<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
  <title>innobu deadline calendar: new and changed</title>
  <subtitle>Every change to the energy transition deadline calendar: deadlines added, dates moved, status changes, corrected obligations and legal consequences, with dates.</subtitle>
  <link rel="self" type="application/atom+xml" href="https://www.innobu.com/assets/feeds/fristen-aenderungen-en.xml"/>
  <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-changes.html"/>
  <id>https://www.innobu.com/assets/feeds/fristen-aenderungen-en.xml</id>
  <updated>2026-11-24T00:00:00Z</updated>
  <author><name>innobu GmbH</name><uri>https://www.innobu.com/</uri></author>
  <rights>A classification for typical market roles, not a review of your individual case and not legal advice. Whether an obligation applies to your company (thresholds, exemptions) is for your legal department or counsel to confirm. The calendar doesn&#x27;t replace your own deadline review.</rights>
  <entry>
    <title>Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat has until 4 December 2026 for its second reading. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Source: https://dserver.bundestag.de/btd/21/082/2108236.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Significant security incident: 24 hours, 72 hours, one month</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#sicherheitsvorfall-meldung-energienetz"/>
    <id>tag:innobu.com,2026-11-24:fristen/sicherheitsvorfall-meldung-energienetz/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 24 hours after; within 72 hours after; within 1 month after.

Operators of energy supply networks, energy installations and digital energy services under Section 5c(1) sentence 1 nos. 1 to 3 EnWG report a significant security incident to the reporting office under Section 32 BSIG as an early warning at the latest 24 hours after becoming aware of it, with an initial assessment at the latest 72 hours after becoming aware of it, and with a final report at the latest one month after that notification, or a progress report if the incident is still ongoing (Section 5d(3) EnWG, Section 32(2) BSIG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__5d.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Low-voltage grid connection: state the time needed within ten working days</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#nav6-zeitbedarf-netzanschluss"/>
    <id>tag:innobu.com,2026-11-24:fristen/nav6-zeitbedarf-netzanschluss/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 10 working days after.

The network operator tells the connectee the expected time needed without undue delay and at the latest ten working days after the order to establish the grid connection (Section 6(1) NAV).

Source: https://www.gesetze-im-internet.de/nav/__6.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Charging equipment above 12 kVA: network operator responds within two months</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#nav19-zustimmung-ladeeinrichtung"/>
    <id>tag:innobu.com,2026-11-24:fristen/nav19-zustimmung-ladeeinrichtung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 2 months after.

Where charging equipment needs the network operator&#x27;s consent because its total rated power exceeds 12 kVA per electrical installation, the network operator responds within two months of receiving the notification; if it refuses, it sets out the obstacle, possible remedies and the time needed for them (Section 19(2) NAV).

Source: https://www.gesetze-im-internet.de/nav/__19.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Market master data register: register a new market role</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-marktakteur-registrierung"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastr-marktakteur-registrierung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 1 month after.

Market actors register for each market function within one month of first acting in it; network operators without undue delay after their licence is notified (Section 3(2) MaStRV).

Source: https://www.gesetze-im-internet.de/mastrv/__3.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Market master data register: register a new plant</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-einheit-registrierung"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastr-einheit-registrierung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 1 month after.

Operators register units, for example for generation and storage, and EEG plants in the market master data register within one month of commissioning, and CHP plants within one month of starting or, after modernisation, resuming continuous operation (Section 5(5) MaStRV).

Source: https://www.gesetze-im-internet.de/mastrv/__5.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Market master data register: record changes</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-aenderung-registrieren"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastr-aenderung-registrieren/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 1 month after.

When recorded data change, the responsible party registers the change within one month of it occurring (Section 7(1) MaStRV).

Source: https://www.gesetze-im-internet.de/mastrv/__7.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Supplier switch within 24 hours</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#lieferantenwechsel-24-stunden"/>
    <id>tag:innobu.com,2026-11-24:fristen/lieferantenwechsel-24-stunden/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 24 hours after.

Since 1 January 2026, the technical process of switching energy supplier must be completed within 24 hours and be possible on every working day; a longer period is only allowed where the registration relates to a supply date further in the future (Section 20a(2) EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__20a.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Building Modernisation Act: confirm the biomethane or hydrogen share with the bill</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#gmodg-96-4-bestaetigung-biogener-anteil-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/gmodg-96-4-bestaetigung-biogener-anteil-2029/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2029.

