier switches and disconnections for the fourth quarter of 2026"
     }
    },
    "source": "https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/AbfrageVNB/artikel.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/bk8-redispatch-ausgleich-konsultation/pflicht/2026-11-22",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-redispatch-ausgleich-konsultation",
   "title": "Obligation text changed: Redispatch without balancing: consultation on cost reimbursement closes",
   "content_text": "Obligation text changed.\n\nBefore: Ruling Chamber 8 is consulting on how DSOs pay plant operators compensation when redispatch measures are not balanced: under the draft, per MWh of curtailed energy, a blended price of 72.5 percent ID-AEP and 27.5 percent reBAP plus a flat EUR 1.35/MWh, with a negative blended price triggering a payment by the plant operator. Comments are due by 21 October 2026, with the final ruling targeted by year end.\n\nRuling Chamber 8 consulted until 21 October 2026 on how DSOs pay plant operators compensation when redispatch measures are not balanced: under the draft, per MWh of curtailed energy, a blended price of 72.5 percent ID-AEP and 27.5 percent reBAP plus a flat EUR 1.35/MWh, with a negative blended price triggering a payment by the plant operator. The comments have been published; the final ruling was still pending on 22 November 2026.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-001/BK8-26-0001-A_Konsultation_Festlegungsentwurf.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-22T00:00:00Z",
   "tags": [
    "pflicht",
    "NB-S",
    "AB"
   ],
   "_innobu": {
    "frist": "bk8-redispatch-ausgleich-konsultation",
    "kind": "pflicht",
    "old": {
     "de": "Die Beschlusskammer 8 konsultiert, wie Verteilnetzbetreiber Anlagenbetreibern einen Aufwendungsersatz zahlen, wenn sie Redispatch-Maßnahmen nicht bilanziell ausgleichen: nach dem Entwurf je MWh Ausfallarbeit ein Mischpreis aus 72,5 Prozent ID-AEP und 27,5 Prozent reBAP plus 1,35 Euro/MWh Pauschale, wobei ein negativer Mischpreis eine Zahlung des Anlagenbetreibers auslöst. Stellungnahmen bis 21. Oktober 2026, die Festlegung ist bis Jahresende angestrebt.",
     "en": "Ruling Chamber 8 is consulting on how DSOs pay plant operators compensation when redispatch measures are not balanced: under the draft, per MWh of curtailed energy, a blended price of 72.5 percent ID-AEP and 27.5 percent reBAP plus a flat EUR 1.35/MWh, with a negative blended price triggering a payment by the plant operator. Comments are due by 21 October 2026, with the final ruling targeted by year end."
    },
    "new": {
     "de": "Die Beschlusskammer 8 hat bis 21. Oktober 2026 konsultiert, wie Verteilnetzbetreiber Anlagenbetreibern einen Aufwendungsersatz zahlen, wenn sie Redispatch-Maßnahmen nicht bilanziell ausgleichen: nach dem Entwurf je MWh Ausfallarbeit ein Mischpreis aus 72,5 Prozent ID-AEP und 27,5 Prozent reBAP plus 1,35 Euro/MWh Pauschale, wobei ein negativer Mischpreis eine Zahlung des Anlagenbetreibers auslöst. Die Stellungnahmen sind veröffentlicht, die finale Festlegung stand am 22. November 2026 noch aus.",
     "en": "Ruling Chamber 8 consulted until 21 October 2026 on how DSOs pay plant operators compensation when redispatch measures are not balanced: under the draft, per MWh of curtailed energy, a blended price of 72.5 percent ID-AEP and 27.5 percent reBAP plus a flat EUR 1.35/MWh, with a negative blended price triggering a payment by the plant operator. The comments have been published; the final ruling was still pending on 22 November 2026."
