Electricity cost review from 2029: what the draft data collection requires and where comments can still land by 7 December
On 6 November 2026 the Federal Network Agency (BNetzA) published the draft under which electricity distribution system operators have their 2026 costs audited. It asks for income statements going back to 2022, a separate form for every lessor and for large group service providers, and a report as a searchable PDF/A. The financial year in question ends in five weeks.
The cost data determination (BK8-26-04#7 to #12) sets which documents electricity DSOs regulated by the Federal Network Agency or on behalf of a federal state must file for the audit of the base year 2026; comments on the draft are due by 7 December 2026. The audit produces the starting level of the revenue caps for the fifth regulatory period, 2029 to 2033. Under the draft, documents are due by 1 July 2027 in the regular procedure and by 30 September 2027 with an approved simplified procedure, submitted only through the BNetzA energy data portal. Operators file a protected survey form with income statement data for 2022 to 2026, separate forms for lessors, fully acquired networks and up to five affiliated service providers above a threshold of five percent of the adjusted 2026 revenue cap, and a report for each form. Breaching the enforceable determination can, under the draft, bring a fine of up to 100,000 euros.
What the consultation covers
Ruling Chamber 8 wants to fix which documents an electricity distribution system operator supplies for the audit of its 2026 costs, in which form and by when. Six case numbers carry the procedure: BK8-26-04#7 for the agency's own jurisdiction and #8 to #12 for the states of Berlin, Brandenburg, Bremen, Hamburg and Schleswig-Holstein, whose tasks the agency performs on their behalf (Organleihe). On 6 November 2026 the chamber published the draft determination, an annex on the report, a completion guide with data definitions and the survey form in version 0.9.
For operators with at least 100,000 connected customers or a network that crosses a state border, the agency acts in its own right. Excluded are closed distribution systems under Section 110 EnWG and very small operators under operative paragraph 16.7 of the RAMEN determination, meaning operators with an adjusted revenue cap of up to 500,000 euros (excluding upstream network costs and avoided network charges) that have opted for that rule, where their regulator has introduced it. Operators supervised by a state regulator without Organleihe get their rules from there, and dates and scope can differ.
Legally, the procedure is a transition: the audit still takes place in the fourth period but already applies RAMEN Strom and the new cost determination StromNEF, both part of the NEST package that replaces the incentive regulation ordinance (ARegV) and the electricity network charges ordinance (StromNEV). Gas networks went through the same audit a year earlier, with 2025 as the base year; our article on RAMEN Gas and the fifth regulatory period explains what changed there.
Comments go as a PDF by email to Poststelle.BK8@BNetzA.de, subject line „Festlegung Kostendaten“. BNetzA plans to publish them. Contact details and signatures therefore stay out of the attachment, and anyone naming trade secrets adds a redacted version; without one, the chamber may assume consent to third-party access under Section 71 sentence 3 EnWG, and the unredacted version becomes accessible.
Two submission deadlines in 2027
In the regular procedure, all documents are due in full at the agency by Thursday, 1 July 2027. Operators whose application for the simplified procedure has been approved have until Thursday, 30 September 2027. Both dates hang on the start of the period on 1 January 2029, which RAMEN Strom fixes, and to the efficiency benchmarking that builds on the audited costs; data delivered by the deadline are to be decisive "in principle".
Because many operators in the regular procedure close their accounts on a fast-close schedule, the chamber expects their figures by March or April 2027 at the latest. It gives operators in the simplified procedure three more months because they often depend on outside consultants, and said so in earlier proceedings: parallel procedures and bottlenecks at consulting firms made a submission at the end of June impossible. Anyone may file early.
Consultation closes
Comments on the draft cost data determination must have arrived.
Application for the simplified procedure
Operators who apply and are approved file their cost data in September and stay in the simplified procedure for the whole period.
Data for efficiency benchmarking
Structural data for 2026 under draft BK8-26-04#13, regular procedure only.
Cost data, regular procedure
Survey forms, reports and evidence through the energy data portal.
Cost data, simplified procedure
Same documents, three months later.
