  <title>innobu deadline calendar: new and changed (Electricity grid operator)</title>
  <subtitle>Every change to the energy transition deadline calendar: deadlines added, dates moved, status changes, corrected obligations and legal consequences, with dates.</subtitle>
  <link rel="self" type="application/atom+xml" href="https://www.innobu.com/assets/feeds/fristen-aenderungen-en-nb-s.xml"/>
  <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-changes.html"/>
  <id>https://www.innobu.com/assets/feeds/fristen-aenderungen-en-nb-s.xml</id>
  <updated>2026-11-24T00:00:00Z</updated>
  <author><name>innobu GmbH</name><uri>https://www.innobu.com/</uri></author>
  <rights>A classification for typical market roles, not a review of your individual case and not legal advice. Whether an obligation applies to your company (thresholds, exemptions) is for your legal department or counsel to confirm. The calendar doesn&#x27;t replace your own deadline review.</rights>
  <entry>
    <title>Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat has until 4 December 2026 for its second reading. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Source: https://dserver.bundestag.de/btd/21/082/2108236.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Significant security incident: 24 hours, 72 hours, one month</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#sicherheitsvorfall-meldung-energienetz"/>
    <id>tag:innobu.com,2026-11-24:fristen/sicherheitsvorfall-meldung-energienetz/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 24 hours after; within 72 hours after; within 1 month after.

Operators of energy supply networks, energy installations and digital energy services under Section 5c(1) sentence 1 nos. 1 to 3 EnWG report a significant security incident to the reporting office under Section 32 BSIG as an early warning at the latest 24 hours after becoming aware of it, with an initial assessment at the latest 72 hours after becoming aware of it, and with a final report at the latest one month after that notification, or a progress report if the incident is still ongoing (Section 5d(3) EnWG, Section 32(2) BSIG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__5d.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Low-voltage grid connection: state the time needed within ten working days</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#nav6-zeitbedarf-netzanschluss"/>
    <id>tag:innobu.com,2026-11-24:fristen/nav6-zeitbedarf-netzanschluss/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 10 working days after.

The network operator tells the connectee the expected time needed without undue delay and at the latest ten working days after the order to establish the grid connection (Section 6(1) NAV).

Source: https://www.gesetze-im-internet.de/nav/__6.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Charging equipment above 12 kVA: network operator responds within two months</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#nav19-zustimmung-ladeeinrichtung"/>
    <id>tag:innobu.com,2026-11-24:fristen/nav19-zustimmung-ladeeinrichtung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 2 months after.

Where charging equipment needs the network operator&#x27;s consent because its total rated power exceeds 12 kVA per electrical installation, the network operator responds within two months of receiving the notification; if it refuses, it sets out the obstacle, possible remedies and the time needed for them (Section 19(2) NAV).

Source: https://www.gesetze-im-internet.de/nav/__19.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Market master data register: register a new market role</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-marktakteur-registrierung"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastr-marktakteur-registrierung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 1 month after.

Market actors register for each market function within one month of first acting in it; network operators without undue delay after their licence is notified (Section 3(2) MaStRV).

Source: https://www.gesetze-im-internet.de/mastrv/__3.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Supplier switch within 24 hours</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#lieferantenwechsel-24-stunden"/>
    <id>tag:innobu.com,2026-11-24:fristen/lieferantenwechsel-24-stunden/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 24 hours after.

Since 1 January 2026, the technical process of switching energy supplier must be completed within 24 hours and be possible on every working day; a longer period is only allowed where the registration relates to a supply date further in the future (Section 20a(2) EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__20a.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG grid connection up to 30 kW: grid compatibility check result within one month</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg8-zeitplan-kleinanlagen"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg8-zeitplan-kleinanlagen/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 1 month after.

Since 1 January 2025, for plants under Section 8(1) sentence 2 EEG, electricity network operators send the result of the grid compatibility check, with schedule, information on attendance, cost estimate and equipment under Section 9, without undue delay and at the latest one month after receiving the request; requests must be possible via a web portal (Section 8(7) EEG).

Source: https://www.gesetze-im-internet.de/eeg_2014/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EEG grid connection: grid compatibility check result within eight weeks</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg8-netzvertraeglichkeitspruefung"/>
    <id>tag:innobu.com,2026-11-24:fristen/eeg8-netzvertraeglichkeitspruefung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 8 weeks after.

Electricity network operators send applicants the result of the grid compatibility check, with a schedule and the necessary information, without undue delay and at the latest eight weeks after receiving the required information (Section 8(6) EEG).