    },
    "source": "https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-001/BK8-26-0001-A_Konsultation_Festlegungsentwurf.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/bk8-redispatch-aufwendungsersatz-2027/neu/2026-11-22",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-redispatch-aufwendungsersatz-2027",
   "title": "Added: Redispatch without balancing: compensation and cost pass-through under BK8-26-001-A",
   "content_text": "Added: Date 1 January 2027.\n\nUnder the draft ruling, from 1 January 2027 DSOs pay plant operators compensation for redispatch measures without balancing, pass these costs through as volatile cost shares and publish the curtailed energy for each calendar quarter no later than three months after quarter end. The deductible for late advance notice first applies to calendar year 2028.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-001/Downloads/BK8-26-001-A_Festlegungsentwurf_DL_BF.pdf?__blob=publicationFile&v=4\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-22T00:00:00Z",
   "tags": [
    "neu",
    "NB-S",
    "AB"
   ],
   "_innobu": {
    "frist": "bk8-redispatch-aufwendungsersatz-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-01-01",
     "status": "geplant",
     "title": {
      "de": "Redispatch ohne bilanziellen Ausgleich: Aufwendungsersatz und Kostenwälzung nach BK8-26-001-A",
      "en": "Redispatch without balancing: compensation and cost pass-through under BK8-26-001-A"
     }
    },
    "source": "https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-001/Downloads/BK8-26-001-A_Festlegungsentwurf_DL_BF.pdf?__blob=publicationFile&v=4"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/bk6-offshore-gebotsverfahren-konsultation-2026-12/neu/2026-11-22",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk6-offshore-gebotsverfahren-konsultation-2026-12",
   "title": "Added: Offshore wind: consultation on the dynamic bidding procedure rules from 2027 closes (BK6-26-477)",
   "content_text": "Added: Date 4 December 2026.\n\nRuling Chamber 6 is consulting on its draft rules for the two-stage dynamic bidding procedure in offshore wind tenders from 2027: bid steps with one decimal place, a step of 0.2 ct/kWh per round (0.1 ct/kWh with two bidders) and intermediate-round bids. Comments are due by 4 December 2026; the rules only become binding when the tender is announced after the amended Offshore Wind Act enters into force.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2026/BK6-26-477/BK6-26-477_konsultation.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-22T00:00:00Z",
   "tags": [
    "neu",
    "AB"
   ],
   "_innobu": {
    "frist": "bk6-offshore-gebotsverfahren-konsultation-2026-12",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2026-12-04",
     "status": "fest",
     "title": {
      "de": "Windenergie auf See: Ende der Konsultation zu den Regeln des dynamischen Gebotsverfahrens ab 2027 (BK6-26-477)",
      "en": "Offshore wind: consultation on the dynamic bidding procedure rules from 2027 closes (BK6-26-477)"
     }
    },
    "source": "https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2026/BK6-26-477/BK6-26-477_konsultation.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/wasserstoff-kernnetz-entgelt-veroeffentlichung-2027/neu/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasserstoff-kernnetz-entgelt-veroeffentlichung-2027",
   "title": "Added: Hydrogen core network: publish the network charge for the following year",
   "content_text": "Added: Date 1 November 2027.\n\nOperators of the hydrogen core network publish the network charge, during the ramp-up phase the ramp-up charge, by 1 November for the following calendar year and correct the publication without delay if the charge changes afterwards (WANDA, GBK-24-01-2#1, operative point 2 sentences 3 and 4, operative point 3).\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2024/GBK-24-01-2x1_WANDA/Downloads/Wanda_Festlegung.pdf?__blob=publicationFile\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "neu",
    "NB-G",
    "LF"
   ],
   "_innobu": {
    "frist": "wasserstoff-kernnetz-entgelt-veroeffentlichung-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-11-01",
     "status": "fest",
     "title": {
      "de": "Wasserstoff-Kernnetz: Netzentgelt für das Folgejahr veröffentlichen",
      "en": "Hydrogen core network: publish the network charge for the following year"
     }
    },
    "source": "https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2024/GBK-24-01-2x1_WANDA/Downloads/Wanda_Festlegung.pdf?__blob=publicationFile"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/status/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027",
   "title": "Status changed: VDE-AR-N 4105:2026-03: end of the transition period",
   "content_text": "Status changed: date open → fixed.\n\nSource: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "status",
    "NB-S",
    "wMSB"
   ],
   "_innobu": {
    "frist": "vde-ar-n-4105-uebergang-2027",
    "kind": "status",
    "old": "offen",
    "new": "fest",
    "source": "https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/pflicht/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027",
   "title": "Obligation text changed: VDE-AR-N 4105:2026-03: end of the transition period",
   "content_text": "Obligation text changed.\n\nBefore: The 2026-03 edition replaces the 2018-11 edition. The end of the transition period on 1 March 2027 does not come from the standards body; according to VDE FNN, certificates under the 2018-11 edition remain sufficient until one of two periods expires: 12 months after DIN VDE V 0124-100 takes effect or 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.\n\nThe 2026-03 edition replaces the 2018-11 edition. According to VDE FNN, the transition period of VDE-AR-N 4105 ends on 1 March 2027; after that, unit certificates under the 2026 edition are required in principle. Because the revised DIN VDE V 0124-100 is not expected to be available by then, VDE FNN accepts unit certificates under the 2018-11 edition until the end of the transition period under Section 9.2: up to 12 months after the revised DIN VDE V 0124-100 takes effect, and at the latest up to 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.\n\nSource: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "pflicht",
    "NB-S",
    "wMSB"
   ],
   "_innobu": {
    "frist": "vde-ar-n-4105-uebergang-2027",
    "kind": "pflicht",
    "old": {
     "de": "Die Fassung 2026-03 ersetzt die Fassung 2018-11. Das Ende der Übergangszeit am 01.03.2027 stammt nicht vom Normgeber; nach VDE FNN genügen Zertifikate nach der Fassung 2018-11 noch bis zum Ablauf einer von zwei Fristen: 12 Monate nach Inkrafttreten der DIN VDE V 0124-100 oder 24 Monate nach Inkraftsetzung der Anwendungsregel. Technische Anschlussbedingungen, Anmeldeformulare (F.1.1, F.1.2) und die Anschlussbeurteilung bis 500 kW sind auf die neue Fassung umzustellen.",
     "en": "The 2026-03 edition replaces the 2018-11 edition. The end of the transition period on 1 March 2027 does not come from the standards body; according to VDE FNN, certificates under the 2018-11 edition remain sufficient until one of two periods expires: 12 months after DIN VDE V 0124-100 takes effect or 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition."