So the application on 31 March also decides the submission date. Operators may file it if their adjusted 2026 revenue cap stays below the threshold under operative paragraph 16.3 RAMEN Strom: the euro amount reached when distribution system operators are included until 90 percent of all adjusted base-year revenue caps are covered, net of upstream network costs and avoided network charges. Miss it and you end up in the regular procedure with benchmarking for the whole period, filing in July; this and other dates are in our overview of regulatory deadlines for network operators to 2031. What is due on 30 April is covered in our article on data collection for electricity efficiency benchmarking.
What the survey form asks for
At the core sits a protected XLSX survey form whose structure must not change: no sheets, columns or rows added or deleted. An unprotected copy is there for preparation only; only the protected form may be submitted. In a first step the figures must match the audited annual or activity accounts. Any adjustment the operator considers necessary goes separately into sheet A1.b and into the report, explained and evidenced booking by booking.
| Item | Network operator | Lessor | Service provider |
|---|---|---|---|
| Income statement as per accounts (sheet A1.a) | 2022 to 2026 | 2025 and 2026 | 2025 and 2026 |
| Reconciliation to cost accounting (sheet A1.b) | 2022 to 2026 | 2025 and 2026 | 2025 and 2026 |
| Balance sheet (sheet A2.a) | 2025 and 2026 | 2025 and 2026 | 2025 and 2026 |
| Detailed explanation of the income statement reconciliation in the report | 2026 | 2026 | 2026 |
| Balance sheets in the report | 2025 and 2026 set out and evidenced | 2025 and 2026 explained in detail | 2025 and 2026 explained in detail |
| Special features of the financial year in the report | yes | no | no |
Five years of income statements match past cost review practice; in its gas consultation draft, Ruling Chamber 9 wanted only three financial years from gas operators, 2023 to 2025, which BDEW and VKU welcomed in principle. What the associations criticised there was that lessors and service providers were to supply three years instead of two, and that operators were to explain three years in the report rather than just the base year. The electricity draft keeps five years for the operator and asks lessors and service providers for 2025 and 2026 only. The annex justifies the five years with the review of special features of the financial year under operative paragraph 5.4 RAMEN Strom: if a cost type in 2026 deviates by more than 15 percent from the 2022 to 2025 average, the operator explains why in the report. Beyond that, the 2026 income statement reconciliation needs a detailed explanation, and the 2025 and 2026 balance sheets have to be set out and evidenced; the chamber does not request the 2022 to 2025 accounts again because it already holds them from the unbundling duties under Section 6b EnWG.
On the balance sheet, less is needed. Because RAMEN Strom switches to a weighted average cost of capital (WACC), the form asks for the balance sheet only at top-line level, and balance sheet values may not be adjusted. Adding planned figures to base-year costs is not allowed under operative paragraph 3.2 StromNEF.
Three items deserve particular attention:
- Cost shares that are not subject to efficiency benchmarking (KAnEu) for 2026 go into sheet C, for the first time in the simplified procedure as well, since RAMEN Strom no longer has an exemption; the determination currently lists only three such items: upstream network costs, benefits in kind for the operator's own network staff, and the charges paid to the metering point operator for smart metering systems and control devices. The chamber explicitly rules out asking for them later; whatever is missing from sheet C stays missing.
- For each "other" line, the ten largest single items of 2025 and 2026 go into sheet B.a, each explained in the report.
- The report states whether the operator built charging infrastructure in 2026, for itself, for affiliates or for third parties, in which activity it booked costs and revenues and how much, split into material and staff costs.
Lessors, service providers and acquired networks
For group network companies and for municipal utilities that lease their grid from the municipality or a parent company, most of the work lies outside their own form. The draft asks for further survey forms, each with its own report in the same depth as the operator's, plus the lease and service contracts with all annexes.
One form per lessor
No de minimis threshold, sub-lessors included. The chamber needs complete data for the costs and later for the capital cost deduction. A lessor number from an earlier cost review carries over; a new one is requested from the Federal Network Agency.
