BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//innobu//Fristenkalender Energiewende//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:innobu Deadline calendar: German energy transition
X-WR-TIMEZONE:Europe/Berlin
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:msbg-3-3a-aenderungsfrist@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20230527
DTEND;VALUE=DATE:20230528
SUMMARY:Applies from: MsbG Section 3(3a): requested meter changes within on
 e month (Law · in force)
DESCRIPTION:If a connection owner or user requests a change or addition to 
 the meter in the low-voltage grid\, for instance for a cascade connection\
 , the metering point operator carries it out within one month of receiving
  the order. After six weeks the connection owner may have the work done by
  a qualified third party at its own cost.\n\nSource: https://www.gesetze-i
 m-internet.de/messbg/__3.html\n\nIf the deadline is missed: After six week
 s the connection owner may have the work done by a qualified third party (
 Section 3(3a) sentence 2 MsbG). The Federal Network Agency can order compl
 iance under Section 76 MsbG and enforce it with coercive fines under Secti
 on 94 EnWG (Section 76(4) MsbG)\; an association's injunction claim failed
  because\, according to the Higher Regional Court of Schleswig (13 Novembe
 r 2025\, 6 U 36/24)\, the provision is neither a market conduct rule nor a
  consumer protection law.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg
 -3-3a-aenderungsfrist
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:solarspitzen-negative-preise@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20250225
DTEND;VALUE=DATE:20250226
SUMMARY:Applies from: Solar Peak Act: no EEG payment at negative prices for
  new plants (Law · in force)
DESCRIPTION:For plants commissioned from 25 February 2025\, the reference v
 alue drops to zero in every period with a negative spot market price. Plan
 ts below 100 kW are only covered from the end of the year in which a smart
  metering system is installed.\n\nSource: https://www.gesetze-im-internet.
 de/eeg_2014/__51.html\n\nIf the deadline is missed: For periods with a neg
 ative spot price the reference value drops to zero under Section 51(1) EEG
 \, so no payment claim arises\; Section 51a EEG extends the support period
  in return. An operator on the fallback tariff who does not report the vol
 ume fed in during such periods under Section 51(3) EEG loses 5 percent of 
 the monthly claim per day affected.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#sola
 rspitzen-negative-preise
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:14a-modul-3@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20250401
DTEND;VALUE=DATE:20250402
SUMMARY:Applies from: §14a EnWG module 3: offer and bill the time-variable
  network charge (Regulatory ruling · in force)
DESCRIPTION:Since 1 April 2025\, distribution system operators offer and bi
 ll a time-variable network charge with three tariff levels to operators of
  controllable consumption devices. Tariff levels and the quarters they app
 ly in go on the annual price sheet. Since May 2026 the Federal Network Age
 ncy has been opening enforcement proceedings against grid operators that d
 o not implement module 3 or do so inadequately.\n\nSource: https://www.bun
 desnetzagentur.de/SharedDocs/Pressemitteilungen/DE/2026/20260528_14a.html\
 n\nIf the deadline is missed: The Federal Network Agency enforces ruling B
 K8-22/010-A with coercive fines under Section 94 EnWG (EUR 1\,000 to EUR 1
 0 million) and names the companies concerned publicly (Section 74 EnWG)\; 
 by 13 October 2026 it had threatened four network operators with a fine an
 d imposed none. That list names only network operators\, but in 2026 the a
 gency did impose coercive fines to enforce supplier duties under Sections 
 40 and 41 EnWG (against one electricity supplier EUR 100\,000 on 31 March 
 2026 and EUR 175\,000 on 31 July 2026\, case 4.07.01/8#2\, not yet final).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#14a-
 modul-3
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nis2-in-kraft@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20251206
DTEND;VALUE=DATE:20251207
SUMMARY:Applies from: German NIS2 implementation act in force (Law · in fo
 rce)
DESCRIPTION:In force since 6 December 2025 with no general implementation p
 eriod: registration within three months (Section 33 BSIG\; network operato
 rs outside NIS2 by 6 March 2026 under Section 5d(4) EnWG)\, risk managemen
 t\, reporting within 24 and 72 hours\, management liability.\n\nSource: ht
 tps://www.recht.bund.de/bgbl/1/2025/301/VO.html\n\nIf the deadline is miss
 ed: For energy networks and energy installations\, Sections 5c to 5e EnWG 
 replace the BSIG duties. Under Section 95(2) to (4) EnWG\, breaches under 
 Section 95(1) nos. 3b to 3e carry fines of up to EUR 10 million for essent
 ial and EUR 7 million for important entities\, or 2% and 1.4% of worldwide
  turnover above EUR 500 million. A missed registration under Section 33 BS
 IG can be fined up to EUR 500\,000 (Section 65(2) no. 6 BSIG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#nis2
 -in-kraft
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:lieferanten-absicherungsstrategie@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20251223
DTEND;VALUE=DATE:20251224
SUMMARY:Applies from: Electricity suppliers: duty to hold adequate hedging 
 strategies (Section 5(4a) EnWG) (Law · in force)
DESCRIPTION:Electricity suppliers serving household customers must hold and
  follow adequate hedging strategies against wholesale price risk. The Fede
 ral Network Agency can request the strategies at any time and demand chang
 es.\n\nSource: https://www.gesetze-im-internet.de/enwg_2005/__5.html\n\nIf
  the deadline is missed: Under Section 5(4a) sentence 3 EnWG the Federal N
 etwork Agency can request the hedging strategy at any time and demand chan
 ges. If the supplier's economic capability is not ensured\, it can prohibi
 t supply in whole or in part under Section 5(5) EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#lief
 eranten-absicherungsstrategie
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:rollout-quote-2025@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20251231
DTEND;VALUE=DATE:20260101
SUMMARY:Due by: Smart meter rollout: 20 percent of the mandatory installati
 on cases (Law · adopted)
DESCRIPTION:Default metering point operators had to fit at least 20 percent
  of all metering points due for a smart metering system by the end of 2025