    },
    "new": {
     "de": "Die Fassung 2026-03 ersetzt die Fassung 2018-11. Nach VDE FNN läuft die Übergangsfrist der VDE-AR-N 4105 am 01.03.2027 aus; danach sind grundsätzlich Einheitenzertifikate nach der Fassung 2026 vorzulegen. Weil die überarbeitete DIN VDE V 0124-100 bis dahin voraussichtlich nicht vorliegt, akzeptiert VDE FNN Einheitenzertifikate nach der Fassung 2018-11 bis zum Ende der Übergangsfrist nach Abschnitt 9.2: bis 12 Monate nach Inkraftsetzung der überarbeiteten DIN VDE V 0124-100, spätestens bis 24 Monate nach Inkraftsetzung der Anwendungsregel. Technische Anschlussbedingungen, Anmeldeformulare (F.1.1, F.1.2) und die Anschlussbeurteilung bis 500 kW sind auf die neue Fassung umzustellen.",
     "en": "The 2026-03 edition replaces the 2018-11 edition. According to VDE FNN, the transition period of VDE-AR-N 4105 ends on 1 March 2027; after that, unit certificates under the 2026 edition are required in principle. Because the revised DIN VDE V 0124-100 is not expected to be available by then, VDE FNN accepts unit certificates under the 2018-11 edition until the end of the transition period under Section 9.2: up to 12 months after the revised DIN VDE V 0124-100 takes effect, and at the latest up to 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition."
    },
    "source": "https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/ustg-e-rechnung-uebergang-2027/neu/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#ustg-e-rechnung-uebergang-2027",
   "title": "Added: E-invoicing: paper and other formats from 2027 only up to EUR 800,000 prior-year turnover or via EDI",
   "content_text": "Added: Date 1 January 2027.\n\nFor supplies from 1 January 2027, businesses may only send invoices to other businesses on paper or, with the recipient's consent, in a format not complying with EN 16931 if their total turnover in the previous year was no more than EUR 800,000, or as an EDI invoice with the recipient's consent. Both exceptions end on 31 December 2027 (Section 27(38) UStG).\n\nSource: https://www.gesetze-im-internet.de/ustg_1980/__27.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "neu",
    "NB-S",
    "NB-G",
    "gMSB",
    "LF"
   ],
   "_innobu": {
    "frist": "ustg-e-rechnung-uebergang-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-01-01",
     "status": "fest",
     "title": {
      "de": "E-Rechnung: Papier und andere Formate ab 2027 nur noch bis 800.000 Euro Vorjahresumsatz oder per EDI",
      "en": "E-invoicing: paper and other formats from 2027 only up to EUR 800,000 prior-year turnover or via EDI"
     }
    },
    "source": "https://www.gesetze-im-internet.de/ustg_1980/__27.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027",
   "title": "Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029",
   "content_text": "Obligation text changed.\n\nBefore: Under the government bill, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d draft EnWG) that lowers transmission network charges; the Bundesrat calls for EUR 6.5 billion, so the amount is open. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) draft EnWG).\n\nUnder the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).\n\nSource: https://dserver.bundestag.de/btd/21/082/2108236.pdf\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "pflicht",
    "NB-S",
    "UENB",
    "LF"
   ],
   "_innobu": {
    "frist": "uenb-zuschuss-2027",
    "kind": "pflicht",
    "old": {
     "de": "Nach dem Regierungsentwurf erhalten die Übertragungsnetzbetreiber 2027 bis 2029 je 5,525 Milliarden Euro Zuschuss (§ 24d EnWG-E), der die Übertragungsnetzentgelte senkt; der Bundesrat fordert 6,5 Milliarden Euro, die Höhe ist offen. Die Übertragungsnetzbetreiber veröffentlichen ihr Entgelt mit und ohne Zuschuss, Verteilnetzbetreiber zusätzlich ein fiktives Netzentgelt ohne Zuschuss, und Lieferanten weisen in der Rechnung auf den Zuschuss hin (§ 118 Abs. 5b EnWG-E).",
     "en": "Under the government bill, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d draft EnWG) that lowers transmission network charges; the Bundesrat calls for EUR 6.5 billion, so the amount is open. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) draft EnWG)."
