<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
  <title>innobu deadline calendar: new and changed (Direct marketer)</title>
  <subtitle>Every change to the energy transition deadline calendar: deadlines added, dates moved, status changes, corrected obligations and legal consequences, with dates.</subtitle>
  <link rel="self" type="application/atom+xml" href="https://www.innobu.com/assets/feeds/fristen-aenderungen-en-dv.xml"/>
  <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-changes.html"/>
  <id>https://www.innobu.com/assets/feeds/fristen-aenderungen-en-dv.xml</id>
  <updated>2026-10-27T00:00:00Z</updated>
  <author><name>innobu GmbH</name><uri>https://www.innobu.com/</uri></author>
  <rights>A classification for typical market roles, not a review of your individual case and not legal advice. Whether an obligation applies to your company (thresholds, exemptions) is for your legal department or counsel to confirm. The calendar doesn&#x27;t replace your own deadline review.</rights>
  <entry>
    <title>Added: Capacity market: apply to complete provisional prequalification by 31 October 2031</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromvkg-abschluss-praequalifizierung-2031"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromvkg-abschluss-praequalifizierung-2031/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 October 2031.

Capacity providers with provisional prequalification submit the application to complete it, with the data and evidence under Section 62 StromVKG, to the responsible TSO via the joint platform by the end of 31 October 2031 (Section 61(2) StromVKG). By then every plant in a plant pool must have a smart metering system and load profile metering (Section 21 StromVKG).

Source: https://www.gesetze-im-internet.de/stromvkg/__61.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Solar Peak Act: no EEG payment at negative prices for new plants</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#solarspitzen-negative-preise"/>
    <id>tag:innobu.com,2026-11-24:fristen/solarspitzen-negative-preise/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: For plants commissioned from 25 February 2025, the reference value drops to zero in every period with a negative spot market price. Plants below 100 kW are only covered from the end of the year in which a smart metering system is installed.

For plants commissioned from 25 February 2025 whose reference value was not already set in a bid date before that day, the reference value drops to zero in every period with a negative spot market price. Plants below 100 kW are only covered from the end of the year in which a smart metering system is installed, plants below 2 kW only from the end of the year of the determination under Section 85(2) no. 12 EEG.

Source: https://www.gesetze-im-internet.de/eeg_2014/__51.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Redispatch 2.0: move controllable resources into the plan-value model</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#redispatch-planwertmodell-ueberfuehrung-2031"/>
    <id>tag:innobu.com,2026-11-24:fristen/redispatch-planwertmodell-ueberfuehrung-2031/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2031.

By 1 January 2031, distribution system operators, in coordination with the TSOs, are to move at least all controllable resources that can improve the efficiency of congestion management in the transmission grid into the plan-value model (BK6-23-241, annex BilAReM, section 2.3.1).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2023/BK6-23-241/BK6-23-241_bilarem.pdf?__blob=publicationFile&amp;v=1

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG tender solar second segment (rooftop): bid date 1 February 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-solar2-2027-02"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-solar2-2027-02/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 February 2027.

Bids must reach the Federal Network Agency by the bid date; the dates are set by law (Section 28b(1) EEG): 1 February, 1 June and 1 October, until 2029.

Source: https://www.gesetze-im-internet.de/eeg_2014/__28b.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG: data for the 2026 final settlement to the network operator (28 February)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-71-endabrechnungsdaten-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-71-endabrechnungsdaten-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 28 February 2027.

Plant operators provide the network operator by 28 February with all data needed for the final settlement of the previous year, per installation (Section 71(1) no. 1 EEG), i.e. for 2026 by 28 February 2027. In direct marketing these data often come from the direct marketer in practice.

Source: https://www.gesetze-im-internet.de/eeg_2014/__71.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG: report a change of sales form for 1 January 2027 by end of November</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-21c-wechsel-veraeusserungsform-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-21c-wechsel-veraeusserungsform-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 November 2026.

Plant operators must notify the network operator before the start of the preceding calendar month if they first sell in a form under Section 21b EEG or switch between forms, including the balancing group (Section 21c(1) EEG). For a switch on 1 January 2027 that is 30 November 2026; the rule applies to every month change.

Source: https://www.gesetze-im-internet.de/eeg_2014/__21c.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Redispatch 2.0: choice of settlement method for 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#redispatch-abrechnungsvariante-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/redispatch-abrechnungsvariante-2027/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under ruling BK6-23-241, the plant operator sets the settlement method for each technical resource by 30 November for the following year. Without a decision the simplified peak settlement applies; the flat-rate settlement ends for existing resources at the end of 2028.

Under BK6-23-241 (BilAReM section 3.2.1), operators of wind and solar plants from 100 kW set the settlement method for each technical resource by 30 November for the following year. Without a decision the simplified peak settlement applies; the flat-rate settlement ends for existing resources at the end of 2028 unless feed-in is not metered quarter-hourly.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2023/BK6-23-241/BK6-23-241_beschluss.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG: control via the smart meter gateway from 2028</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-smgw-steuerung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-smgw-steuerung-2028/neu/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

From 1 January 2028, and once a smart metering system is installed, plants above 25 kW in direct marketing must be readable and remotely controllable via the smart meter gateway (Section 10b(2) EEG). From 2028, after a smart metering system and control device have been installed, grid operators pay the plant operator EUR 100 gross for each year begun until the controllability test has succeeded (Section 9(2a) EEG).