 . Since March 2026 the Bundesnetzagentur has opened supervisory proceeding
 s against 434 companies that missed the quota\; 150 of them had been close
 d by 21 September 2026.\n\nSource: https://www.gesetze-im-internet.de/mess
 bg/__45.html\n\nIf the deadline is missed: If the default metering point o
 perator misses the quota\, the Federal Network Agency can order measures u
 nder Sections 45(2) and 76 MsbG and enforce them with coercive fines of EU
 R 1\,000 to EUR 10 million (Section 76(4) MsbG\, Section 94 EnWG)\; such p
 roceedings have been running since March 2026. If the rollout of control u
 nits falls short by at least 25 percent and this contributes significantly
  to a possible threat to system security\, it can withdraw the default res
 ponsibility under Section 12(2g) EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#roll
 out-quote-2025
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:lfw24-vollpflicht@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20260101
DTEND;VALUE=DATE:20260102
SUMMARY:Applies from: 24-hour supplier switch: statutory duty since 2026 (L
 aw · in force)
DESCRIPTION:Since 1 January 2026 the technical supplier switch must be comp
 leted within 24 hours and be possible on every working day (Section 20a(2)
  sentence 4 EnWG)\; under Section 3 no. 31 EnWG energy includes gas and hy
 drogen. So far the Federal Network Agency has set the processes only for e
 lectricity (star-shaped switch via the MaLo ID\, BK6-22-024)\; it did not 
 change the gas switching processes in BK7-24-01-009.\n\nSource: https://ww
 w.gesetze-im-internet.de/enwg_2005/__20a.html\n\nIf the deadline is missed
 : The Federal Network Agency can order compliance with Section 20a(2) EnWG
  and ruling BK6-22-024 under Section 65 EnWG and enforce it with coercive 
 fines of up to EUR 10 million (Section 94 EnWG). Affected customers and ma
 rket partners can demand remedy and cessation under Section 32 EnWG\, and 
 damages where there is fault.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#lfw2
 4-vollpflicht
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:kritis-dach-in-kraft@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20260317
DTEND;VALUE=DATE:20260318
SUMMARY:Applies from: KRITIS umbrella act in force (Law · in force)
DESCRIPTION:Physical resilience of critical facilities: registration with B
 BK and BSI\, resilience plans. The original registration deadline was drop
 ped\; the ordinance will set the new one.\n\nSource: https://www.gesetze-i
 m-internet.de/kritisdachg/BJNR0420B0026.html\n\nIf the deadline is missed:
  Failing to register under Section 8(1) KRITISDachG\, or registering incor
 rectly or late\, is an administrative offence under Section 24 KRITISDachG
 : up to EUR 100\,000\, or up to EUR 1 million for defying a BBK order. The
  resilience duties themselves carry no fine\; for electricity\, gas and hy
 drogen the Federal Network Agency can order remedies under Section 5f(6) E
 nWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#krit
 is-dach-in-kraft
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:geli-gas-2@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20260401
DTEND;VALUE=DATE:20260402
SUMMARY:Applies from: GeLi Gas 2.0 applies (Regulatory ruling · in force)
DESCRIPTION:New supplier switch processes for gas\, UTILMD Gas 1.1.\n\nSour
 ce: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/
 BK7-24-0009/BK7-24-01-0009_Beschluss_Internet.html\n\nIf the deadline is m
 issed: The Federal Network Agency can have breaches of ruling BK7-19-001 (
 GeLi Gas 2.0) remedied under Section 65 EnWG and enforce this with coerciv
 e fines of up to EUR 10 million (Section 94 EnWG)\; breaching the enforcea
 ble order is an administrative offence under Section 95(1) no. 3(a) EnWG (
 up to EUR 100\,000).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#geli
 -gas-2
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:energy-sharing-42c@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20260601
DTEND;VALUE=DATE:20260602
SUMMARY:Applies from: Energy sharing under §42c EnWG (Law · in force)
DESCRIPTION:Since 1 June 2026 energy sharing has to be possible within a ne
 twork operator's balancing area. According to the Federal Network Agency's
  Notice No. 73\, the supplier based service model is enough and network op
 erators need to implement nothing further.\n\nSource: https://www.gesetze-
 im-internet.de/enwg_2005/__42c.html\n\nIf the deadline is missed: There is
  no specific fine. If a distribution system operator does not enable share
 d use under Section 42c(4) EnWG\, the regulator can order remedies under S
 ection 65 EnWG\; breaching the enforceable order is an administrative offe
 nce under Section 95(1) no. 3(a) EnWG (up to EUR 100\,000). According to t
 he Federal Network Agency's Notice No. 73\, the supplier-based service mod
 el already meets the duty.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#ener
 gy-sharing-42c
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:msv-gmsb@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20260701
DTEND;VALUE=DATE:20260702
SUMMARY:Applies from: Standard metering contracts for default metering oper
 ators (Regulatory ruling · in force)
DESCRIPTION:BK6-24-125: Since 1 July 2026 default metering point operators 
 conclude metering contracts only on the MSV-AN and MSV-LF templates and pu
 blish them for conclusion in text form. Electricity network operators and 
 all metering point operators conclude the framework contract (MSB-RV) in i
 ts amended version and adapt existing contracts.\n\nSource: https://www.bu
 ndesnetzagentur.de/DE/Beschlusskammern/BK06/BK6_83_Zug_Mess/846_messstelle
 nvertrag/Messstellenvertrag_node.html\n\nIf the deadline is missed: Ruling
  BK6-24-125 sets no penalty of its own. Under Section 76(1) MsbG the Feder
 al Network Agency can order conduct contrary to the ruling to stop and enf
 orce this with coercive fines of EUR 1\,000 to EUR 10 million (Section 76(
 4) MsbG\, Section 94 EnWG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#msv-
 gmsb
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ki-mig-in-kraft@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20260729
DTEND;VALUE=DATE:20260730
SUMMARY:Applies from: KI-MIG: the Bundesnetzagentur becomes market surveill
 ance authority (Law · in force)
DESCRIPTION:For AI systems in critical infrastructure and in HR\, the Bunde
 snetzagentur is the supervisor\, contact point and complaints body. Anyone
  using AI in grid operations or customer service now has a German counterp
 art for evidence and complaints.\n\nSource: https://www.bundesnetzagentur.