    },
    "new": {
     "de": "Nach dem Gesetzesbeschluss des Bundestages vom 12.11.2026 erhalten die Übertragungsnetzbetreiber 2027 bis 2029 je 5,525 Milliarden Euro Zuschuss (§ 24d EnWG), der die Übertragungsnetzentgelte senkt; der Bundesrat berät im zweiten Durchgang bis 04.12.2026. Die Übertragungsnetzbetreiber veröffentlichen ihr Entgelt mit und ohne Zuschuss, Verteilnetzbetreiber zusätzlich ein fiktives Netzentgelt ohne Zuschuss, und Lieferanten weisen in der Rechnung auf den Zuschuss hin (§ 118 Abs. 5b EnWG).",
     "en": "Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat has until 4 December 2026 for its second reading. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG)."
    },
    "source": "https://dserver.bundestag.de/btd/21/082/2108236.pdf"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/stromst-energiest-schaetzung-2027/pflicht/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromst-energiest-schaetzung-2027",
   "title": "Obligation text changed: Electricity and energy tax: estimate of 2027 annual tax by 15 January",
   "content_text": "Obligation text changed.\n\nBefore: Suppliers with annual returns and advance payments send the main customs office, by 15 January, a sound and traceable estimate of the expected annual tax; below 2,400 euros no notice is needed. On 30 June they estimate again and report by 15 August if the new estimate exceeds 100,000 euros and exceeds the set advance payments by more than 20 per cent (Section 8(6) StromStG, Section 39(5) EnergieStG).\n\nSuppliers with annual returns and advance payments send the main customs office, by 15 January, a sound and traceable estimate of the expected annual tax; below 2,400 euros the estimate is only sent on request of the customs office. On 30 June they estimate again and send it on request, and without request by 15 August if it exceeds 100,000 euros and the annual tax underlying the advance payments by more than 20 per cent (Section 8(6) StromStG, Section 39(5) EnergieStG).\n\nSource: https://www.gesetze-im-internet.de/stromstg/__8.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "pflicht",
    "LF"
   ],
   "_innobu": {
    "frist": "stromst-energiest-schaetzung-2027",
    "kind": "pflicht",
    "old": {
     "de": "Versorger mit jährlicher Anmeldung und Vorauszahlungen teilen dem Hauptzollamt bis zum 15. Januar eine sachgerechte, nachvollziehbare Schätzung der voraussichtlichen Jahressteuerschuld mit; liegt sie unter 2.400 Euro, entfällt die Mitteilung. Zum 30. Juni schätzen sie erneut und melden bis 15. August, wenn die neue Schätzung 100.000 Euro übersteigt und die festgesetzten Vorauszahlungen um mehr als 20 Prozent übersteigt (§ 8 Abs. 6 StromStG, § 39 Abs. 5 EnergieStG).",
     "en": "Suppliers with annual returns and advance payments send the main customs office, by 15 January, a sound and traceable estimate of the expected annual tax; below 2,400 euros no notice is needed. On 30 June they estimate again and report by 15 August if the new estimate exceeds 100,000 euros and exceeds the set advance payments by more than 20 per cent (Section 8(6) StromStG, Section 39(5) EnergieStG)."
    },
    "new": {
     "de": "Versorger mit jährlicher Anmeldung und Vorauszahlungen teilen dem Hauptzollamt bis zum 15. Januar eine sachgerechte, nachvollziehbare Schätzung der voraussichtlichen Jahressteuerschuld mit; liegt sie unter 2.400 Euro, ist sie nur auf Verlangen des Hauptzollamts mitzuteilen. Zum 30. Juni schätzen sie erneut und teilen die Schätzung auf Verlangen mit, ohne Verlangen bis 15. August, wenn sie 100.000 Euro und die den Vorauszahlungen zugrunde gelegte Jahressteuerschuld um mehr als 20 Prozent übersteigt (§ 8 Abs. 6 StromStG, § 39 Abs. 5 EnergieStG).",
     "en": "Suppliers with annual returns and advance payments send the main customs office, by 15 January, a sound and traceable estimate of the expected annual tax; below 2,400 euros the estimate is only sent on request of the customs office. On 30 June they estimate again and send it on request, and without request by 15 August if it exceeds 100,000 euros and the annual tax underlying the advance payments by more than 20 per cent (Section 8(6) StromStG, Section 39(5) EnergieStG)."