Source: https://www.gesetze-im-internet.de/eeg_2014/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Market master data register: new data annex with ZEREZ ID applies (third MaStRV amendment)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastrv-zerez-id-netzbetreiber-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastrv-zerez-id-netzbetreiber-2027/neu/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 April 2027.

From 1 April 2027 the new annex to the Market Master Data Register Ordinance applies. Network operators then enter, as a mandatory field, the identification number from the central register for unit and component certificates (ZEREZ ID) for units commissioned from 1 January 2026; plug-in solar devices are exempt.

Source: https://www.recht.bund.de/bgbl/1/2026/291/regelungstext.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Federal Network Agency quarterly survey: report supplier switches and disconnections for the fourth quarter of 2026</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bnetza-quartalsabfrage-vnb-2027-02"/>
    <id>tag:innobu.com,2026-11-24:fristen/bnetza-quartalsabfrage-vnb-2027-02/neu/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 15 February 2027.

Electricity and gas DSOs send the Federal Network Agency monthly data on supplier switches and disconnections via MonEDa, for each quarter by the 15th of the second following month at the latest; for the fourth quarter of 2026 by 15 February 2027, then 15 May, 15 August and 15 November. The survey form is filled in on a rolling basis and earlier quarters&#x27; values stay in it.

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/AbfrageVNB/artikel.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Redispatch without balancing: consultation on cost reimbursement closes</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-redispatch-ausgleich-konsultation"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk8-redispatch-ausgleich-konsultation/pflicht/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Ruling Chamber 8 is consulting on how DSOs pay plant operators compensation when redispatch measures are not balanced: under the draft, per MWh of curtailed energy, a blended price of 72.5 percent ID-AEP and 27.5 percent reBAP plus a flat EUR 1.35/MWh, with a negative blended price triggering a payment by the plant operator. Comments are due by 21 October 2026, with the final ruling targeted by year end.

Ruling Chamber 8 consulted until 21 October 2026 on how DSOs pay plant operators compensation when redispatch measures are not balanced: under the draft, per MWh of curtailed energy, a blended price of 72.5 percent ID-AEP and 27.5 percent reBAP plus a flat EUR 1.35/MWh, with a negative blended price triggering a payment by the plant operator. The comments have been published; the final ruling was still pending on 22 November 2026.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-001/BK8-26-0001-A_Konsultation_Festlegungsentwurf.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Redispatch without balancing: compensation and cost pass-through under BK8-26-001-A</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-redispatch-aufwendungsersatz-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk8-redispatch-aufwendungsersatz-2027/neu/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

Under the draft ruling, from 1 January 2027 DSOs pay plant operators compensation for redispatch measures without balancing, pass these costs through as volatile cost shares and publish the curtailed energy for each calendar quarter no later than three months after quarter end. The deductible for late advance notice first applies to calendar year 2028.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-001/Downloads/BK8-26-001-A_Festlegungsentwurf_DL_BF.pdf?__blob=publicationFile&amp;v=4

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Status changed: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/status/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="status" label="Status changed"/>
    <content type="text">Status changed: date open → fixed.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The 2026-03 edition replaces the 2018-11 edition. The end of the transition period on 1 March 2027 does not come from the standards body; according to VDE FNN, certificates under the 2018-11 edition remain sufficient until one of two periods expires: 12 months after DIN VDE V 0124-100 takes effect or 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.

The 2026-03 edition replaces the 2018-11 edition. According to VDE FNN, the transition period of VDE-AR-N 4105 ends on 1 March 2027; after that, unit certificates under the 2026 edition are required in principle. Because the revised DIN VDE V 0124-100 is not expected to be available by then, VDE FNN accepts unit certificates under the 2018-11 edition until the end of the transition period under Section 9.2: up to 12 months after the revised DIN VDE V 0124-100 takes effect, and at the latest up to 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: E-invoicing: paper and other formats from 2027 only up to EUR 800,000 prior-year turnover or via EDI</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#ustg-e-rechnung-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/ustg-e-rechnung-uebergang-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

For supplies from 1 January 2027, businesses may only send invoices to other businesses on paper or, with the recipient&#x27;s consent, in a format not complying with EN 16931 if their total turnover in the previous year was no more than EUR 800,000, or as an EDI invoice with the recipient&#x27;s consent. Both exceptions end on 31 December 2027 (Section 27(38) UStG).

