<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
  <title>innobu deadline calendar: new and changed (Supplier)</title>
  <subtitle>Every change to the energy transition deadline calendar: deadlines added, dates moved, status changes, corrected obligations and legal consequences, with dates.</subtitle>
  <link rel="self" type="application/atom+xml" href="https://www.innobu.com/assets/feeds/fristen-aenderungen-en-lf.xml"/>
  <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-changes.html"/>
  <id>https://www.innobu.com/assets/feeds/fristen-aenderungen-en-lf.xml</id>
  <updated>2026-11-24T00:00:00Z</updated>
  <author><name>innobu GmbH</name><uri>https://www.innobu.com/</uri></author>
  <rights>A classification for typical market roles, not a review of your individual case and not legal advice. Whether an obligation applies to your company (thresholds, exemptions) is for your legal department or counsel to confirm. The calendar doesn&#x27;t replace your own deadline review.</rights>
  <entry>
    <title>Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat has until 4 December 2026 for its second reading. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Source: https://dserver.bundestag.de/btd/21/082/2108236.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Market master data register: register a new market role</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-marktakteur-registrierung"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastr-marktakteur-registrierung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 1 month after.

Market actors register for each market function within one month of first acting in it; network operators without undue delay after their licence is notified (Section 3(2) MaStRV).

Source: https://www.gesetze-im-internet.de/mastrv/__3.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Market master data register: record changes</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mastr-aenderung-registrieren"/>
    <id>tag:innobu.com,2026-11-24:fristen/mastr-aenderung-registrieren/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 1 month after.

When recorded data change, the responsible party registers the change within one month of it occurring (Section 7(1) MaStRV).

Source: https://www.gesetze-im-internet.de/mastrv/__7.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Supplier switch within 24 hours</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#lieferantenwechsel-24-stunden"/>
    <id>tag:innobu.com,2026-11-24:fristen/lieferantenwechsel-24-stunden/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 24 hours after.

Since 1 January 2026, the technical process of switching energy supplier must be completed within 24 hours and be possible on every working day; a longer period is only allowed where the registration relates to a supply date further in the future (Section 20a(2) EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__20a.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Building Modernisation Act: confirm the biomethane or hydrogen share with the bill</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#gmodg-96-4-bestaetigung-biogener-anteil-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/gmodg-96-4-bestaetigung-biogener-anteil-2029/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2029.

From 2029, gas, oil and LPG heating systems newly installed in existing buildings must generate at least 10 percent of the heat supplied from biomethane, bio-oil, biogenic LPG or hydrogen (Section 43 GModG). Anyone supplying such buildings commercially with these fuels confirms to the customer with the bill that the requirements are met (Section 96(4) GModG).

Source: https://www.gesetze-im-internet.de/geg/__96.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Data Act: data access built into the design of new connected products</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#eu-data-act-art3-produktgestaltung-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/eu-data-act-art3-produktgestaltung-2026/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 13 September 2026.

Connected products and related services placed on the market after 12 September 2026 must be designed so that users can access their data, including metadata, by default easily, securely, free of charge, in a machine-readable format and, where relevant and technically feasible, directly (Article 3(1) and Article 50 of Regulation (EU) 2023/2854).

Source: https://eur-lex.europa.eu/eli/reg/2023/2854/oj/deu

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Notify the Federal Network Agency of supplying household customers</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg5-anzeige-belieferung"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg5-anzeige-belieferung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: without undue delay after.

Energy suppliers notify the Federal Network Agency without undue delay when they start supplying household customers (Section 5(1) and (2) EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__5.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Notify the end of supplying household customers</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg5-anzeige-beendigung"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg5-anzeige-beendigung/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: at least 3 months before.

Energy suppliers notify the end of supply so that the notification reaches the Federal Network Agency at least three months before the planned end date, and do not stop earlier unless they have filed for insolvency (Section 5(2) EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__5.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Bill and final bill within six weeks</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg40c-rechnung-sechs-wochen"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg40c-rechnung-sechs-wochen/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date: within 6 weeks after.

Energy suppliers provide final customers with the bill at the latest six weeks after the end of the billing period and with the final bill at the latest six weeks after the end of supply; for monthly billing under Section 40b(1) the deadline is three weeks (Section 40c(2) EnWG).