    },
    "source": "https://www.gesetze-im-internet.de/stromstg/__8.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/mispel-festlegung/pflicht/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#mispel-festlegung",
   "title": "Obligation text changed: MiSpeL: ruling on market integration of storage and charging points",
   "content_text": "Obligation text changed.\n\nBefore: The Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges.\n\nThe Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges. The ruling was published in the Official Gazette on 7 October 2026 and takes effect upon notification (operative point 8).\n\nSource: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Aufsicht/MiSpeL/start.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "pflicht",
    "NB-S",
    "gMSB",
    "LF",
    "SPB",
    "CPO"
   ],
   "_innobu": {
    "frist": "mispel-festlegung",
    "kind": "pflicht",
    "old": {
     "de": "Die Bundesnetzagentur hat die Festlegung am 1. Oktober 2026 beschlossen (Az. 618-25-02). Abgrenzungsoption und Pauschaloption regeln, wie bei Speichern und Ladepunkten in gemischter Nutzung die Strommengen für EEG-Förderung und Umlageprivilegien getrennt werden.",
     "en": "The Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges."
    },
    "new": {
     "de": "Die Bundesnetzagentur hat die Festlegung am 1. Oktober 2026 beschlossen (Az. 618-25-02). Abgrenzungsoption und Pauschaloption regeln, wie bei Speichern und Ladepunkten in gemischter Nutzung die Strommengen für EEG-Förderung und Umlageprivilegien getrennt werden. Die Festlegung erschien am 07.10.2026 im Amtsblatt und wirkt mit der Bekanntgabe (Tenorziffer 8).",
     "en": "The Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges. The ruling was published in the Official Gazette on 7 October 2026 and takes effect upon notification (operative point 8)."
    },
    "source": "https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Aufsicht/MiSpeL/start.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/geli-gas-2/pflicht/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#geli-gas-2",
   "title": "Obligation text changed: GeLi Gas 2.0 applies",
   "content_text": "Obligation text changed.\n\nBefore: New supplier switch processes for gas, UTILMD Gas 1.1.\n\nNew supplier switch processes for gas, since 1 October 2026 in the UTILMD Gas 1.2 format (AHB and MIG).\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2019/BK7-19-0001/BK7-19-0001_Beschluss_Internet.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "pflicht",
    "NB-G",
    "LF"
   ],
   "_innobu": {
    "frist": "geli-gas-2",
    "kind": "pflicht",
    "old": {
     "de": "Neue Lieferantenwechselprozesse im Gas, UTILMD Gas 1.1.",
     "en": "New supplier switch processes for gas, UTILMD Gas 1.1."
    },
    "new": {
     "de": "Neue Lieferantenwechselprozesse im Gas, seit 01.10.2026 im Format UTILMD Gas 1.2 (AHB und MIG).",
     "en": "New supplier switch processes for gas, since 1 October 2026 in the UTILMD Gas 1.2 format (AHB and MIG)."
    },
    "source": "https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2019/BK7-19-0001/BK7-19-0001_Beschluss_Internet.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/enwg-42d-gaskennzeichnung-restmix-2027/neu/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-42d-gaskennzeichnung-restmix-2027",
   "title": "Added: Gas and hydrogen disclosure on the bill: residual energy mix of the previous year (draft Section 42d EnWG)",
   "content_text": "Added: Date 1 July 2027.\n\nUnder the government bill on the gas and hydrogen internal market package, suppliers of gas or hydrogen state the energy mix with CO2 data on or with the bill to final customers. The duty starts when the act enters into force on the day after promulgation; from 1 July 2027 the flat-rate wording is no longer allowed and shares without proof must be shown with the previous year's residual energy mix.\n\nSource: https://dserver.bundestag.de/btd/21/054/2105440.pdf\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "neu",
    "LF"
   ],
   "_innobu": {
    "frist": "enwg-42d-gaskennzeichnung-restmix-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-07-01",
     "status": "geplant",
     "title": {
      "de": "Gas- und Wasserstoffkennzeichnung auf der Rechnung: Restenergieträgermix des Vorjahres (§ 42d EnWG-E)",
      "en": "Gas and hydrogen disclosure on the bill: residual energy mix of the previous year (draft Section 42d EnWG)"
     }
    },
    "source": "https://dserver.bundestag.de/btd/21/054/2105440.pdf"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/enwg-35m-gasreserve-umlage-2027/neu/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-35m-gasreserve-umlage-2027",
   "title": "Added: Gas reserve (government draft): levy on balancing group managers from 1 October 2027",