From 2029, gas, oil and LPG heating systems newly installed in existing buildings must generate at least 10 percent of the heat supplied from biomethane, bio-oil, biogenic LPG or hydrogen (Section 43 GModG). Anyone supplying such buildings commercially with these fuels confirms to the customer with the bill that the requirements are met (Section 96(4) GModG).

Source: https://www.gesetze-im-internet.de/geg/__96.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Building Modernisation Act: operators of third-party heating systems ensure 10 percent heat from biomethane or hydrogen</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#gmodg-43-6-betreiber-biogener-anteil-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/gmodg-43-6-betreiber-biogener-anteil-2029/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2029.

Where a third party rather than the owner operates a gas, oil or LPG heating system installed in an existing building after 29 July 2026, the operator meets the obligation to generate at least 10 percent of the heat from biomethane, bio-oil, biogenic LPG or hydrogen from 2029 and at least 15 percent from 2030 (Section 43(1) and (6) GModG).

Source: https://www.gesetze-im-internet.de/geg/__43.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: District heating with CHP: new calculation method for published primary energy factors</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#gmodg-22-primaerenergiefaktor-fernwaerme-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/gmodg-22-primaerenergiefaktor-fernwaerme-2027/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

From 1 January 2027, builders may only use a primary energy factor published by the district heating supplier for heat from CHP plants if it was determined using the method of DIN EN 15316-4-5:2017-09 and the publication states this method; otherwise the district heating value in Annex 4 GModG applies (Section 22 GModG, amended by Article 2 of Federal Law Gazette 2026 I No. 226).

Source: https://www.recht.bund.de/bgbl/1/2026/226/regelungstext.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Data Act: data access built into the design of new connected products</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eu-data-act-art3-produktgestaltung-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/eu-data-act-art3-produktgestaltung-2026/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 13 September 2026.

Connected products and related services placed on the market after 12 September 2026 must be designed so that users can access their data, including metadata, by default easily, securely, free of charge, in a machine-readable format and, where relevant and technically feasible, directly (Article 3(1) and Article 50 of Regulation (EU) 2023/2854).

Source: https://eur-lex.europa.eu/eli/reg/2023/2854/oj/deu

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Notify the Federal Network Agency of supplying household customers</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg5-anzeige-belieferung"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg5-anzeige-belieferung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: without undue delay after.

Energy suppliers notify the Federal Network Agency without undue delay when they start supplying household customers (Section 5(1) and (2) EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__5.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Notify the end of supplying household customers</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg5-anzeige-beendigung"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg5-anzeige-beendigung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: at least 3 months before.

Energy suppliers notify the end of supply so that the notification reaches the Federal Network Agency at least three months before the planned end date, and do not stop earlier unless they have filed for insolvency (Section 5(2) EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__5.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Bill and final bill within six weeks</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg40c-rechnung-sechs-wochen"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg40c-rechnung-sechs-wochen/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 6 weeks after.

Energy suppliers provide final customers with the bill at the latest six weeks after the end of the billing period and with the final bill at the latest six weeks after the end of supply; for monthly billing under Section 40b(1) the deadline is three weeks (Section 40c(2) EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__40c.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Set up an energy or environmental management system (EnEfG amendment)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enefg-8-ems-novelle-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enefg-8-ems-novelle-2027/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 11 October 2027.

Under the government draft amending the EnEfG, companies with total final energy consumption above 23.6 GWh that reached this status by the end of 2025 set up an energy or environmental management system by 11 October 2027 (draft Section 8 EnEfG).

Source: https://dserver.bundestag.de/btd/21/080/2108027.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Waste heat: report to the Federal Office for Energy Efficiency by 31 March</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enefg-17-abwaerme-meldung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enefg-17-abwaerme-meldung-2027/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 March 2027.

Companies whose total final energy consumption averaged more than 2.5 GWh over the last three calendar years send the Federal Office for Energy Efficiency the information on their waste heat every year by 31 March and update it without delay when it changes (Section 17(2) EnEfG).

Source: https://www.gesetze-im-internet.de/enefg/__17.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Data centres: publish annual information and send it to the federal government (31 March)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enefg-13-rechenzentren-bericht-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enefg-13-rechenzentren-bericht-2027/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 March 2027.

Operators of data centres with a non-redundant rated connected load of 300 kW or more publish the information under Annex 3 EnEfG for the previous year every year by 31 March and send it to the federal government (Section 13(1) EnEfG).

Source: https://www.gesetze-im-internet.de/enefg/__13.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Data centres: power usage effectiveness (PUE) of 1.5 or lower</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enefg-11-rechenzentren-pue-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enefg-11-rechenzentren-pue-2027/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 July 2027.