 de/SharedDocs/Pressemitteilungen/DE/2026/20260729_KI_VO.html\n\nIf the dea
 dline is missed: The KI-MIG sets companies no deadline of its own. Since 2
 9 July 2026 it has made the Federal Network Agency the market surveillance
  and fining authority for the AI Act (Sections 2\, 11 and 17 KI-MIG)\; fal
 se or incomplete information supplied to it can be fined under Art. 99(5) 
 AI Act up to EUR 7.5 million or 1% of worldwide turnover.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#ki-m
 ig-in-kraft
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ai-act-klassifizierung@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20260802
DTEND;VALUE=DATE:20260803
SUMMARY:Applies from: EU AI Act: transparency duties under Art. 50 (Law · 
 in force)
DESCRIPTION:Since 2 August 2026 the Art. 50 transparency duties apply: a ch
 atbot or voicebot must be recognisable as AI\, and generated content must 
 be marked in a machine-readable way. For systems placed on the market befo
 re that date\, the Art. 50(2) marking applies from 2 December 2026.\n\nSou
 rce: https://eur-lex.europa.eu/eli/reg/2024/1689/oj/deu\n\nIf the deadline
  is missed: Breaches of the transparency duties in Art. 50 of the AI Act c
 an be fined under Art. 99(4)(g) up to EUR 15 million or 3% of worldwide an
 nual turnover\, with the lower amount for SMEs and small mid-caps. The Fed
 eral Network Agency is generally the competent authority (Sections 2 and 1
 7 KI-MIG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#ai-a
 ct-klassifizierung
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:wacc-gas-konsultation@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20260914
DTEND;VALUE=DATE:20260915
SUMMARY:Comments by: Gas WACC: end of the consultation on the rate of retur
 n (Consultation)
DESCRIPTION:Gas distribution grid operators can comment on the draft decisi
 on on the flat-rate return on capital. The draft proposes a 3.76 percent r
 ate for the revenue caps from 2028\; it only becomes binding with the fina
 l decision.\n\nSource: https://www.bundesnetzagentur.de/SharedDocs/Pressem
 itteilungen/DE/2026/20260814_WACC.html\n\nIf the deadline is missed: Comme
 nting was voluntary. Operators that did not comment by 14 September 2026 d
 id not bring their objections into this procedure\; the rate only becomes 
 binding with the final decision.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#wacc
 -gas-konsultation
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:agnes-konsultation@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20260918
DTEND;VALUE=DATE:20260919
SUMMARY:Comments by: AgNes: consultation on the grid charge reform closes (
 Consultation)
DESCRIPTION:Comments on the new electricity grid charge system at the Grand
  Ruling Chamber\; framework ruling by end of 2026.\n\nSource: https://www.