Source: https://www.gesetze-im-internet.de/enwg_2005/__40c.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: GHG quota: report non-public charging of battery electric cars for 2027 to the Federal Environment Agency</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bimschv38-8-ladestrom-bev-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/bimschv38-8-ladestrom-bev-2027/neu/2026-11-24</id>
    <updated>2026-11-24T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 15 November 2027.

For electricity drawn to charge battery electric vehicles outside public charge points, the report to the competent body at the Federal Environment Agency is due by the end of 15 November of the obligation year (Section 8(1) sentence 1 no. 2 of the 38th BImSchV).

Source: https://www.gesetze-im-internet.de/bimschv_38_2017/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Price change on 1 January 2028: notice deadline in default supply</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#grundversorgung-preisaenderung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/grundversorgung-preisaenderung-2028/neu/2026-11-22</id>
    <updated>2026-11-22T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 20 November 2027.

Default suppliers changing their general prices on 1 January 2028 must publish the change at least six weeks in advance, notify customers by letter and post it online. For household customers on special contracts, Section 41(5) EnWG sets a one month notice period.

Source: https://www.gesetze-im-internet.de/stromgvv/__5.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Hydrogen core network: publish the network charge for the following year</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasserstoff-kernnetz-entgelt-veroeffentlichung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasserstoff-kernnetz-entgelt-veroeffentlichung-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 November 2027.

Operators of the hydrogen core network publish the network charge, during the ramp-up phase the ramp-up charge, by 1 November for the following calendar year and correct the publication without delay if the charge changes afterwards (WANDA, GBK-24-01-2#1, operative point 2 sentences 3 and 4, operative point 3).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2024/GBK-24-01-2x1_WANDA/Downloads/Wanda_Festlegung.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: E-invoicing: paper and other formats from 2027 only up to EUR 800,000 prior-year turnover or via EDI</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#ustg-e-rechnung-uebergang-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/ustg-e-rechnung-uebergang-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2027.

For supplies from 1 January 2027, businesses may only send invoices to other businesses on paper or, with the recipient&#x27;s consent, in a format not complying with EN 16931 if their total turnover in the previous year was no more than EUR 800,000, or as an EDI invoice with the recipient&#x27;s consent. Both exceptions end on 31 December 2027 (Section 27(38) UStG).

Source: https://www.gesetze-im-internet.de/ustg_1980/__27.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the government bill, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d draft EnWG) that lowers transmission network charges; the Bundesrat calls for EUR 6.5 billion, so the amount is open. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) draft EnWG).

Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Source: https://dserver.bundestag.de/btd/21/082/2108236.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Electricity and energy tax: estimate of 2027 annual tax by 15 January</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromst-energiest-schaetzung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromst-energiest-schaetzung-2027/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Suppliers with annual returns and advance payments send the main customs office, by 15 January, a sound and traceable estimate of the expected annual tax; below 2,400 euros no notice is needed. On 30 June they estimate again and report by 15 August if the new estimate exceeds 100,000 euros and exceeds the set advance payments by more than 20 per cent (Section 8(6) StromStG, Section 39(5) EnergieStG).

Suppliers with annual returns and advance payments send the main customs office, by 15 January, a sound and traceable estimate of the expected annual tax; below 2,400 euros the estimate is only sent on request of the customs office. On 30 June they estimate again and send it on request, and without request by 15 August if it exceeds 100,000 euros and the annual tax underlying the advance payments by more than 20 per cent (Section 8(6) StromStG, Section 39(5) EnergieStG).

Source: https://www.gesetze-im-internet.de/stromstg/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: MiSpeL: ruling on market integration of storage and charging points</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#mispel-festlegung"/>
    <id>tag:innobu.com,2026-11-24:fristen/mispel-festlegung/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges.

The Federal Network Agency adopted the ruling on 1 October 2026 (ref. 618-25-02). A demarcation option and a flat-rate option set how volumes at storage units and charging points in mixed use are split for EEG support and levy privileges. The ruling was published in the Official Gazette on 7 October 2026 and takes effect upon notification (operative point 8).

Source: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Aufsicht/MiSpeL/start.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: GeLi Gas 2.0 applies</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#geli-gas-2"/>
    <id>tag:innobu.com,2026-11-24:fristen/geli-gas-2/pflicht/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: New supplier switch processes for gas, UTILMD Gas 1.1.