   "content_text": "Added: Date 1 October 2027.\n\nUnder the government draft, subject to the Bundestag's decision: from the first levy period starting on 1 October 2027, the market area manager passes the costs of the gas reserve on to balancing group managers, per megawatt hour withdrawn at points with interval metering and with standard load profiles. It sets the levy anew for each yearly period starting on 1 October, bills monthly, may charge instalments and publishes the levy six weeks before each levy period starts; in basic gas supply the levy becomes a price component.\n\nSource: https://dserver.bundestag.de/brd/2026/0652-26.pdf\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "neu",
    "LF",
    "BKV"
   ],
   "_innobu": {
    "frist": "enwg-35m-gasreserve-umlage-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-10-01",
     "status": "geplant",
     "title": {
      "de": "Gasreserve (Regierungsentwurf): Umlage auf Bilanzkreisverantwortliche ab 1. Oktober 2027",
      "en": "Gas reserve (government draft): levy on balancing group managers from 1 October 2027"
     }
    },
    "source": "https://dserver.bundestag.de/brd/2026/0652-26.pdf"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/enwg-14d-regionalszenario-2027/neu/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-14d-regionalszenario-2027",
   "title": "Added: Regional scenario of the planning region for the 2028 network expansion plan",
   "content_text": "Added: Date 31 December 2027.\n\nThe distribution system operators of a planning region finalise their joint regional scenario, involving the transmission system operators, at least ten months before the network expansion plan is due and submit it to the Federal Network Agency. For the plan due on 31 October 2028 that means 31 December 2027.\n\nSource: https://www.gesetze-im-internet.de/enwg_2005/__14d.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "neu",
    "NB-S",
    "UENB"
   ],
   "_innobu": {
    "frist": "enwg-14d-regionalszenario-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-12-31",
     "status": "fest",
     "title": {
      "de": "Regionalszenario der Planungsregion für den Netzausbauplan 2028",
      "en": "Regional scenario of the planning region for the 2028 network expansion plan"
     }
    },
    "source": "https://www.gesetze-im-internet.de/enwg_2005/__14d.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/engpasserloese-verwendung-plan-2027/pflicht/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#engpasserloese-verwendung-plan-2027",
   "title": "Obligation text changed: Congestion income 2027: report the planned use to the Federal Network Agency",
   "content_text": "Obligation text changed.\n\nBefore: Transmission system operators tell the Federal Network Agency by 31 October how they plan to use the 2027 congestion income from allocating cross-zonal capacity. The basis is Article 4 of the ACER methodology on the use of congestion income under Article 19 of Regulation (EU) 2019/943.\n\nTransmission system operators had to tell the Federal Network Agency by 31 October 2026 how they planned to use the 2027 congestion income from allocating cross-zonal capacity. The basis is Article 4 of the ACER methodology on the use of congestion income under Article 19 of Regulation (EU) 2019/943.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK08/BK8_04_InfoRundschr/41_Rundschr/Downloads/Fristenkalender_Netzbetreiber_Netzentgelte_Elektrizitaet_2026.pdf\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "pflicht",
    "UENB"
   ],
   "_innobu": {
    "frist": "engpasserloese-verwendung-plan-2027",
    "kind": "pflicht",
    "old": {
     "de": "Übertragungsnetzbetreiber übermitteln der Bundesnetzagentur bis zum 31. Oktober, wie sie die Engpasserlöse aus der Vergabe grenzüberschreitender Kapazität im Jahr 2027 verwenden wollen. Grundlage ist Artikel 4 der ACER-Methodik zur Verwendung von Engpasserlösen nach Artikel 19 der Verordnung (EU) 2019/943.",
     "en": "Transmission system operators tell the Federal Network Agency by 31 October how they plan to use the 2027 congestion income from allocating cross-zonal capacity. The basis is Article 4 of the ACER methodology on the use of congestion income under Article 19 of Regulation (EU) 2019/943."
    },
    "new": {
     "de": "Übertragungsnetzbetreiber mussten der Bundesnetzagentur bis zum 31. Oktober 2026 übermitteln, wie sie die Engpasserlöse aus der Vergabe grenzüberschreitender Kapazität im Jahr 2027 verwenden wollen. Grundlage ist Artikel 4 der ACER-Methodik zur Verwendung von Engpasserlösen nach Artikel 19 der Verordnung (EU) 2019/943.",
     "en": "Transmission system operators had to tell the Federal Network Agency by 31 October 2026 how they planned to use the 2027 congestion income from allocating cross-zonal capacity. The basis is Article 4 of the ACER methodology on the use of congestion income under Article 19 of Regulation (EU) 2019/943."