 bundesnetzagentur.de/DE/Beschlusskammern/GBK/Ebene1_Rahmen/AgNes/start.htm
 l\n\nIf the deadline is missed: Comments were voluntary. Anyone who did no
 t submit by 18 September 2026 can no longer bring objections into this con
 sultation\; the ruling is due to be adopted in 2026.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#agne
 s-konsultation
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:szenariorahmen-2027-konsultation@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20260928
DTEND;VALUE=DATE:20260929
SUMMARY:Comments by: Grid development scenarios 2027: end of the consultati
 on (Consultation)
DESCRIPTION:Distribution grid operators and municipal utilities can comment
  on the electricity and gas/hydrogen drafts. The assumptions frame the gri
 d development plan.\n\nSource: https://www.bundesnetzagentur.de/SharedDocs
 /Pressemitteilungen/DE/2026/20260831_Szenariorahmen.html\n\nIf the deadlin
 e is missed: Commenting was voluntary. Anyone who submitted nothing by 28 
 September 2026 did not feed their assumptions into the 2027 scenario frame
 works\, which underpin the grid development plans.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#szen
 ariorahmen-2027-konsultation
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:mako-oktober-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261001
DTEND;VALUE=DATE:20261002
SUMMARY:Applies from: MaKo format release\, notice no. 56 (Regulatory rulin
 g · in force)
DESCRIPTION:25 AHB and MIG versions covering 13 EDIFACT message types\, AS4
  profile 1.2 and the AS4 transport rules 2.6 become binding. Test plan\, e
 xception handling and fallback scenarios need to be in place.\n\nSource: h
 ttps://www.bundesnetzagentur.de/DE/Beschlusskammern/BK06/BK6_83_Zug_Mess/8
 35_mitteilungen_datenformate/Mitteilung_56/Mitteilung_Nr_56.html\n\nIf the
  deadline is missed: The versions are binding under the market communicati
 on rulings. The Federal Network Agency can have breaches remedied under Se
 ction 65 EnWG\, or Section 76 MsbG for metering point operators\, and enfo
 rce this with coercive fines of up to EUR 10 million (Section 94 EnWG\, ap
 plied to metering point operators via Section 76(4) MsbG)\; breaching an e
 nforceable order under Section 65 EnWG is an administrative offence under 
 Section 95(1) no. 3(a) EnWG (up to EUR 100\,000). Whether this also covers
  orders under Section 76 MsbG is unsettled: Section 76(4) MsbG refers to P
 art 8 EnWG\, but Section 95(1) no. 3(a) EnWG only lists orders under the E
 nWG\, such as Section 65\, and none under the MsbG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#mako
 -oktober-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:mispel-festlegung@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261001
DTEND;VALUE=DATE:20261002
SUMMARY:Decision: MiSpeL: ruling on market integration of storage and charg
 ing points (Regulatory ruling · adopted)
DESCRIPTION:The Federal Network Agency adopted the ruling on 1 October 2026
  (ref. 618-25-02). A demarcation option and a flat-rate option set how vol
 umes at storage units and charging points in mixed use are split for EEG s
 upport and levy privileges.\n\nSource: https://www.bundesnetzagentur.de/DE
 /Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Aufsicht/MiSpeL/st
 art.html\n\nIf the deadline is missed: Market premium and levy privileges 
 for storage units and charging points in mixed use are only available if v
 olumes are determined and proven under Annex 1 (demarcation option) or Ann
 ex 2 (flat-rate option) of the ruling (operative points 1 to 4). Until 30 
 September 2027 this requires the consent of the grid operator and the mete
 ring operator (point 9(a)).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#misp
 el-festlegung
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:wim-gas-2@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261001
DTEND;VALUE=DATE:20261002
SUMMARY:Applies from: WiM Gas 2.0 applies (Regulatory ruling · in force)
DESCRIPTION:Digitalised metering switch processes for gas\, new message for
 mats.\n\nSource: https://www.bdew.de/service/wechselpbdewvkugeodefnb-gas-a
 nwendungshilfe-wechselprozesse-im-messwesen-in-der-sparte-gas-wim-20-ab-01
 102026/\n\nIf the deadline is missed: WiM Gas 2.0 implements ruling BK7-19
 -001. The Federal Network Agency can have breaches remedied under Section 
 76 MsbG for metering point operators and Section 65 EnWG for network opera
 tors\, and enforce this with coercive fines of up to EUR 10 million (Secti
 on 94 EnWG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#wim-
 gas-2
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:msb-rahmenvertrag-gas-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261001
DTEND;VALUE=DATE:20261002
SUMMARY:Applies from: Gas: new metering point operator framework contract (
 Regulatory ruling · in force)
DESCRIPTION:Since 1 October 2026 the new gas metering point operator framew
 ork contract applies\; ruling BK7-17-026 was revoked on the same day. Gas 
 network operators and all metering point operators conclude the contract i
 n its current version and adapt existing contracts\, and gas network opera
 tors publish it (BK7-24-01-009\, operative items 13 to 15).\n\nSource: htt
 ps://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK7-GZ/2024/BK7-24-
 0009/Anlagen/BK7-24-01-0009_Beschluss_Download_BF.pdf?__blob=publicationFi
 le&v=4\n\nIf the deadline is missed: Ruling BK7-24-01-009 sets no penalty 
 of its own. Failing to conclude the framework contract in its current vers
 ion\, or as a gas network operator failing to publish it (operative item 1
 5)\, breaches a ruling\; the Federal Network Agency can enforce this under
  Section 76(1) and (4) MsbG with coercive fines of EUR 1\,000 to EUR 10 mi
 llion.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#msb-
 rahmenvertrag-gas-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nutzen-statt-abregeln-zielmodell-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261001
DTEND;VALUE=DATE:20261002
SUMMARY:Applies from: Use instead of curtail: daily tenders for curtailment
  volumes (Section 13k EnWG) (Law · in force)
DESCRIPTION:Since 1 October 2026\, TSOs with control area responsibility al