New supplier switch processes for gas, since 1 October 2026 in the UTILMD Gas 1.2 format (AHB and MIG).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2019/BK7-19-0001/BK7-19-0001_Beschluss_Internet.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Gas and hydrogen disclosure on the bill: residual energy mix of the previous year (draft Section 42d EnWG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-42d-gaskennzeichnung-restmix-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-42d-gaskennzeichnung-restmix-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 July 2027.

Under the government bill on the gas and hydrogen internal market package, suppliers of gas or hydrogen state the energy mix with CO2 data on or with the bill to final customers. The duty starts when the act enters into force on the day after promulgation; from 1 July 2027 the flat-rate wording is no longer allowed and shares without proof must be shown with the previous year&#x27;s residual energy mix.

Source: https://dserver.bundestag.de/btd/21/054/2105440.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Gas reserve (government draft): levy on balancing group managers from 1 October 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enwg-35m-gasreserve-umlage-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/enwg-35m-gasreserve-umlage-2027/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 October 2027.

Under the government draft, subject to the Bundestag&#x27;s decision: from the first levy period starting on 1 October 2027, the market area manager passes the costs of the gas reserve on to balancing group managers, per megawatt hour withdrawn at points with interval metering and with standard load profiles. It sets the levy anew for each yearly period starting on 1 October, bills monthly, may charge instalments and publishes the levy six weeks before each levy period starts; in basic gas supply the levy becomes a price component.

Source: https://dserver.bundestag.de/brd/2026/0652-26.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Bill: show the price component for the mandatory biogenic share under Section 43 GModG (Section 3(1) no. 6 CO2KostAufG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#co2kostaufg-biogener-anteil-rechnung-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/co2kostaufg-biogener-anteil-rechnung-2029/neu/2026-11-15</id>
    <updated>2026-11-15T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2029.

Fuel suppliers delivering to buildings with rented housing whose heating falls under Section 43(1) GModG show the price component for the mandatory biogenic share separately on the bill. The rule has applied since 29 July 2026; in practice it bites from 1 January 2029 with the first 10 percent step.

Source: https://www.gesetze-im-internet.de/co2kostaufg/__3.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: KONNI 2.1: second consultation on a conversion fee from L-gas to H-gas closes</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk7-konni-21-konsultation-2026-11"/>
    <id>tag:innobu.com,2026-11-24:fristen/bk7-konni-21-konsultation-2026-11/neu/2026-11-04</id>
    <updated>2026-11-04T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 23 November 2026.

Ruling Chamber 7 is consulting on a draft operative part and the amended standard conversion contract for the THE market area: from 1 April 2027 the market area manager would be allowed to charge balancing group managers a conversion fee in both directions, including from L-gas to H-gas, with seasonal factors and a cap of EUR 0.45/MWh for the short period to 30 September 2027. Comments are due by 23 November 2026.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2026/BK7-26-0006/BK7-26-01-0006_2_Konsultation.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: WasABi: balancing rules for hydrogen apply, data platform from July 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasabi-bilanzierung-wasserstoff-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasabi-bilanzierung-wasserstoff-2028/pflicht/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The hydrogen market area manager and the hydrogen network operators apply the WasABi balancing rules from 1 January 2028 (BK7-24-01-014, operative point 10). They set up the data exchange platform by 1 July 2027 and test it with market participants until 1 January 2028 (operative point 7(d)).

The hydrogen market area manager and the hydrogen network operators apply the WasABi balancing rules from 1 January 2028 (BK7-24-01-014, operative point 10). The market area manager sets up the data exchange platform by 1 July 2027 and tests it with market participants until 1 January 2028 (operative point 7(d)); the hydrogen network operators supply it with the data it needs.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0014/Anlagen/BK7-24-01-0014_Beschluss_Download_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: EU ETS 2 starts: emissions trading for buildings and transport replaces the national BEHG</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#ets2-start-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/ets2-start-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Fine possible → Money is lost.

Source: https://eur-lex.europa.eu/eli/reg/2026/667/oj

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: 2028 levies: publication by the transmission system operators</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#enfg-umlagen-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/enfg-umlagen-2028/neu/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 25 October 2027.

The transmission system operators publish the 2028 CHP levy and offshore grid levy by 25 October 2027. Suppliers and grid operators carry the values into price sheets and grid fee billing.