Source: https://www.gesetze-im-internet.de/ustg_1980/__27.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the government bill, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d draft EnWG) that lowers transmission network charges; the Bundesrat calls for EUR 6.5 billion, so the amount is open. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) draft EnWG).

Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Source: https://dserver.bundestag.de/btd/21/082/2108236.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: MiSpeL: ruling on market integration of storage and charging points</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mispel-festlegung"/>
    <id>tag:innobu.com,2026-11-24:fristen/mispel-festlegung/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges.

The Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges. The ruling was published in the Official Gazette on 7 October 2026 and takes effect upon notification (operative point 8).

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Aufsicht/MiSpeL/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Regional scenario of the planning region for the 2028 network expansion plan</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-14d-regionalszenario-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-14d-regionalszenario-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2027.

The distribution system operators of a planning region finalise their joint regional scenario, involving the transmission system operators, at least ten months before the network expansion plan is due and submit it to the Federal Network Agency. For the plan due on 31 October 2028 that means 31 December 2027.

Source: https://www.gesetze-im-internet.de/enwg_2005/__14d.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Electricity cost review from 2029: submit documents for the starting level (draft determination BK8-26-04#7 to #12)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-kostenpruefung-ausgangsniveau-unterlagen-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk8-kostenpruefung-ausgangsniveau-unterlagen-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 July 2027.

Under the draft determination, electricity DSOs submit all documents for determining the starting level of the fifth regulatory period to the Federal Network Agency in full by 1 July 2027; with an approved simplified procedure by 30 September 2027.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-004/BK8-26-004x7bis12/Anlagen/BK8-26-004x7bis12_Anlage1_DL_BF.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Electricity efficiency benchmarking: data collection consultation closes</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-effizienzvergleich-datenerhebung-konsultation"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk8-effizienzvergleich-datenerhebung-konsultation/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Ruling Chamber 8 is consulting on which data electricity DSOs must supply for the efficiency benchmarking of the fifth regulatory period. Comments are due by 26 October 2026; the data collection follows afterwards.

Ruling Chamber 8 consulted on which data electricity DSOs must supply for the efficiency benchmarking of the fifth regulatory period. The comment period closed on 26 October 2026; the final determination is still pending.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-004/BK8-26-004x13/BK8-26-004x13_Einleitung_Konsultation.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: dynamic network charge for battery storage at levels 1 to 5</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-dynamisches-netzentgelt-speicher-2033"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-dynamisches-netzentgelt-speicher-2033/folge/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: dynamic network charge for generation plants at levels 1 to 5</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-dynamisches-netzentgelt-erzeuger-2035"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-dynamisches-netzentgelt-erzeuger-2035/folge/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Electricity cost review from 2029: consultation on data collection for the starting level closes</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-kostendaten-ausgangsniveau-konsultation"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk8-kostendaten-ausgangsniveau-konsultation/neu/2026-11-11</id>
    <updated>2026-11-11T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 7 December 2026.

Ruling Chamber 8 is consulting on which documents and data electricity DSOs must submit for the cost review that sets the starting level of the fifth regulatory period; the draft sets 1 July 2027 as the deadline, or 30 September 2027 in the simplified procedure. Comments are due by 7 December 2026.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-Steller/BK8-26-004/BK8-26-004x7bis12/BK8-26-004x7bis12_Einleitung_Konsultation.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Avoided network charges: 75 per cent cut from 2028</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vermiedene-netzentgelte-abschmelzung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/vermiedene-netzentgelte-abschmelzung-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-02-1x1_verm_NE/Downloads/Festlegung_DL_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Civil-law consequence → Fine possible.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: VDE-AR-N 4100:2026-04: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4100-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4100-uebergang-2027/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.vde-verlag.de/normen/0100932/vde-ar-n-4100-anwendungsregel-2026-04.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Grid package: system-serving connection capacity instead of maximum output</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#netzpaket-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/netzpaket-2027/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://dserver.bundestag.de/btd/21/078/2107866.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Grid expansion plan under section 14d EnWG: filing due 31 October 2028</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#netzausbauplan-14d-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/netzausbauplan-14d-2028/neu/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 October 2028.

Distribution system operators with 100,000 or more customers submit their next grid expansion plan to the Federal Network Agency by 31 October 2028, in the statutory two-year cycle following the 2026 plan. Smaller operators are covered only if they curtailed more than 3 percent of onshore wind or solar output in each of the two previous years.