Up to five service providers
Affiliates under Section 6b(2) EnWG whose services exceed five percent of the adjusted 2026 revenue cap, excluding upstream network costs and avoided network charges.
Acquired networks
A network taken over in full after the end of the 2026 base year and before the submission deadline gets its own form with its own network number, requested from the Federal Network Agency.
Measured against the five-percent threshold is the sum of all services a provider renders to the operator, energy-specific or not, and whether or not the provider has separate activity accounts. The split by type of service happens only in the form. The second rule bites harder: if a shared provider exceeds the threshold for one affiliated operator, every affiliated operator files a form for it, even where it stays below five percent. In the chamber's example, a provider at twelve percent for operator A becomes reportable for sister companies B and C too. Even so, no operator files more than five provider forms.
Sub-providers, the service provider's own providers, are not covered at first. It reserves the right to request forms and reports case by case, because sub-services can make up a large share of a group provider's costs. Operators with such a chain would do well not to start collecting those documents only once the request arrives.
What goes into the report
An expert third party must be able to follow the cost-type accounting in the form from the report alone, without further information. The annex sets its outline: company description, network cost determination under operative paragraphs 4 ff. StromNEF in eleven sub-points, and an appendix with the 2026 accounts, the organisation chart and the chart of accounts, account plan and cost centre plan.
On allocation keys the annex goes into detail. It wants the 2026 keys that assign costs to divisions and activities explained, along with every qualitative change since 2021, the last base year. It names one case explicitly: how software costs are split between the network and the default metering point operation for modern metering devices and smart metering systems, including SaaS subscriptions and licences running less than a year. Sheet F.a holds the 2026 trial balance of income-statement accounts with their mapping to the income statement and the keys used; the account plan goes along electronically. The organisation chart as of 31 December 2026 gives the headcount of every unit, including functions such as regulatory management, network billing and meter management.
For fixed assets, every network section added or removed after 31 December 2021 gets its own network ID (the identifier in the survey form, not the network number of an acquired network). Software belongs exclusively in the imputed asset sheet B2.b, not in other fixed assets, and the operator confirms that explicitly in the report. BNetzA wants the 2026 fixed-asset schedule with the cost review, not only with the regulatory account application for 2026 on 31 December 2027, which would come too late for the audit. For the base year, useful lives still follow Annex 1 StromNEV; the new asset groups with fixed useful lives under Annex 1 StromNEF apply only from the capital cost mark-up for 2029.
Metering has its own sub-point. The operator confirms that it ran the default metering point operation itself in 2026, or names the operator it transferred it to. It lists the IT systems for conventional meters, such as energy data management and meter management, and explains whether the same systems also serve modern metering devices and smart metering systems, how costs are separated and who pays which share of the licence fees. Assets transferred to the default metering point operator appear as disposals.
Two individual queries concern only some operators: proof of the trade tax multiplier is needed only from those reporting a different rate than in the fourth period, and the reactive power cost query applies only to operators of high-voltage networks.
How to submit
Submission runs only through BNetzA's energy data portal (Energiedaten-Portal), in the procedure „Bestimmung des Ausgangsniveaus für die 5. RP für Elektrizitätsverteilernetze“. The draft rules out email, download links, fax and post. The formal rules are tight:
- All documents go into ZIP files, without a password but encrypted before upload with the portal's eCrypt program.
- Each file name contains the creation date, the last five digits of the operator number, a running number and a content label; the example in the draft reads "1000xxx_20270628_EHB-NB" and does not follow that list exactly.
- A content list of all ZIP files also goes to the chamber by email and is updated with every later delivery.
- The report must be machine-searchable, tables included, and come as PDF/A, not PDF/A-3. Conformance level "a" is preferred, then "u", with "b" as the last resort.
What the draft provides for missing or late documents
No legal consequence attaches to the comment itself. It is voluntary; operators who do not comment by 7 December leave their objections out of this procedure, and the scope only becomes binding with the determination.