Data centres of 300 kW or more that started operating before 1 July 2026 permanently reach an annual average power usage effectiveness of 1.5 or lower from 1 July 2027, and 1.3 or lower from 1 July 2030 (Section 11(1) EnEfG).

Source: https://www.gesetze-im-internet.de/enefg/__11.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Data centres: electricity demand met entirely from renewable sources</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enefg-11-5-rechenzentren-oekostrom-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enefg-11-5-rechenzentren-oekostrom-2027/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

From 1 January 2027, operators of data centres of 300 kW or more cover their electricity consumption entirely with electricity from renewable sources on a balance-sheet basis (Section 11(5) no. 2 EnEfG).

Source: https://www.gesetze-im-internet.de/enefg/__11.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG grid connection up to 30 kW: grid compatibility check result within one month</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg8-zeitplan-kleinanlagen"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg8-zeitplan-kleinanlagen/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 1 month after.

Since 1 January 2025, for plants under Section 8(1) sentence 2 EEG, electricity network operators send the result of the grid compatibility check, with schedule, information on attendance, cost estimate and equipment under Section 9, without undue delay and at the latest one month after receiving the request; requests must be possible via a web portal (Section 8(7) EEG).

Source: https://www.gesetze-im-internet.de/eeg_2014/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG grid connection: grid compatibility check result within eight weeks</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg8-netzvertraeglichkeitspruefung"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg8-netzvertraeglichkeitspruefung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 8 weeks after.

Electricity network operators send applicants the result of the grid compatibility check, with a schedule and the necessary information, without undue delay and at the latest eight weeks after receiving the required information (Section 8(6) EEG).

Source: https://www.gesetze-im-internet.de/eeg_2014/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: GHG quota: report 2026 charging electricity from public charge points to the Federal Environment Agency</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bimschv38-8-ladestrom-oeffentlich-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/bimschv38-8-ladestrom-oeffentlich-2027/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 28 February 2027.

Anyone who wants electricity from publicly accessible charge points credited towards the greenhouse gas reduction quota reports the quantity drawn in the obligation year to the competent body at the Federal Environment Agency by the end of 28 February of the following year (Section 8(1) sentence 1 no. 1 of the 38th BImSchV).

Source: https://www.gesetze-im-internet.de/bimschv_38_2017/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: GHG quota: report non-public charging of battery electric cars for 2027 to the Federal Environment Agency</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bimschv38-8-ladestrom-bev-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/bimschv38-8-ladestrom-bev-2027/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 15 November 2027.

For electricity drawn to charge battery electric vehicles outside public charge points, the report to the competent body at the Federal Environment Agency is due by the end of 15 November of the obligation year (Section 8(1) sentence 1 no. 2 of the 38th BImSchV).

Source: https://www.gesetze-im-internet.de/bimschv_38_2017/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: BSI TR-03109-1 v2.0: gateway certificates only with MUSS+</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#smgw-tr-03109-1-v2-muss-plus-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/smgw-tr-03109-1-v2-muss-plus-2027/pflicht/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician, plus TAF 8 in its new form and TAF 15. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.

Anyone certifying a smart meter gateway against version 2.0 of the protection profile and TR-03109-1 must also prove the MUSS+ requirements from 1 January 2027. According to the BSI these include a WAN API, registering power metering over the local metrological network and factory reset by the service technician. According to the BSI, gateways under TR v1.1 and protection profile v1.3 may still be installed until 31 December 2027 as a transitional measure.

Source: https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/Schutzprofile/Uebergangsregelung-PP-0073_und_TR-03109-1.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Market master data register: new data annex with ZEREZ ID applies (third MaStRV amendment)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastrv-zerez-id-netzbetreiber-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastrv-zerez-id-netzbetreiber-2027/neu/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 April 2027.

From 1 April 2027 the new annex to the Market Master Data Register Ordinance applies. Network operators then enter, as a mandatory field, the identification number from the central register for unit and component certificates (ZEREZ ID) for units commissioned from 1 January 2026; plug-in solar devices are exempt.

Source: https://www.recht.bund.de/bgbl/1/2026/291/regelungstext.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Price change on 1 January 2028: notice deadline in default supply</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#grundversorgung-preisaenderung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/grundversorgung-preisaenderung-2028/neu/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 20 November 2027.