 locate the electricity volumes that would otherwise be curtailed due to tr
 ansmission congestion through daily competitive tenders to registered addi
 tional loads in relief regions. The flat-rate allocation of the trial phas
 e has ended. Amprion and TransnetBW do not designate relief regions at the
  start.\n\nSource: https://www.netztransparenz.de/cdn/files/a7fc5e51-fc59-
 46ca-6f79-08ded04f7ece/2026-04-01%20u%CC%88nb%20umsetzungskonzept%202.0%20
 %C2%A7%2013k%20enwg%20%28fu%CC%88r%20wettbewerbliche%20ausschreibungen%20a
 b%20dem%2001.10.2026%29.pdf\n\nIf the deadline is missed: The Act sets no 
 specific administrative fine for the Section 13k EnWG obligation. The Fede
 ral Network Agency can enforce compliance under Section 65 EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#nutz
 en-statt-abregeln-zielmodell-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ee-netzkostenwaelzung-meldung-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261014
DTEND;VALUE=DATE:20261015
SUMMARY:Due by: Renewables grid cost pass-through: binding notification to 
 the TSO (Regulatory ruling · adopted)
DESCRIPTION:Distribution system operators with eligible extra costs from re
 newables integration submit their binding pass-through notification for 20
 27 to their transmission system operator. The deadline is the last working
  day before 15 October.\n\nSource: https://www.bundesnetzagentur.de/DE/Bes
 chlusskammern/BK08/BK8_04_InfoRundschr/41_Rundschr/Downloads/Fristenkalend
 er_Netzbetreiber_Netzentgelte_Elektrizitaet_2026.pdf\n\nIf the deadline is
  missed: Under operative item 5(b) of ruling BK8-24-001-A\, a late notific
 ation means the transmission system operator no longer reimburses the pass
 -through amount for 2027\, and the figures can no longer be corrected. Thi
 s also applies if only the notification to the regulator by 1 October was 
 on time.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#ee-n
 etzkostenwaelzung-meldung-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:netzentgelte-veroeffentlichung-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261015
DTEND;VALUE=DATE:20261016
SUMMARY:Due by: 2027 network charges: publication by 15 October (Law · ado
 pted)
DESCRIPTION:Electricity and gas distribution grid operators publish their 2
 027 network charges online. If the charges are not yet calculated on the c
 ut-off date\, operators publish the expected level derived from the revenu
 e cap.\n\nSource: https://www.gesetze-im-internet.de/enwg_2005/__20.html\n
 \nIf the deadline is missed: Section 20 EnWG sets no penalty of its own fo
 r late publication. The regulator can order publication under Section 65(2
 ) EnWG and enforce it with coercive fines under Section 94 EnWG\; breachin
 g the enforceable order is an administrative offence under Section 95(1) n
 o. 3(a) EnWG (up to EUR 100\,000).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#netz
 entgelte-veroeffentlichung-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bk6-afrr-kapazitaet-cz-konsultation@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261016
DTEND;VALUE=DATE:20261017
SUMMARY:Comments by: aFRR at the Czech border: consultation on the capacity
  method closes (Consultation)
DESCRIPTION:Ruling Chamber 6 is consulting on the proposal by the German\, 
 Austrian and Czech TSOs to amend the probabilistic method for cross-zonal 
 capacity available for exchanging aFRR. Comments are due by 16 October 202
 6.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK
 6-GZ/2026/BK6-26-473/BK6-26-473_verfahrenseroeffnung.html\n\nIf the deadli
 ne is missed: Commenting is voluntary. Parties that do not comment by 16 O
 ctober 2026 do not bring their objections into this procedure\; only the m
 ethod approved by the Federal Network Agency becomes binding.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk6-
 afrr-kapazitaet-cz-konsultation
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bk8-redispatch-ausgleich-konsultation@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261021
DTEND;VALUE=DATE:20261022
SUMMARY:Comments by: Redispatch without balancing: consultation on cost rei
 mbursement closes (Consultation)
DESCRIPTION:Ruling Chamber 8 is consulting on how DSOs reimburse costs when
  redispatch measures are not specifically balanced. Comments are due by 21
  October 2026\, with the final ruling targeted by year end.\n\nSource: htt
 ps://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2026/2026_3-
 Steller/BK8-26-001/BK8-26-0001-A_Konsultation_Festlegungsentwurf.html\n\nI
 f the deadline is missed: Comments are voluntary. Anyone who submits nothi
 ng by 21 October 2026 can no longer bring objections into this consultatio
 n\; Ruling Chamber 8 then publishes the final ruling.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-
 redispatch-ausgleich-konsultation
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:enfg-umlagen-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261025
DTEND;VALUE=DATE:20261026
SUMMARY:Due by: 2027 levies: publication by the transmission system operato
 rs (Law · adopted)
DESCRIPTION:The transmission system operators publish the 2027 CHP levy and
  offshore grid levy by 25 October. Suppliers and grid operators carry the 
 values into price sheets and grid fee billing.\n\nSource: https://www.gese
 tze-im-internet.de/enfg/__11.html\n\nIf the deadline is missed: The Federa
 l Network Agency monitors publication under Section 62(1) no. 1(a) EnFG an
 d can order it using its EnWG powers. Breaching an enforceable order is an
  administrative offence under Section 63(1) no. 2 EnFG\, with fines of up 
 to EUR 200\,000.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#enfg
 -umlagen-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bk8-effizienzvergleich-datenerhebung-konsultation@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261026
DTEND;VALUE=DATE:20261027
SUMMARY:Comments by: Electricity efficiency benchmarking: data collection c
 onsultation closes (Consultation)
DESCRIPTION:Ruling Chamber 8 is consulting on which data electricity DSOs m
 ust supply for the efficiency benchmarking of the fifth regulatory period.