Source: https://www.gesetze-im-internet.de/enwg_2005/__14d.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Small electricity DSOs: notify charging points and stop operating them</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-118-34-ladepunkte-kleine-vnb-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-118-34-ladepunkte-kleine-vnb-2026/pflicht/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Electricity distribution system operators whose vertically integrated undertaking has fewer than 100,000 customers must notify the Federal Network Agency in text form of their activities relating to charging points they already developed, managed or operated before 27 July 2021, and cease them by the end of 31 December 2026, unless the agency has granted approval under Section 7c(2) EnWG beforehand (Section 118(34) sentences 1 to 4 EnWG).

Electricity distribution system operators with fewer than 100,000 customers connected directly or indirectly to their network must notify the Federal Network Agency in text form of their activities relating to charging points they already developed, managed or operated before 27 July 2021, and cease them by the end of 31 December 2026, unless the agency has granted approval under Section 7c(2) EnWG beforehand (Section 118(34) sentences 1 to 4 EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__118.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: 2028 levies: publication by the transmission system operators</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enfg-umlagen-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/enfg-umlagen-2028/neu/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 25 October 2027.

The transmission system operators publish the 2028 CHP levy and offshore grid levy by 25 October 2027. Suppliers and grid operators carry the values into price sheets and grid fee billing.

Source: https://www.gesetze-im-internet.de/enfg/__11.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Surcharge for special grid use: show contributions separately</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#aufschlag-besondere-netznutzung-ausweis-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/aufschlag-besondere-netznutzung-ausweis-2027/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2024/2024_4-Steller/BK8-24-0001/Downloads/BK8-24-0001-A_Festlegung_Download_BF.pdf?__blob=publicationFile&amp;v=4

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: TSOs adjust network charges by 1 October</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-uenb-netzentgelte-anpassung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-uenb-netzentgelte-anpassung-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: network operators identify prosumers and notify suppliers</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-prosumer-identifikation-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-prosumer-identifikation-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: explain a late adjustment of network charges for 1 January</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-netzentgelte-nachanpassung-erlaeuterung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-netzentgelte-nachanpassung-erlaeuterung-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: submit network charge review data and charge report by 1 January</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-netzentgelte-datenmeldung-bericht-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-netzentgelte-datenmeldung-bericht-2029/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: final consumption data to the upstream network operator</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-letztverbrauch-daten-vorgelagerter-nb-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-letztverbrauch-daten-vorgelagerter-nb-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: final consumption data to the Federal Network Agency</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-letztverbrauch-daten-bnetza-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-letztverbrauch-daten-bnetza-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: DSOs report feed-in data to the TSO</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-einspeiseentgelt-datenmeldung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-einspeiseentgelt-datenmeldung-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: publish the final settlement of the surcharge for special grid use</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-aufschlag-endabrechnung-veroeffentlichung-2030"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-aufschlag-endabrechnung-veroeffentlichung-2030/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: § 14a EnWG: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#14a-uebergang"/>
    <id>tag:innobu.com,2026-11-24:fristen/14a-uebergang/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2022/BK6-22-300/Beschluss/BK6-22-300_Beschluss_Anlage1.pdf?__blob=publicationFile&amp;v=1

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Controllability check: network operators&#x27; tests and reports by 30 September via the TSOs&#x27; portals</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#steuerbarkeitscheck-meldung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/steuerbarkeitscheck-meldung-2027/neu/2026-10-28</id>
    <updated>2026-10-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 September 2027.

Every electricity network operator carries out test adjustments under Section 13a(1) EnWG and retrievals of actual feed-in every year, since 2026 also for plants below 100 kW; every default metering operator checks the deployment status of smart metering systems and control units every year and sends it to the network operator (Section 12(2b) EnWG). Under the TSOs&#x27; guidelines, tests and data submission via their portals must be completed by 30 September; upstream network operators check the data from 1 to 31 October.

Source: https://www.gesetze-im-internet.de/enwg_2005/__12.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Renewables grid cost pass-through: notify the regulator of the 2028 amount</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#ee-netzkostenwaelzung-anzeige-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/ee-netzkostenwaelzung-anzeige-2027/neu/2026-10-28</id>
    <updated>2026-10-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 October 2027.