Source: https://www.gesetze-im-internet.de/enfg/__11.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Surcharge for special grid use: show contributions separately</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#aufschlag-besondere-netznutzung-ausweis-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/aufschlag-besondere-netznutzung-ausweis-2027/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2024/2024_4-Steller/BK8-24-0001/Downloads/BK8-24-0001-A_Festlegung_Download_BF.pdf?__blob=publicationFile&amp;v=4

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: AgNes: network operators identify prosumers and notify suppliers</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#agnes-prosumer-identifikation-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/agnes-prosumer-identifikation-2028/folge/2026-11-01</id>
    <updated>2026-11-01T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-1x3_AgNes/Downloads/FL-Entwurf_DE_DL_BF.pdf?__blob=publicationFile&amp;v=7

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EU ETS 2: report on passing allowance costs on to consumers (Section 43(3) TEHG)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#tehg-ets2-kostenweitergabe-bericht-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/tehg-ets2-kostenweitergabe-bericht-2028/neu/2026-10-28</id>
    <updated>2026-10-28T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 April 2028.

Regulated entities under EU ETS 2, such as gas suppliers, report to the competent authority for calendar years 2027 to 2029, each by the end of 30 April of the following year, the average share of costs from surrendering ETS 2 allowances that they passed on to consumers in the previous year (Section 43(3) TEHG). The first report is due on 30 April 2028, the last on 30 April 2030.

Source: https://www.gesetze-im-internet.de/tehg_2025/__43.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Hydrogen core network: publish the network charge for the following year</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasserstoff-kernnetz-entgelt-veroeffentlichung-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasserstoff-kernnetz-entgelt-veroeffentlichung-2026/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 November 2026.

Operators of the hydrogen core network publish the network charge, during the ramp-up phase the ramp-up charge, by 1 November for the following calendar year and correct the publication without delay if the charge changes afterwards (WANDA, GBK-24-01-2#1, operative point 2 sentences 3 and 4, operative point 3).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2024/GBK-24-01-2x1_WANDA/Downloads/Wanda_Festlegung.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: WasABi: set up the hydrogen data exchange platform</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasabi-datenaustauschplattform-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasabi-datenaustauschplattform-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 July 2027.

For hydrogen balancing under WasABi, the data exchange platform must be set up by 1 July 2027 and tested with market participants in an introduction phase until 1 January 2028; the IT interface specifications are announced to market participants beforehand (BK7-24-01-014, operative point 7(d)).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0014/Anlagen/BK7-24-01-0014_Beschluss_Download_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: WasABi: set up the hydrogen data exchange platform</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasabi-datenaustauschplattform-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasabi-datenaustauschplattform-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: For hydrogen balancing under WasABi, the data exchange platform must be set up by 1 July 2027 and tested with market participants in an introduction phase until 1 January 2028; the IT interface specifications are announced to market participants beforehand (BK7-24-01-0014, operative point 7(d)).

For hydrogen balancing under WasABi, the data exchange platform must be set up by 1 July 2027 and tested with market participants in an introduction phase until 1 January 2028; the IT interface specifications are announced to market participants beforehand (BK7-24-01-014, operative point 7(d)).

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0014/Anlagen/BK7-24-01-0014_Beschluss_Download_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: WasABi: balancing rules for hydrogen apply, data platform from July 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasabi-bilanzierung-wasserstoff-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasabi-bilanzierung-wasserstoff-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 1 January 2028.

The hydrogen market area manager and the hydrogen network operators apply the WasABi balancing rules from 1 January 2028 (BK7-24-01-014, operative point 10). The market area manager sets up the data exchange platform by 1 July 2027 and tests it with market participants until 1 January 2028 (operative point 7(d)); the hydrogen network operators supply it with the data it needs.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0014/Anlagen/BK7-24-01-0014_Beschluss_Download_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: WasABi: balancing rules for hydrogen apply, data platform from July 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#wasabi-bilanzierung-wasserstoff-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/wasabi-bilanzierung-wasserstoff-2028/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: The hydrogen market area manager and the hydrogen network operators apply the WasABi balancing rules from 1 January 2028 (BK7-24-01-0014, operative point 10). They set up the data exchange platform by 1 July 2027 and test it with market participants until 1 January 2028 (operative point 7(d)).