    },
    "source": "https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK08/BK8_04_InfoRundschr/41_Rundschr/Downloads/Fristenkalender_Netzbetreiber_Netzentgelte_Elektrizitaet_2026.pdf"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/co2kostaufg-biogener-anteil-rechnung-2029/neu/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#co2kostaufg-biogener-anteil-rechnung-2029",
   "title": "Added: Bill: show the price component for the mandatory biogenic share under Section 43 GModG (Section 3(1) no. 6 CO2KostAufG)",
   "content_text": "Added: Date 1 January 2029.\n\nFuel suppliers delivering to buildings with rented housing whose heating falls under Section 43(1) GModG show the price component for the mandatory biogenic share separately on the bill. The rule has applied since 29 July 2026; in practice it bites from 1 January 2029 with the first 10 percent step.\n\nSource: https://www.gesetze-im-internet.de/co2kostaufg/__3.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "neu",
    "LF"
   ],
   "_innobu": {
    "frist": "co2kostaufg-biogener-anteil-rechnung-2029",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2029-01-01",
     "status": "fest",
     "title": {
      "de": "Rechnung: Preisbestandteil für den biogenen Pflichtanteil nach § 43 GModG ausweisen (§ 3 Abs. 1 Nr. 6 CO2KostAufG)",
      "en": "Bill: show the price component for the mandatory biogenic share under Section 43 GModG (Section 3(1) no. 6 CO2KostAufG)"
     }
    },
    "source": "https://www.gesetze-im-internet.de/co2kostaufg/__3.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/bk8-kostenpruefung-ausgangsniveau-unterlagen-2027/neu/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-kostenpruefung-ausgangsniveau-unterlagen-2027",
   "title": "Added: Electricity cost review from 2029: submit documents for the starting level (draft determination BK8-26-04#7 to #12)",
   "content_text": "Added: Date 1 July 2027.\n\nUnder the draft determination, electricity DSOs submit all documents for determining the starting level of the fifth regulatory period to the Federal Network Agency in full by 1 July 2027; with an approved simplified procedure by 30 September 2027.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-004/BK8-26-004x7bis12/Anlagen/BK8-26-004x7bis12_Anlage1_DL_BF.pdf\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "neu",
    "NB-S"
   ],
   "_innobu": {
    "frist": "bk8-kostenpruefung-ausgangsniveau-unterlagen-2027",
    "kind": "neu",
    "old": null,
    "new": {
     "date": "2027-07-01",
     "status": "geplant",
     "title": {
      "de": "Kostenprüfung Strom ab 2029: Unterlagen für das Ausgangsniveau einreichen (Festlegungsentwurf BK8-26-04#7 bis #12)",
      "en": "Electricity cost review from 2029: submit documents for the starting level (draft determination BK8-26-04#7 to #12)"
     }
    },
    "source": "https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-004/BK8-26-004x7bis12/Anlagen/BK8-26-004x7bis12_Anlage1_DL_BF.pdf"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/bk8-effizienzvergleich-datenerhebung-konsultation/pflicht/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-effizienzvergleich-datenerhebung-konsultation",
   "title": "Obligation text changed: Electricity efficiency benchmarking: data collection consultation closes",
   "content_text": "Obligation text changed.\n\nBefore: Ruling Chamber 8 is consulting on which data electricity DSOs must supply for the efficiency benchmarking of the fifth regulatory period. Comments are due by 26 October 2026; the data collection follows afterwards.\n\nRuling Chamber 8 consulted on which data electricity DSOs must supply for the efficiency benchmarking of the fifth regulatory period. The comment period closed on 26 October 2026; the final determination is still pending.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-004/BK8-26-004x13/BK8-26-004x13_Einleitung_Konsultation.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "pflicht",
    "NB-S"
   ],
   "_innobu": {
    "frist": "bk8-effizienzvergleich-datenerhebung-konsultation",
    "kind": "pflicht",
    "old": {
     "de": "Die Beschlusskammer 8 konsultiert, welche Daten Stromverteilnetzbetreiber für den Effizienzvergleich der fünften Regulierungsperiode liefern. Stellungnahmen bis 26. Oktober 2026, die Erhebung selbst folgt danach.",
     "en": "Ruling Chamber 8 is consulting on which data electricity DSOs must supply for the efficiency benchmarking of the fifth regulatory period. Comments are due by 26 October 2026; the data collection follows afterwards."
    },
    "new": {
     "de": "Die Beschlusskammer 8 hat konsultiert, welche Daten Stromverteilnetzbetreiber für den Effizienzvergleich der fünften Regulierungsperiode liefern. Die Frist für Stellungnahmen endete am 26. Oktober 2026; die Festlegung steht noch aus.",
     "en": "Ruling Chamber 8 consulted on which data electricity DSOs must supply for the efficiency benchmarking of the fifth regulatory period. The comment period closed on 26 October 2026; the final determination is still pending."