  Comments are due by 26 October 2026\; the data collection follows afterwa
 rds.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/
 BK8-GZ/2026/2026_3-Steller/BK8-26-004/BK8-26-006x13/BK8-26-004x13_Einleitu
 ng_Konsultation.html\n\nIf the deadline is missed: Commenting is voluntary
 . Operators that do not comment by 26 October 2026 do not bring their obje
 ctions into this procedure\; which data must be supplied only becomes bind
 ing with the final decision.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#bk8-
 effizienzvergleich-datenerhebung-konsultation
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:netzausbauplan-14d-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261031
DTEND;VALUE=DATE:20261101
SUMMARY:Due by: Grid expansion plan under section 14d EnWG: filing due 31 O
 ctober 2026 (Law · adopted)
DESCRIPTION:Distribution system operators with 100\,000 or more customers s
 ubmit their grid expansion plan to the Federal Network Agency by 31 Octobe
 r 2026\, the first filing in the statutory two-year cycle following the 20
 24 plans. Smaller operators are covered only if they curtailed more than 3
  percent of onshore wind or solar output in each of the two previous years
 .\n\nSource: https://www.gesetze-im-internet.de/enwg_2005/__14d.html\n\nIf
  the deadline is missed: Section 14d EnWG sets no penalty of its own. The 
 regulator can order the filing under Section 65(2) EnWG and enforce it wit
 h coercive fines under Section 94 EnWG\; breaching the enforceable order i
 s an administrative offence under Section 95(1) no. 3(a) EnWG (up to EUR 1
 00\,000).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#netz
 ausbauplan-14d-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:engpasserloese-verwendung-plan-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261031
DTEND;VALUE=DATE:20261101
SUMMARY:Due by: Congestion income 2027: report the planned use to the Feder
 al Network Agency (Regulatory ruling · adopted)
DESCRIPTION:Transmission system operators tell the Federal Network Agency b
 y 31 October how they plan to use the 2027 congestion income from allocati
 ng cross-zonal capacity. The basis is Article 4 of the ACER methodology on
  the use of congestion income under Article 19 of Regulation (EU) 2019/943
 .\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK08/BK8
 _04_InfoRundschr/41_Rundschr/Downloads/Fristenkalender_Netzbetreiber_Netze
 ntgelte_Elektrizitaet_2026.pdf\n\nIf the deadline is missed: The ACER meth
 odology sets no sanction of its own. The Federal Network Agency decides on
  the use by 31 December and can require changes\; it can enforce the repor
 ting duty under Section 56(1) sentence 2 and Section 94 EnWG with coercive
  fines of EUR 1\,000 to EUR 10 million.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#engp
 asserloese-verwendung-plan-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:msbg-37-veroeffentlichung-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261031
DTEND;VALUE=DATE:20261101
SUMMARY:Due by: Default metering point operators: publish services and pric
 e sheets by 31 October (Law · adopted)
DESCRIPTION:Every year by 31 October\, default metering point operators pub
 lish the scope of their installation duties under Section 29 MsbG\, their 
 standard and possible additional services\, and price sheets with expected
  annual prices for at least three years (Section 37(1) MsbG). Prices for a
 dditional services must be reviewed at least every two years.\n\nSource: h
 ttps://www.gesetze-im-internet.de/messbg/__37.html\n\nIf the deadline is m
 issed: The MsbG sets no penalty of its own for a missing publication. The 
 Federal Network Agency can order it under Section 76(2) MsbG and enforce t
 he order with coercive fines under Section 94 EnWG (Section 76(4) MsbG)\; 
 whether breaching such an order can also be fined as an administrative off
 ence under Section 95 EnWG is unsettled\, because Section 95(1) no. 3(a) E
 nWG only lists orders under the EnWG\, such as Section 65\, and none under
  the MsbG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg
 -37-veroeffentlichung-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:eeg-ausschreibung-wind-2026-11@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261102
DTEND;VALUE=DATE:20261103
SUMMARY:Due by: EEG onshore wind tender: bid deadline 1 November 2026 (Law 
 · adopted)
DESCRIPTION:Bids for onshore wind turbines must reach the Federal Network A
 gency by the bid deadline\; as 1 November 2026 is a Sunday\, bids are due 
 by midnight on Monday\, 2 November 2026. According to the agency\, the vol
 ume is about 2\,495 MW and the 2026 ceiling price is 7.25 cents per kilowa
 tt hour.\n\nSource: https://www.bundesnetzagentur.de/DE/Fachthemen/Elektri
 zitaetundGas/Ausschreibungen/Wind_Onshore/GT01112026/start.html\n\nIf the 
 deadline is missed: Bids must reach the Federal Network Agency by the bid 
 date (Section 30a(2) EEG)\; only bids received in time are opened (Section
  32(1) sentence 2 EEG)\, so a late bid gets no award in this round. A bid 
 is also excluded if the fee or security has not been paid in full by then 
 (Section 33(1) no. 3 EEG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-
 ausschreibung-wind-2026-11
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:grundversorgung-preisaenderung-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261120
DTEND;VALUE=DATE:20261121
SUMMARY:Due by: Price change on 1 January 2027: notice deadline in default 
 supply (Law · adopted)
DESCRIPTION:Default suppliers changing their general prices on 1 January 20
 27 must publish the change at least six weeks in advance\, notify customer
 s by letter and post it online. For household customers on special contrac
 ts\, Section 41(5) EnWG sets a one month notice period.\n\nSource: https:/
 /www.gesetze-im-internet.de/stromgvv/__5.html\n\nIf the deadline is missed
 : Under Section 5(2) StromGVV and GasGVV a change to general prices only t
 akes effect after public notice at least six weeks in advance\; with later
  notice the new price does not apply from 1 January 2027. For household cu
 stomers on special contracts Section 41(5) EnWG requires one month's notic
 e but states no express consequence. The Federal Network Agency takes up b
 reaches of Section 41(5) EnWG under Section 65 EnWG: on 29 August 2025 it 
 ordered one electricity supplier to reverse price changes (case 4.07.01/8#
 1) and then imposed coercive fines of EUR 100\,000 (31 March 2026) and EUR
  175\,000 (31 July 2026)\; the decisions are not yet final.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#grun
 dversorgung-preisaenderung-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:redispatch-abrechnungsvariante-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261130
DTEND;VALUE=DATE:20261201
SUMMARY:Due by: Redispatch 2.0: choice of settlement method for 2027 (Regul
 atory ruling · adopted)
DESCRIPTION:Under BK6-23-241 (BilAReM section 3.2.1)\, operators of wind an
 d solar plants from 100 kW set the settlement method for each technical re
 source by 30 November for the following year. Without a decision the simpl
 ified peak settlement applies\; the flat-rate settlement ends for existing
  resources at the end of 2028 unless feed-in is not metered quarter-hourly
 .\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6
 -GZ/2023/BK6-23-241/BK6-23-241_beschluss.html\n\nIf the deadline is missed
 : Without an assignment decision by 30 November\, the simplified peak sett
 lement applies to resources with fluctuating generation (BilAReM chapter 3
 .2.1)\; resources already on flat-rate settlement stay there until 31 Dece
 mber 2028 at the latest\, and beyond that without quarter-hourly metering.