The hydrogen market area manager and the hydrogen network operators apply the WasABi balancing rules from 1 January 2028 (BK7-24-01-014, operative point 10). The market area manager sets up the data exchange platform by 1 July 2027 and tests it with market participants until 1 January 2028 (operative point 7(d)); the hydrogen network operators supply it with the data it needs.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-0014/Anlagen/BK7-24-01-0014_Beschluss_Download_BF.pdf?__blob=publicationFile

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Federal subsidy for transmission network costs 2027 to 2029</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb-zuschuss-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/uenb-zuschuss-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Under the government bill, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 that lowers transmission network charges. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG draft).

Under the act passed by the Bundestag on 12 November 2026, transmission system operators receive a subsidy of EUR 5.525 billion a year for 2027 to 2029 (Section 24d EnWG) that lowers transmission network charges; the Bundesrat did not call the mediation committee on 20 November 2026, and promulgation is pending. Transmission system operators publish their charge with and without the subsidy, distribution system operators also publish a notional network charge without it, and suppliers point out the subsidy on the bill (Section 118(5b) EnWG).

Source: https://dserver.bundestag.de/btd/21/082/2108236.pdf

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EU ETS 2: report 2026 fuel emissions (gas suppliers)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#tehg-ets2-emissionsbericht-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/tehg-ets2-emissionsbericht-2026/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 30 April 2027.

Parties responsible under EU fuel emissions trading, such as gas suppliers, determine emissions of the fuels placed on the market from reporting year 2025 and report them by the end of 30 April of the following year (Section 43(1) TEHG), i.e. for 2026 by 30 April 2027. This report runs alongside the national report under Section 7 BEHG.

Source: https://www.gesetze-im-internet.de/tehg_2025/__43.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: EU ETS 2: first surrender of allowances for 2028 emissions</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#tehg-ets2-abgabe-zertifikate-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/tehg-ets2-abgabe-zertifikate-2029/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 May 2029.

Regulated entities under the EU ETS 2, for example suppliers placing natural gas or heating oil on the market for buildings and transport, surrender allowances for 2028 emissions for the first time by 31 May 2029, then each year by 31 May for the previous year (Article 30k(2)(d) of Directive 2003/87/EC, applicable by virtue of Article 2 of Regulation (EU) 2026/667). The wording of Section 7(2) TEHG has not been adapted to the postponement.

Source: https://eur-lex.europa.eu/eli/reg/2026/667/oj

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: EU ETS 2: first surrender of allowances for 2028 emissions</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#tehg-ets2-abgabe-zertifikate-2029"/>
    <id>tag:innobu.com,2026-11-24:fristen/tehg-ets2-abgabe-zertifikate-2029/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Regulated entities under the EU ETS 2, for example suppliers placing natural gas or heating oil on the market for buildings and transport, surrender allowances for 2028 emissions for the first time by 31 May 2029, then each year by 31 May for the previous year (Article 30e(2) and Article 30k of the ETS Directive, transposed in Section 7(2) TEHG).

Regulated entities under the EU ETS 2, for example suppliers placing natural gas or heating oil on the market for buildings and transport, surrender allowances for 2028 emissions for the first time by 31 May 2029, then each year by 31 May for the previous year (Article 30k(2)(d) of Directive 2003/87/EC, applicable by virtue of Article 2 of Regulation (EU) 2026/667). The wording of Section 7(2) TEHG has not been adapted to the postponement.

Source: https://eur-lex.europa.eu/eli/reg/2026/667/oj

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Electricity and energy tax: choose monthly or annual filing for 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromst-energiest-wahlrecht-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromst-energiest-wahlrecht-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2026.

Suppliers liable for electricity or energy tax decide how they file for 2027. For electricity annual filing is the default; anyone wanting monthly filing declares this to the main customs office by 31 December 2026 (Section 8(2) StromStG). For natural gas monthly filing is the default; annual filing must be declared in writing before the calendar year starts and applies for full calendar years until revoked (Section 39(1) and (2) EnergieStG).

Source: https://www.gesetze-im-internet.de/stromstg/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Electricity and energy tax: choose monthly or annual filing for 2027</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromst-energiest-wahlrecht-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromst-energiest-wahlrecht-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Suppliers liable for electricity or energy tax choose between monthly and annual filing. The declaration for 2027 must reach the main customs office by 31 December 2026 (Section 8(2) StromStG); for energy tax it must be there before the start of the calendar year (Section 39(2) EnergieStG).