Source: https://www.gesetze-im-internet.de/eeg_2014/__10b.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Date moved: EEG onshore wind tender: bid deadline 1 November 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-wind-2026-11"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-wind-2026-11/termin/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="termin" label="Date moved"/>
    <content type="text">Date moved: 1 November 2026 → 2 November 2026.

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Wind_Onshore/GT01112026/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: EEG onshore wind tender: bid deadline 1 November 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-wind-2026-11"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-wind-2026-11/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Bids for onshore wind turbines must reach the Federal Network Agency by the bid deadline. According to the agency, the volume is about 2,495 MW and the 2026 ceiling price is 7.25 cents per kilowatt hour.

Bids for onshore wind turbines must reach the Federal Network Agency by the bid deadline; as 1 November 2026 is a Sunday, bids are due by midnight on Monday, 2 November 2026. According to the agency, the volume is about 2,495 MW and the 2026 ceiling price is 7.25 cents per kilowatt hour.

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Wind_Onshore/GT01112026/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Title changed: EEG first-segment solar tender: bid deadline 1 December 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-solar-2026-12"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-solar-2026-12/titel/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="titel" label="Title changed"/>
    <content type="text">Title changed.

Before: EEG ground-mounted solar tender: bid deadline 1 December 2026

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Solaranlagen1/01122026/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: EEG first-segment solar tender: bid deadline 1 December 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-solar-2026-12"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-solar-2026-12/pflicht/2026-10-23</id>
    <updated>2026-10-23T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Bids for ground-mounted solar plants (first segment) must reach the Federal Network Agency by the bid deadline. According to the agency, the actual volume is about 2,079 MW.

Bids for first-segment solar plants (ground-mounted and on structures that are neither buildings nor noise barriers) must reach the Federal Network Agency by the bid date. According to the agency, the volume is about 2,226 MW and the ceiling price 5.53 cents per kilowatt hour.

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Solaranlagen1/01122026/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Capacity market (StromVKG): first technology-open capacity auction</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromvkg-kapazitaeten-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromvkg-kapazitaeten-2027/neu/2026-09-28</id>
    <updated>2026-09-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 December 2027.

The first capacity auction takes place on 1 December 2027, open to generation plants, electricity storage, controllable loads and plant pools. Prequalification with the responsible transmission system operator is required first; applications are only possible from the seventh to the fifth month before the bid date.

Source: https://www.gesetze-im-internet.de/stromvkg/BJNR0D2AB0026.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Solar Peak Act: no EEG payment at negative prices for new plants</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#solarspitzen-negative-preise"/>
    <id>tag:innobu.com,2026-11-24:fristen/solarspitzen-negative-preise/neu/2026-09-28</id>
    <updated>2026-09-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 25 February 2025.

For plants commissioned from 25 February 2025 whose reference value was not already set in a bid date before that day, the reference value drops to zero in every period with a negative spot market price. Plants below 100 kW are only covered from the end of the year in which a smart metering system is installed, plants below 2 kW only from the end of the year of the determination under Section 85(2) no. 12 EEG.

Source: https://www.gesetze-im-internet.de/eeg_2014/__51.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: REMIT II: new reporting formats and first exposure report</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#remit-meldungen-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/remit-meldungen-2027/neu/2026-09-28</id>
    <updated>2026-09-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 29 October 2027.

From 29 October 2027 the new data fields apply to continuous transaction reporting to ACER. Market participants with positions of 600 GWh per year or more report exposures quarterly, first in October 2027; balancing service transactions must be reported monthly from 29 April 2028.

Source: https://eur-lex.europa.eu/eli/reg_impl/2026/256/oj

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Redispatch 2.0: choice of settlement method for 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#redispatch-abrechnungsvariante-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/redispatch-abrechnungsvariante-2027/neu/2026-09-28</id>
    <updated>2026-09-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 November 2026.

Under BK6-23-241 (BilAReM section 3.2.1), operators of wind and solar plants from 100 kW set the settlement method for each technical resource by 30 November for the following year. Without a decision the simplified peak settlement applies; the flat-rate settlement ends for existing resources at the end of 2028 unless feed-in is not metered quarter-hourly.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2023/BK6-23-241/BK6-23-241_beschluss.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG onshore wind tender: bid deadline 1 November 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-wind-2026-11"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-wind-2026-11/neu/2026-09-28</id>
    <updated>2026-09-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 November 2026.

Bids for onshore wind turbines must reach the Federal Network Agency by the bid deadline; as 1 November 2026 is a Sunday, bids are due by midnight on Monday, 2 November 2026. According to the agency, the volume is about 2,495 MW and the 2026 ceiling price is 7.25 cents per kilowatt hour.

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Wind_Onshore/GT01112026/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG first-segment solar tender: bid deadline 1 December 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-ausschreibung-solar-2026-12"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg-ausschreibung-solar-2026-12/neu/2026-09-28</id>
    <updated>2026-09-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 December 2026.

Bids for first-segment solar plants (ground-mounted and on structures that are neither buildings nor noise barriers) must reach the Federal Network Agency by the bid date. According to the agency, the volume is about 2,226 MW and the ceiling price 5.53 cents per kilowatt hour.

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Solaranlagen1/01122026/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>