  The assignment holds for the whole following year.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#redi
 spatch-abrechnungsvariante-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:steuerbarkeit-gesamtbericht-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261130
DTEND;VALUE=DATE:20261201
SUMMARY:Due by: Controllability: TSOs' overall report under Section 12(2c) 
 EnWG (Law · adopted)
DESCRIPTION:The transmission system operators submit the overall report on 
 network operators' controllability tests and on the equipment status repor
 ted by default metering operators to the Federal Network Agency and the Fe
 deral Ministry for Economic Affairs by 30 November. Under the TSOs' guidel
 ines the checked results must reach them by 31 October\; tests and reports
  run until 30 September.\n\nSource: https://www.gesetze-im-internet.de/enw
 g_2005/__12.html\n\nIf the deadline is missed: If a default metering opera
 tor fails its check or contribution duty and it therefore cannot be establ
 ished whether the deployment obligations are missed by at least 25 percent
  in a way that could significantly endanger system security in a control a
 rea\, the Federal Network Agency can withdraw its default responsibility u
 nder Section 12(2g) no. 2 EnWG. It can order network operators to comply u
 nder Section 65 EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#steu
 erbarkeit-gesamtbericht-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:eeg-ausschreibung-solar-2026-12@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261201
DTEND;VALUE=DATE:20261202
SUMMARY:Due by: EEG first-segment solar tender: bid deadline 1 December 202
 6 (Law · adopted)
DESCRIPTION:Bids for first-segment solar plants (ground-mounted and on stru
 ctures that are neither buildings nor noise barriers) must reach the Feder
 al Network Agency by the bid date. According to the agency\, the volume is
  about 2\,226 MW and the ceiling price 5.53 cents per kilowatt hour.\n\nSo
 urce: https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/A
 usschreibungen/Solaranlagen1/01122026/start.html\n\nIf the deadline is mis
 sed: Bids must reach the Federal Network Agency by the bid date (Section 3
 0a(2) EEG)\; only bids received in time are opened (Section 32(1) sentence
  2 EEG)\, so a late bid gets no award in this round. A bid is also exclude
 d if the fee or security has not been paid in full by then (Section 33(1) 
 no. 3 EEG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-
 ausschreibung-solar-2026-12
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ai-act-kennzeichnung-bestand@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261202
DTEND;VALUE=DATE:20261203
SUMMARY:Applies from: EU AI Act: labelling duty extends to AI already in us
 e (Law · adopted)
DESCRIPTION:The four-month transition period ends. Generative AI systems pl
 aced on the market before 2 August 2026 must mark their output in machine-
 readable form.\n\nSource: https://eur-lex.europa.eu/eli/reg/2026/1744/oj/d
 eu\n\nIf the deadline is missed: If a provider of generative AI placed on 
 the market before 2 August 2026 does not mark its output in machine-readab
 le form by 2 December 2026 (Art. 50(2) and Art. 111(4) AI Act)\, the breac
 h can be fined under Art. 99(4)(g) up to EUR 15 million or 3% of worldwide
  turnover\, with the lower amount for SMEs and small mid-caps (Art. 99(6) 
 and (6a)). The same range applies to deployers for disclosing deepfakes (A
 rt. 50(4)).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#ai-a
 ct-kennzeichnung-bestand
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:stromvkg-langzeitkapazitaeten-2026-12@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261229
DTEND;VALUE=DATE:20261230
SUMMARY:Due by: Power plant strategy (StromVKG): second auction for long-du
 ration capacity (Law · adopted)
DESCRIPTION:On 29 December 2026 the Federal Network Agency auctions another
  4.5 gigawatts of long-duration capacity. Eligible are generation plants a
 ble to feed in 80 percent of their capacity for at least ten consecutive h
 ours\, with a 15-year commitment.\n\nSource: https://www.gesetze-im-intern
 et.de/stromvkg/BJNR0D2AB0026.html\n\nIf the deadline is missed: A bid must
  reach the Federal Network Agency by the bid date\, with no reinstatement 
 (Section 37(1) StromVKG). Bids without the fee or security paid by then ar
 e excluded under Section 49(1) no. 1 StromVKG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#stro
 mvkg-langzeitkapazitaeten-2026-12
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:agnes-rahmen@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Decision: AgNes: framework ruling on electricity grid charges (Regu
 latory ruling · expected)
DESCRIPTION:Under the draft of 6 August 2026\, low-voltage connections up t
 o 100\,000 kWh keep a standing charge and an energy charge\; those generat
 ing behind the connection pay a prosumer surcharge of 70 to 90 percent of 
 the standing charge\, plug-in solar devices excepted. Above that\, and abo
 ve low voltage\, a capacity price applies\, and generation plants above 30
  kW pay a feed-in charge\, existing plants and plants with an investment d
 ecision before notification only 20 years after commissioning. The draft p
 rovides dynamic grid charges only for storage (2030 at the earliest\, 2033
  at the latest) and generation (2032 to 2035)\, not for final customers fo
 r now. Follow-up rulings in 2027\, effect from 2029.\n\nSource: https://ww
 w.bundesnetzagentur.de/SharedDocs/Pressemitteilungen/DE/2026/20260806_Agne
 s.html\n\nIf the deadline is missed: The date is the Federal Network Agenc