Suppliers liable for electricity or energy tax decide how they file for 2027. For electricity annual filing is the default; anyone wanting monthly filing declares this to the main customs office by 31 December 2026 (Section 8(2) StromStG). For natural gas monthly filing is the default; annual filing must be declared in writing before the calendar year starts and applies for full calendar years until revoked (Section 39(1) and (2) EnergieStG).

Source: https://www.gesetze-im-internet.de/stromstg/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Electricity and energy tax: estimate of 2027 annual tax by 15 January</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromst-energiest-schaetzung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromst-energiest-schaetzung-2027/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 15 January 2027.

Suppliers with annual returns and advance payments send the main customs office, by 15 January, a sound and traceable estimate of the expected annual tax; below 2,400 euros the estimate is only sent on request of the customs office. On 30 June they estimate again and send it on request, and without request by 15 August if it exceeds 100,000 euros and the annual tax underlying the advance payments by more than 20 per cent (Section 8(6) StromStG, Section 39(5) EnergieStG).

Source: https://www.gesetze-im-internet.de/stromstg/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Electricity and energy tax: estimate of 2027 annual tax by 15 January</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromst-energiest-schaetzung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromst-energiest-schaetzung-2027/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: Suppliers filing annually with advance payments send the main customs office by 15 January a traceable estimate of the expected annual tax, make a further estimate as of 30 June and report it by 15 August if it exceeds EUR 100,000 and deviates by more than 20 percent from the assessment (Section 8(6) StromStG, Section 39(5) EnergieStG).

Suppliers with annual returns and advance payments send the main customs office, by 15 January, a sound and traceable estimate of the expected annual tax; below 2,400 euros the estimate is only sent on request of the customs office. On 30 June they estimate again and send it on request, and without request by 15 August if it exceeds 100,000 euros and the annual tax underlying the advance payments by more than 20 per cent (Section 8(6) StromStG, Section 39(5) EnergieStG).

Source: https://www.gesetze-im-internet.de/stromstg/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: Electricity and energy tax: estimate of 2027 annual tax by 15 January</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromst-energiest-schaetzung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromst-energiest-schaetzung-2027/folge/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: No direct legal consequence → Fine possible.

Source: https://www.gesetze-im-internet.de/stromstg/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Electricity and energy tax 2026: annual return by 31 May, payment by 25 June</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#stromst-energiest-jahresanmeldung-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/stromst-energiest-jahresanmeldung-2026/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 May 2027.

Suppliers filing annually file electricity and energy tax for 2026 with the main customs office by 31 May 2027 and pay it, after credit for advance payments, by 25 June 2027 (Section 8(4) StromStG, Section 39(3) EnergieStG). With monthly filing the 15th of the following month applies (Section 8(3) StromStG).

Source: https://www.gesetze-im-internet.de/stromstg/__8.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: 2028 network charges: publication by 15 October</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#netzentgelte-veroeffentlichung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/netzentgelte-veroeffentlichung-2028/folge/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.gesetze-im-internet.de/enwg_2005/__20.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Legal consequence changed: 2027 network charges: publication by 15 October</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#netzentgelte-veroeffentlichung-2027"/>
    <id>tag:innobu.com,2026-11-24:fristen/netzentgelte-veroeffentlichung-2027/folge/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="folge" label="Legal consequence changed"/>
    <content type="text">Legal consequence changed: Regulator can enforce → Fine possible.

Source: https://www.gesetze-im-internet.de/enwg_2005/__20.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Standard metering contracts for default metering operators</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msv-gmsb"/>
    <id>tag:innobu.com,2026-11-24:fristen/msv-gmsb/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: BK6-24-125: Since 1 July 2026 default metering point operators conclude metering contracts only on the MSV-AN and MSV-LF templates and publish them for conclusion in text form. Electricity network operators and all metering point operators conclude the framework contract (MSB-RV) in its amended version and adapt existing contracts.

BK6-24-125: Since 1 July 2026 default metering point operators conclude metering contracts only on the MSV-AN and MSV-LF templates, adapt existing metering contracts to them and publish them for conclusion in text form. Electricity network operators and all metering point operators conclude the framework contract (MSB-RV) in its amended version and adapt existing contracts.

Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK06/BK6_83_Zug_Mess/846_messstellenvertrag/Messstellenvertrag_node.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Delete or anonymise personal metering data (MsbG maximum periods)</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg-loeschfrist-messwerte-2026"/>
    <id>tag:innobu.com,2026-11-24:fristen/msbg-loeschfrist-messwerte-2026/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 31 December 2026.

Metering point operators must delete or anonymise personal metering data no later than three years after the end of the year of collection, i.e. data from 2023 by the end of 2026 (Section 60(6) MsbG). Network operators keep data used for network operation, planning and forecasts and for the concession fee for at most one year after the end of the year of collection (Section 66(3) sentence 2 no. 1), suppliers likewise for energy volume forecasts (Section 69(3) sentence 2 no. 1); for data collected in 2025 this period ends on 31 December 2026. For other purposes three years apply unless a Federal Network Agency determination provides otherwise.

Source: https://www.gesetze-im-internet.de/messbg/__60.html

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Methane Regulation: report the methane intensity of production</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#methan-vo-methanintensitaet-meldung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/methan-vo-methanintensitaet-meldung-2028/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 5 August 2028.

By 5 August 2028 and every year thereafter, producers in the Union and importers report, for supply contracts concluded or renewed since 4 August 2024, the methane intensity of the production of the natural gas, crude oil and coal they place on the Union market (Article 29(1) Regulation (EU) 2024/1787).

Source: https://eur-lex.europa.eu/legal-content/DE/TXT/?uri=CELEX:32024R1787

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Methane Regulation: report the methane intensity of production</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#methan-vo-methanintensitaet-meldung-2028"/>
    <id>tag:innobu.com,2026-11-24:fristen/methan-vo-methanintensitaet-meldung-2028/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: By 5 August 2028 and every year thereafter, importers report the methane intensity of the production of natural gas, crude oil and coal placed on the Union market under supply contracts concluded or renewed since 4 August 2024 (Article 29(1) Regulation (EU) 2024/1787).

By 5 August 2028 and every year thereafter, producers in the Union and importers report, for supply contracts concluded or renewed since 4 August 2024, the methane intensity of the production of the natural gas, crude oil and coal they place on the Union market (Article 29(1) Regulation (EU) 2024/1787).

Source: https://eur-lex.europa.eu/legal-content/DE/TXT/?uri=CELEX:32024R1787

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Added: Methane Regulation: meet maximum methane intensity values</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#methan-vo-methanintensitaet-hoechstwerte-2030"/>
    <id>tag:innobu.com,2026-11-24:fristen/methan-vo-methanintensitaet-hoechstwerte-2030/neu/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="neu" label="Added"/>
    <content type="text">Added: Date 5 August 2030.

By 5 August 2030 and every year thereafter, producers in the Union and importers prove for supply contracts concluded or renewed after 5 August 2030 that the methane intensity of production is below the maximum values the Commission sets by delegated act (Article 29(2) Regulation (EU) 2024/1787).

Source: https://eur-lex.europa.eu/legal-content/DE/TXT/?uri=CELEX:32024R1787

Note: A classification for typical market roles, not a review of your individual case and not legal advice. The calendar doesn&#x27;t replace your own deadline review.</content>
  </entry>
  <entry>
    <title>Obligation text changed: Methane Regulation: meet maximum methane intensity values</title>
    <link rel="alternate" type="text/html" href="https://www.innobu.com/en/deadline-calendar-energy-transition.html#methan-vo-methanintensitaet-hoechstwerte-2030"/>
    <id>tag:innobu.com,2026-11-24:fristen/methan-vo-methanintensitaet-hoechstwerte-2030/pflicht/2026-10-27</id>
    <updated>2026-10-27T00:00:00Z</updated>
    <category term="pflicht" label="Obligation text changed"/>
    <content type="text">Obligation text changed.

Before: By 5 August 2030 and every year thereafter, importers prove for supply contracts concluded or renewed after 5 August 2030 that the methane intensity of production is below the maximum values the Commission sets by delegated act (Article 29(2) Regulation (EU) 2024/1787).

By 5 August 2030 and every year thereafter, producers in the Union and importers prove for supply contracts concluded or renewed after 5 August 2030 that the methane intensity of production is below the maximum values the Commission sets by delegated act (Article 29(2) Regulation (EU) 2024/1787).

Source: https://eur-lex.europa.eu/legal-content/DE/TXT/?uri=CELEX:32024R1787