For the later submission the draft names two instruments. Anyone who breaches the enforceable order with intent or through negligence commits an administrative offence under Section 95(1) sentence 1 no. 3a EnWG, with fines of up to 100,000 euros. It can also enforce the duties with coercive fines under Section 94 EnWG after a warning. Financially, the burden of proof often weighs more: the operator has to show and evidence that its costs are necessary for running the network, and if it fails, the authority may apply flat-rate assumptions. For this, the draft relies on the Federal Court of Justice (decision of 10 November 2015, EnVR 26/14).
Where comments can land
This consultation is the last chance before the determination to influence scope and dates; a later appeal would not have suspensive effect (Section 76(1) EnWG). How far apart the positions are shows in the gas procedure and in criticism of the cost review.
"In the associations' view, imposing fines is not a suitable means of enforcing data deliveries that are brought forward and cannot be met in practice."
BDEW and VKU, comments on the gas cost review, 10 February 2026, on the planned submission of fixed assets by 31 March there (our translation)
In the gas procedure, BDEW and VKU objected that the data scope grew elsewhere even though NEST was meant to cut the workload, and proposed calculating depreciation and the WACC return in the form itself so the chamber would not have to check differently built calculations. Pushback from the other side comes from the Bundesverband Neue Energiewirtschaft (bne), an association of new market players. According to pv magazine, it saw in June 2026 "presumably a deficient cost review by the regulators" (our translation) and called for consistent cost control. Ruling Chamber 8 justifies the scope by wanting to avoid follow-up questions during the audit. Whatever the form leaves out, the chamber can request case by case, as it already announces for sub-providers.
In our reading, electricity operators have these points in particular to raise:
| Point in the draft | Why it carries effort or risk |
|---|---|
| Income statements 2022 to 2026 in the form | Gas made do with three years; whether special features of the financial year can be spotted with fewer prior years is a question for the comment |
| Submission on 1 July 2027 | Accounts of small lessors and group service providers are often ready later; the benchmarking data are due two months earlier |
| Service provider forms for all affiliated operators | Required even below the five-percent threshold once a sister company exceeds it |
| 2026 fixed-asset schedule with the cost review | Six months earlier than with the regulatory account so far |
| Survey form in version 0.9 | Formula errors and structural issues are most effectively reported now |
In the gas procedure, BDEW and VKU wrote that Ruling Chamber 9 had, "with few exceptions", not carried their pre-test comments into the consultation draft. Commenting is still worth it. In the reasoning of the determination, the chamber sets out the main points of the comments it receives; a problem nobody raises cannot appear there.
What operators need to get done by July 2027
Just under two weeks remain until 7 December, five until the base year ends. Preparing the submission therefore runs alongside the comment, not after the determination.
Six steps to submission
-
By 7 December: read the draft, comment
Accounting, fixed-asset accounting and regulatory management go through the draft, the annex on the report and form 0.9 together and collect what cannot be done in 2027. Comments go in directly or through BDEW, VKU or GEODE, with a redacted version if they contain trade secrets.
-
In December: list lessors and service providers
List every lease, calculate the five-percent threshold against the adjusted 2026 revenue cap and agree with sister companies which provider exceeds it for whom.
-
At year-end: document the 2026 keys and trial balance
Write down the 2026 keys and their changes since 2021 while the people responsible can still explain them, and split software and SaaS costs cleanly between the network and default metering point operation.
-
By 31 March 2027: decide on the procedure
Applying for the simplified procedure moves the submission to September and binds you for the whole period.
-
By end of May: get the accounts audited
Operator, lessors and service providers schedule their 2026 accounts so the audit opinions are in before June. Fixed-asset accounting fills in network IDs and the 2026 asset schedule in parallel.
-
Before June: test portal, eCrypt and PDF/A
Try portal access, encryption and PDF/A output with a test file.
How regulatory dates like these turn into a running work plan at a network operator is described on our page on implementing regulation at grid operators. More articles are collected in the topic area grid and low voltage.
Deadline, market roles, systems
Comments by Electricity cost review from 2029: consultation on data collection for the starting level closes
Applicability: Electricity DSOs regulated by the Federal Network Agency, including on behalf of Berlin, Brandenburg, Bremen, Hamburg and Schleswig-Holstein; the other federal states set their own data collection rules.