Default suppliers changing their general prices on 1 January 2028 must publish the change at least six weeks in advance, notify customers by letter and post it online. For household customers on special contracts, Section 41(5) EnWG sets a one month notice period.

Source: https://www.gesetze-im-internet.de/stromgvv/__5.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Federal Network Agency quarterly survey: report supplier switches and disconnections for the fourth quarter of 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bnetza-quartalsabfrage-vnb-2027-02"/>
    <id>tag:innobu.com,2026-11-24:fristen/bnetza-quartalsabfrage-vnb-2027-02/neu/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 15 February 2027.

Electricity and gas DSOs send the Federal Network Agency monthly data on supplier switches and disconnections via MonEDa, for each quarter by the 15th of the second following month at the latest; for the fourth quarter of 2026 by 15 February 2027, then 15 May, 15 August and 15 November. The survey form is filled in on a rolling basis and earlier quarters&#x27; values stay in it.

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/AbfrageVNB/artikel.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Redispatch without balancing: consultation on cost reimbursement closes</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-redispatch-ausgleich-konsultation"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk8-redispatch-ausgleich-konsultation/pflicht/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Ruling Chamber 8 is consulting on how DSOs pay plant operators compensation when redispatch measures are not balanced: under the draft, per MWh of curtailed energy, a blended price of 72.5 percent ID-AEP and 27.5 percent reBAP plus a flat EUR 1.35/MWh, with a negative blended price triggering a payment by the plant operator. Comments are due by 21 October 2026, with the final ruling targeted by year end.

Ruling Chamber 8 consulted until 21 October 2026 on how DSOs pay plant operators compensation when redispatch measures are not balanced: under the draft, per MWh of curtailed energy, a blended price of 72.5 percent ID-AEP and 27.5 percent reBAP plus a flat EUR 1.35/MWh, with a negative blended price triggering a payment by the plant operator. The comments have been published; the final ruling was still pending on 22 November 2026.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-001/BK8-26-0001-A_Konsultation_Festlegungsentwurf.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Redispatch without balancing: compensation and cost pass-through under BK8-26-001-A</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-redispatch-aufwendungsersatz-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk8-redispatch-aufwendungsersatz-2027/neu/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

Under the draft ruling, from 1 January 2027 DSOs pay plant operators compensation for redispatch measures without balancing, pass these costs through as volatile cost shares and publish the curtailed energy for each calendar quarter no later than three months after quarter end. The deductible for late advance notice first applies to calendar year 2028.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-001/Downloads/BK8-26-001-A_Festlegungsentwurf_DL_BF.pdf?__blob=publicationFile&amp;v=4

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Offshore wind: consultation on the dynamic bidding procedure rules from 2027 closes (BK6-26-477)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk6-offshore-gebotsverfahren-konsultation-2026-12"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk6-offshore-gebotsverfahren-konsultation-2026-12/neu/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 4 December 2026.

Ruling Chamber 6 is consulting on its draft rules for the two-stage dynamic bidding procedure in offshore wind tenders from 2027: bid steps with one decimal place, a step of 0.2 ct/kWh per round (0.1 ct/kWh with two bidders) and intermediate-round bids. Comments are due by 4 December 2026; the rules only become binding when the tender is announced after the amended Offshore Wind Act enters into force.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2026/BK6-26-477/BK6-26-477_konsultation.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Hydrogen core network: publish the network charge for the following year</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasserstoff-kernnetz-entgelt-veroeffentlichung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasserstoff-kernnetz-entgelt-veroeffentlichung-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 November 2027.

Operators of the hydrogen core network publish the network charge, during the ramp-up phase the ramp-up charge, by 1 November for the following calendar year and correct the publication without delay if the charge changes afterwards (WANDA, GBK-24-01-2#1, operative point 2 sentences 3 and 4, operative point 3).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2024/GBK-24-01-2x1_WANDA/Downloads/Wanda_Festlegung.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Status changed: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/status/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="status" label="Status changed"/>
    <content type="text">Status changed: date open → fixed.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The 2026-03 edition replaces the 2018-11 edition. The end of the transition period on 1 March 2027 does not come from the standards body; according to VDE FNN, certificates under the 2018-11 edition remain sufficient until one of two periods expires: 12 months after DIN VDE V 0124-100 takes effect or 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.