Distribution system operators that intend to notify their TSO of a pass-through of renewables-related extra costs for 2028 must notify the competent regulator of the calculated amount by 1 October 2027 and submit the survey form under Section 28 nos. 3 and 4 ARegV (ruling BK8-24-001-A, operative item 5(d)). By this date the data needed to calculate the amount are sufficient; the complete form including the tariff cross-check is only due on 1 January under Section 28 ARegV.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2024/2024_4-Steller/BK8-24-0001/Downloads/BK8-24-0001-A_Festlegung_Download_BF.pdf?__blob=publicationFile&amp;v=4

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Federal Network Agency quarterly survey: report supplier switches and disconnections (15 February, May, August, November)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bnetza-quartalsabfrage-vnb-2026-11"/>
    <id>tag:innobu.com,2026-11-24:fristen/bnetza-quartalsabfrage-vnb-2026-11/neu/2026-10-28</id>
    <updated>2026-10-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 15 November 2026.

Electricity and gas DSOs send the Federal Network Agency monthly data on supplier switches and disconnections via MonEDa, for each quarter by the 15th of the second following month at the latest; for the third quarter of 2026 by 15 November 2026, then 15 February, 15 May and 15 August. The survey form is filled in on a rolling basis and earlier quarters&#x27; values stay in it.

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/AbfrageVNB/artikel.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: AgNes: submit network charge review data and charge report by 1 January</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-netzentgelte-datenmeldung-bericht-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-netzentgelte-datenmeldung-bericht-2029/neu/2026-10-28</id>
    <updated>2026-10-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2029.

Operators of public electricity networks send the regulator, by 1 January each year, the data needed to review network charges together with a report on how the charges were calculated: basis and process under operative point 14, the documented allocation keys and other relevant aspects, so that an expert third party can follow the calculation without further information (AgNes draft ruling, operative point 16). The duty replaces the data and reporting duties under Section 28 StromNEV and Section 28 ARegV.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Avoided network charges: 75 per cent cut from 2028</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vermiedene-netzentgelte-abschmelzung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/vermiedene-netzentgelte-abschmelzung-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

Electricity DSOs cut the avoided upstream costs underlying the charges for decentralised feed-in in stages: by 50 per cent from 1 July 2026 and from 1 January 2027, and by 75 per cent from 1 January 2028 (GBK-25-02-1#1, operative point 2).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-02-1x1_verm_NE/Downloads/Festlegung_DL_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Publish 2026 network losses</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#verlustenergie-veroeffentlichung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/verlustenergie-veroeffentlichung-2027/folge/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.gesetze-im-internet.de/stromnev/__10.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: VDE-AR-N 4105: deadline for power limitation evidence</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-zertifikate-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-zertifikate-2028/folge/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Civil-law consequence → Money is lost.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: VDE-AR-N 4105:2026-03: end of the transition period</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-ar-n-4105-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/vde-ar-n-4105-uebergang-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The 2026-03 edition replaces the 2018-11 edition. The end of the transition period on 1 March 2027 does not come from the standards body; according to VDE FNN, certificates under the 2018-11 edition remain sufficient for up to 24 months after the rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.

The 2026-03 edition replaces the 2018-11 edition. According to VDE FNN, the transition period of VDE-AR-N 4105 ends on 1 March 2027; after that, unit certificates under the 2026 edition are required in principle. Because the revised DIN VDE V 0124-100 is not expected to be available by then, VDE FNN accepts unit certificates under the 2018-11 edition until the end of the transition period under Section 9.2: up to 12 months after the revised DIN VDE V 0124-100 takes effect, and at the latest up to 24 months after the application rule took effect. Technical connection conditions, notification forms (F.1.1, F.1.2) and the connection assessment up to 500 kW must be switched to the new edition.

Source: https://www.vde.com/de/fnn/themen/tar/tar-niederspannung/erzeugungsanlagen-am-niederspannungsnetz-vde-ar-n-4105-2018

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the government bill, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 that lowers transmission network charges. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG draft).

Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Source: https://dserver.bundestag.de/btd/21/082/2108236.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Solar Peak Act: no EEG payment at negative prices for new plants</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#solarspitzen-negative-preise"/>
    <id>tag:innobu.com,2026-11-24:fristen/solarspitzen-negative-preise/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: For plants commissioned from 25 February 2025, the reference value drops to zero in every period with a negative spot market price. Plants below 100 kW are only covered from the end of the year in which a smart metering system is installed.

For plants commissioned from 25 February 2025 whose reference value was not already set in a bid date before that day, the reference value drops to zero in every period with a negative spot market price. Plants below 100 kW are only covered from the end of the year in which a smart metering system is installed, plants below 2 kW only from the end of the year of the determination under Section 85(2) no. 12 EEG.

Source: https://www.gesetze-im-internet.de/eeg_2014/__51.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>