If the deadline is missed: No direct legal consequence Commenting is voluntary. Operators that do not comment by 7 December 2026 do not bring their objections into this procedure; which documents are due and when only becomes binding with the final decision. Legal basis ↗
- Electricity grid operatoraffectedCan comment on the draft until 7 December and plans the submission of cost data for the starting level by 1 July 2027.Typically affected: Regulatory management, controlling, SAP IS-U / S/4HANA Utilities
Due by Electricity cost review from 2029: submit documents for the starting level (draft determination BK8-26-04#7 to #12)
Applicability: Electricity DSOs under federal responsibility and under delegated administration for the states named. Operators in the simplified procedure have until 30 September 2027. Date and scope are final only once the determination is adopted.
Procedure: Draft ruling under consultation (6 November 2026, BK8-26-04#7 bis #12, comments by 7 December 2026). Proceedings at the Federal Network Agency ↗
If the deadline is missed: Fine possible Under the draft, breaching the enforceable determination is an administrative offence under Section 95(1) no. 3(a) EnWG; the Federal Network Agency can also enforce submission with coercive fines under Section 94 EnWG. Legal basis ↗
- Electricity grid operatorcheck applicabilityUnder the draft, plans the base-year cost documents for the starting level by 1 July 2027 (simplified procedure 30 September 2027) and checks which systems supply the data.Typically affected: Regulatory management, controlling, SAP IS-U / S/4HANA Utilities
A classification for typical market roles, not a review of your individual case and not legal advice. Whether an obligation applies to your company (thresholds, exemptions) is for your legal department or counsel to confirm. The calendar doesn't replace your own deadline review. Information as of: 22 November 2026.
Further reading
Frequently asked questions
The cost review is the regulator's audit of a network operator's costs in one base year. It produces the starting level on which the revenue caps of an entire regulatory period are built. For electricity distribution networks the base year is 2026, and the fifth regulatory period begins on 1 January 2029.
Comments must reach Ruling Chamber 8 by Monday, 7 December 2026, as a PDF attached to an email to Poststelle.BK8@BNetzA.de with the subject line „Festlegung Kostendaten“. The Federal Network Agency intends to publish the comments, so anyone naming trade secrets adds a redacted version.
Under the draft, every electricity DSO regulated by the Federal Network Agency or on behalf of Berlin, Brandenburg, Bremen, Hamburg and Schleswig-Holstein, except very small operators that have opted for the very small operator rule, and closed distribution systems. The regular procedure deadline is Thursday, 1 July 2027; with an approved simplified procedure it is Thursday, 30 September 2027. Operators supervised by the other federal states receive their rules from their state regulator.
When it is affiliated with the network operator and its services exceed five percent of the adjusted 2026 revenue cap, excluding upstream network costs and avoided network charges. At most the five largest providers are covered. If one affiliated operator crosses the threshold for a shared provider, every affiliated operator files a form for that provider.
The network operator enters its income statements for 2022 to 2026 and its balance sheets for 2025 and 2026; lessors and service providers enter 2025 and 2026 only. A detailed explanation is needed for the 2026 income statement reconciliation and any cost type that deviates in 2026 by more than 15 percent from the 2022 to 2025 average; the 2025 and 2026 balance sheets have to be set out and evidenced, for lessors and service providers in detail as well.
Commenting on the consultation is voluntary. For the later submission, the draft cites an administrative offence under Section 95(1) sentence 1 no. 3a EnWG with a fine of up to 100,000 euros, and coercive fines under Section 94 EnWG. If an operator cannot prove its costs are necessary for running the network, the authority may apply flat-rate assumptions.
Let's collaborate
One contact, a team behind it
Thirty minutes on what you're working on, whether grid, metering, market processes, heat, IT architecture or AI. Afterwards you'll know how we'd approach it and who would sit at the table.
Energy and measurement technology since 2010 · innobu GmbH since 2014 · Based in Schleswig-Holstein, Germany
From the first call to the steering committee: whoever leads the first call stays your contact, with established partners in the project. Direct: info@innobu.com