The 2026-03 edition replaces the 2018-11 edition. According to VDE FNN, the transition period of VDE-AR-N 4105 ends on 1 March 2027; after that, unit certificates under the 2026 edition are required in principle. Because the revised DIN VDE V 0124-100 is not expected to be available by then, VDE FNN accepts unit certificates under the 2018-11 edition until the end of the transition period under Section 9.2: up to 12 months after the revised DIN VDE V 0124-100 takes effect, and at the latest up to 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: E-invoicing: paper and other formats from 2027 only up to EUR 800,000 prior-year turnover or via EDI</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#ustg-e-rechnung-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/ustg-e-rechnung-uebergang-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

For supplies from 1 January 2027, businesses may only send invoices to other businesses on paper or, with the recipient&#x27;s consent, in a format not complying with EN 16931 if their total turnover in the previous year was no more than EUR 800,000, or as an EDI invoice with the recipient&#x27;s consent. Both exceptions end on 31 December 2027 (Section 27(38) UStG).

Source: https://www.gesetze-im-internet.de/ustg_1980/__27.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the government bill, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d draft EnWG) that lowers transmission network charges; the Bundesrat calls for EUR 6.5 billion, so the amount is open. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) draft EnWG).

Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Source: https://dserver.bundestag.de/btd/21/082/2108236.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Electricity and energy tax: estimate of 2027 annual tax by 15 January</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromst-energiest-schaetzung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromst-energiest-schaetzung-2027/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Suppliers with annual returns and advance payments send the main customs office, by 15 January, a sound and traceable estimate of the expected annual tax; below 2,400 euros no notice is needed. On 30 June they estimate again and report by 15 August if the new estimate exceeds 100,000 euros and exceeds the set advance payments by more than 20 per cent (Section 8(6) StromStG, Section 39(5) EnergieStG).

Suppliers with annual returns and advance payments send the main customs office, by 15 January, a sound and traceable estimate of the expected annual tax; below 2,400 euros the estimate is only sent on request of the customs office. On 30 June they estimate again and send it on request, and without request by 15 August if it exceeds 100,000 euros and the annual tax underlying the advance payments by more than 20 per cent (Section 8(6) StromStG, Section 39(5) EnergieStG).

Source: https://www.gesetze-im-internet.de/stromstg/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: MiSpeL: ruling on market integration of storage and charging points</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mispel-festlegung"/>
    <id>tag:innobu.com,2026-11-24:fristen/mispel-festlegung/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges.

The Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges. The ruling was published in the Official Gazette on 7 October 2026 and takes effect upon notification (operative point 8).

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Aufsicht/MiSpeL/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: GeLi Gas 2.0 applies</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#geli-gas-2"/>
    <id>tag:innobu.com,2026-11-24:fristen/geli-gas-2/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: New supplier switch processes for gas, UTILMD Gas 1.1.

New supplier switch processes for gas, since 1 October 2026 in the UTILMD Gas 1.2 format (AHB and MIG).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2019/BK7-19-0001/BK7-19-0001_Beschluss_Internet.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Gas and hydrogen disclosure on the bill: residual energy mix of the previous year (draft Section 42d EnWG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-42d-gaskennzeichnung-restmix-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-42d-gaskennzeichnung-restmix-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 July 2027.

Under the government bill on the gas and hydrogen internal market package, suppliers of gas or hydrogen state the energy mix with CO2 data on or with the bill to final customers. The duty starts when the act enters into force on the day after promulgation; from 1 July 2027 the flat-rate wording is no longer allowed and shares without proof must be shown with the previous year&#x27;s residual energy mix.

Source: https://dserver.bundestag.de/btd/21/054/2105440.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Gas reserve (government draft): levy on balancing group managers from 1 October 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-35m-gasreserve-umlage-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-35m-gasreserve-umlage-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 October 2027.

Under the government draft, subject to the Bundestag&#x27;s decision: from the first levy period starting on 1 October 2027, the market area manager passes the costs of the gas reserve on to balancing group managers, per megawatt hour withdrawn at points with interval metering and with standard load profiles. It sets the levy anew for each yearly period starting on 1 October, bills monthly, may charge instalments and publishes the levy six weeks before each levy period starts; in basic gas supply the levy becomes a price component.

Source: https://dserver.bundestag.de/brd/2026/0652-26.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Regional scenario of the planning region for the 2028 network expansion plan</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-14d-regionalszenario-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-14d-regionalszenario-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2027.

The distribution system operators of a planning region finalise their joint regional scenario, involving the transmission system operators, at least ten months before the network expansion plan is due and submit it to the Federal Network Agency. For the plan due on 31 October 2028 that means 31 December 2027.