    },
    "source": "https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-004/BK8-26-004x13/BK8-26-004x13_Einleitung_Konsultation.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/agnes-dynamisches-netzentgelt-speicher-2033/folge/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-dynamisches-netzentgelt-speicher-2033",
   "title": "Legal consequence changed: AgNes: dynamic network charge for battery storage at levels 1 to 5",
   "content_text": "Legal consequence changed: Regulator can enforce → Fine possible.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&v=7\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "folge",
    "NB-S",
    "UENB",
    "SPB"
   ],
   "_innobu": {
    "frist": "agnes-dynamisches-netzentgelt-speicher-2033",
    "kind": "folge",
    "old": "aufsicht",
    "new": "bussgeld",
    "source": "https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&v=7"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/agnes-dynamisches-netzentgelt-erzeuger-2035/folge/2026-11-15",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-dynamisches-netzentgelt-erzeuger-2035",
   "title": "Legal consequence changed: AgNes: dynamic network charge for generation plants at levels 1 to 5",
   "content_text": "Legal consequence changed: Regulator can enforce → Fine possible.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&v=7\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-15T00:00:00Z",
   "tags": [
    "folge",
    "NB-S",
    "UENB",
    "AB"
   ],
   "_innobu": {
    "frist": "agnes-dynamisches-netzentgelt-erzeuger-2035",
    "kind": "folge",
    "old": "aufsicht",
    "new": "bussgeld",
    "source": "https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&v=7"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/wacc-gas-festlegung/termin/2026-11-11",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#wacc-gas-festlegung",
   "title": "Date moved: Gas WACC: the rate of return decision is issued",
   "content_text": "Date moved: 31 December 2026 → 30 September 2027.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK9-GZ/2026/2026_bis0999/BK9-26-0621/BK9-26-0621_Ank%C3%BCndigung_Verfahrensablauf.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-11T00:00:00Z",
   "tags": [
    "termin",
    "NB-G"
   ],
   "_innobu": {
    "frist": "wacc-gas-festlegung",
    "kind": "termin",
    "old": "2026-12-31",
    "new": "2027-09-30",
    "source": "https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK9-GZ/2026/2026_bis0999/BK9-26-0621/BK9-26-0621_Ank%C3%BCndigung_Verfahrensablauf.html"
   }
  },
  {
   "id": "tag:innobu.com,2026-11-24:fristen/wacc-gas-festlegung/pflicht/2026-11-11",
   "url": "https://www.innobu.com/en/deadline-calendar-energy-transition.html#wacc-gas-festlegung",
   "title": "Obligation text changed: Gas WACC: the rate of return decision is issued",
   "content_text": "Obligation text changed.\n\nBefore: The Bundesnetzagentur intends to set the flat-rate return on capital for gas grid operators by the end of 2026. Gas distribution operators then calculate the revenue caps of the fifth regulatory period from 2028 with the adopted rate.\n\nThe Bundesnetzagentur has announced that it will set the flat-rate return on capital for gas grid operators only in late summer 2027, using capital market data for 2026; an updated draft goes out for consultation in the second quarter of 2027. Gas distribution operators then calculate the revenue caps of the fifth regulatory period from 2028 with the adopted rate.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK9-GZ/2026/2026_bis0999/BK9-26-0621/BK9-26-0621_Ank%C3%BCndigung_Verfahrensablauf.html\n\nNote: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn't replace your own deadline review.",
   "date_published": "2026-11-11T00:00:00Z",
   "tags": [
    "pflicht",
    "NB-G"
   ],
   "_innobu": {
    "frist": "wacc-gas-festlegung",
    "kind": "pflicht",
    "old": {
     "de": "Die Bundesnetzagentur will die pauschalierte Kapitalverzinsung für Gasnetzbetreiber bis Ende 2026 festlegen. Gasverteilernetzbetreiber kalkulieren danach ihre Erlösobergrenzen der fünften Regulierungsperiode ab 2028 mit dem beschlossenen Satz.",
     "en": "The Bundesnetzagentur intends to set the flat-rate return on capital for gas grid operators by the end of 2026. Gas distribution operators then calculate the revenue caps of the fifth regulatory period from 2028 with the adopted rate."
    },
    "new": {
     "de": "Die Bundesnetzagentur legt die pauschalierte Kapitalverzinsung für Gasnetzbetreiber nach eigener Ankündigung erst im Spätsommer 2027 fest, mit den Kapitalmarktdaten des Jahres 2026; im zweiten Quartal 2027 konsultiert sie einen aktualisierten Entwurf. Gasverteilernetzbetreiber kalkulieren danach ihre Erlösobergrenzen der fünften Regulierungsperiode ab 2028 mit dem beschlossenen Satz.",
     "en": "The Bundesnetzagentur has announced that it will set the flat-rate return on capital for gas grid operators only in late summer 2027, using capital market data for 2026; an updated draft goes out for consultation in the second quarter of 2027. Gas distribution operators then calculate the revenue caps of the fifth regulatory period from 2028 with the adopted rate."
    },
    "source": "https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK9-GZ/2026/2026_bis0999/BK9-26-0621/BK9-26-0621_Ank%C3%BCndigung_Verfahrensablauf.html"
   }
  }
 ]
}