Source: https://www.gesetze-im-internet.de/enwg_2005/__14d.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Congestion income 2027: report the planned use to the Federal Network Agency</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#engpasserloese-verwendung-plan-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/engpasserloese-verwendung-plan-2027/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Transmission system operators tell the Federal Network Agency by 31 October how they plan to use the 2027 congestion income from allocating cross-zonal capacity. The basis is Article 4 of the ACER methodology on the use of congestion income under Article 19 of Regulation (EU) 2019/943.

Transmission system operators had to tell the Federal Network Agency by 31 October 2026 how they planned to use the 2027 congestion income from allocating cross-zonal capacity. The basis is Article 4 of the ACER methodology on the use of congestion income under Article 19 of Regulation (EU) 2019/943.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK08/BK8_04_InfoRundschr/41_Rundschr/Downloads/Fristenkalender_Netzbetreiber_Netzentgelte_Elektrizitaet_2026.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Bill: show the price component for the mandatory biogenic share under Section 43 GModG (Section 3(1) no. 6 CO2KostAufG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#co2kostaufg-biogener-anteil-rechnung-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/co2kostaufg-biogener-anteil-rechnung-2029/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2029.

Fuel suppliers delivering to buildings with rented housing whose heating falls under Section 43(1) GModG show the price component for the mandatory biogenic share separately on the bill. The rule has applied since 29 July 2026; in practice it bites from 1 January 2029 with the first 10 percent step.

Source: https://www.gesetze-im-internet.de/co2kostaufg/__3.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Electricity cost review from 2029: submit documents for the starting level (draft determination BK8-26-04#7 to #12)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-kostenpruefung-ausgangsniveau-unterlagen-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk8-kostenpruefung-ausgangsniveau-unterlagen-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 July 2027.

Under the draft determination, electricity DSOs submit all documents for determining the starting level of the fifth regulatory period to the Federal Network Agency in full by 1 July 2027; with an approved simplified procedure by 30 September 2027.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-004/BK8-26-004x7bis12/Anlagen/BK8-26-004x7bis12_Anlage1_DL_BF.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Electricity efficiency benchmarking: data collection consultation closes</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-effizienzvergleich-datenerhebung-konsultation"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk8-effizienzvergleich-datenerhebung-konsultation/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Ruling Chamber 8 is consulting on which data electricity DSOs must supply for the efficiency benchmarking of the fifth regulatory period. Comments are due by 26 October 2026; the data collection follows afterwards.

Ruling Chamber 8 consulted on which data electricity DSOs must supply for the efficiency benchmarking of the fifth regulatory period. The comment period closed on 26 October 2026; the final determination is still pending.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-004/BK8-26-004x13/BK8-26-004x13_Einleitung_Konsultation.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: dynamic network charge for battery storage at levels 1 to 5</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-dynamisches-netzentgelt-speicher-2033"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-dynamisches-netzentgelt-speicher-2033/folge/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: dynamic network charge for generation plants at levels 1 to 5</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-dynamisches-netzentgelt-erzeuger-2035"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-dynamisches-netzentgelt-erzeuger-2035/folge/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Date moved: Gas WACC: the rate of return decision is issued</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wacc-gas-festlegung"/>
    <id>tag:innobu.com,2026-11-24:fristen/wacc-gas-festlegung/termin/2026-11-11</id>
    <updated>2026-11-11T00:00:00Z</updated>
    <category term="termin" label="Date moved"/>
    <content type="text">Date moved: 31 December 2026 → 30 September 2027.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK9-GZ/2026/2026_bis0999/BK9-26-0621/BK9-26-0621_Ank%C3%BCndigung_Verfahrensablauf.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Gas WACC: the rate of return decision is issued</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wacc-gas-festlegung"/>
    <id>tag:innobu.com,2026-11-24:fristen/wacc-gas-festlegung/pflicht/2026-11-11</id>
    <updated>2026-11-11T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The Bundesnetzagentur intends to set the flat-rate return on capital for gas grid operators by the end of 2026. Gas distribution operators then calculate the revenue caps of the fifth regulatory period from 2028 with the adopted rate.

The Bundesnetzagentur has announced that it will set the flat-rate return on capital for gas grid operators only in late summer 2027, using capital market data for 2026; an updated draft goes out for consultation in the second quarter of 2027. Gas distribution operators then calculate the revenue caps of the fifth regulatory period from 2028 with the adopted rate.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK9-GZ/2026/2026_bis0999/BK9-26-0621/BK9-26-0621_Ank%C3%BCndigung_Verfahrensablauf.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>