 y's. Its notification\, set for 1 January 2027 in the draft (operative poi
 nt 20)\, starts other cut-offs\, such as grandfathering for storage and ge
 neration plants with an investment decision before notification\, to be pr
 oven to the network operator by 31 March 2027.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#agne
 s-rahmen
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:heizkostenv-fernablesung@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Due by: Heating costs ordinance: retrofit remote reading (Law · ad
 opted)
DESCRIPTION:Building owners retrofit or replace heat and hot water meters a
 nd heat cost allocators installed up to 1 December 2021 that cannot be rea
 d remotely by the end of 2026 (Section 5(3) HeizkostenV). The same duty ap
 plies to a heat supplier that bills occupants directly by their share of t
 otal consumption (Section 1(3) HeizkostenV).\n\nSource: https://www.gesetz
 e-im-internet.de/heizkostenv/__5.html\n\nIf the deadline is missed: Where 
 remotely readable equipment is missing contrary to Section 5(3) Heizkosten
 V\, occupants may cut their share of the costs by 3 percent under Section 
 12(1) sentence 2 HeizkostenV. Sections 4 to 11 HeizkostenV are consumer pr
 otection laws under Section 2(2) no. 40 UKlaG\, so associations can seek i
 njunctions against breaches.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#heiz
 kostenv-fernablesung
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:msbg-steuerung-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Target: §14a control: target for working control (dropped)
DESCRIPTION:Under the four-stage approach of Technical Study 2.0\, working 
 control with core processes for first use cases is due by the end of 2026.
  This is a target\, not a statutory MsbG deadline.\n\nSource: https://www.
 utility-partners.de/msbg-novelle-wird-mit-kaum-erreichbaren-zielen-fuer-20
 26-beschlossen/
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg
 -steuerung-2026
TRANSP:TRANSPARENT
STATUS:CANCELLED
END:VEVENT
BEGIN:VEVENT
UID:rollout-quote-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Due by: Smart meter rollout: 90 percent of the installation cases s
 ince February 2025 (Law · adopted)
DESCRIPTION:By the end of 2026 default metering point operators must have c
 ompleted at least 90 percent of the metering points that have fallen due s
 ince 25 February 2025. According to its press release\, the Bundesnetzagen
 tur collects progress twice a year\, and it has been running supervisory p
 roceedings against laggards since March 2026.\n\nSource: https://www.geset
 ze-im-internet.de/messbg/__45.html\n\nIf the deadline is missed: If the de
 fault metering point operator misses the quota\, the Federal Network Agenc
 y can order measures under Sections 45(2) and 76 MsbG and enforce them wit
 h coercive fines of EUR 1\,000 to EUR 10 million (Section 76(4) MsbG\, Sec
 tion 94 EnWG). If the rollout of control units falls short by at least 25 
 percent and this contributes significantly to a possible threat to system 
 security\, it can withdraw the default responsibility under Section 12(2g)
  EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#roll
 out-quote-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:wpg-32-fahrplan@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Due by: WPG §32: decarbonisation roadmap for heat networks (Law ·
  adopted)
DESCRIPTION:Operators of heat networks not fed entirely by renewable heat o
 r unavoidable waste heat submit the roadmap. Targets under Section 29 WPG:
  at least 30 percent renewable heat or unavoidable waste heat from 2030\, 
 80 percent from 2040.\n\nSource: https://www.gesetze-im-internet.de/wpg/__
 32.html\n\nIf the deadline is missed: The Heat Planning Act sets neither a
  fine nor a specific power to issue orders for a missing or late roadmap. 
 Compliance is monitored by the authority each federal state designates und
 er Section 33(5) WPG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#wpg-
 32-fahrplan
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:rollout-quote-erzeuger-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Due by: Smart meter rollout: 90 percent of new generation capacity 
 from plants above 7 and up to 100 kilowatts (Law · adopted)
DESCRIPTION:By the end of 2026 default metering point operators must have e
 quipped at least 90 percent of the capacity of plants above 7 and up to 10
 0 kilowatts that came online between 25 February 2025 and 30 September 202
 6. The yardstick is installed capacity\, not the number of metering points
 .\n\nSource: https://www.gesetze-im-internet.de/messbg/__45.html\n\nIf the
  deadline is missed: If the default metering point operator misses the quo
 ta\, the Federal Network Agency can order measures under Sections 45(2) an
 d 76 MsbG and enforce them with coercive fines of EUR 1\,000 to EUR 10 mil
 lion (Section 76(4) MsbG\, Section 94 EnWG). If the equipping of installat
 ions with control units falls short by at least 25 percent and this contri
 butes significantly to a possible threat to system security\, it can withd
 raw the default responsibility under Section 12(2g) EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#roll
 out-quote-erzeuger-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:wacc-gas-festlegung@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Decision: Gas WACC: the rate of return decision is issued (Regulato
 ry ruling · expected)
DESCRIPTION:The Bundesnetzagentur intends to set the flat-rate return on ca
 pital for gas grid operators by the end of 2026. Gas distribution operator
 s then calculate the revenue caps of the fifth regulatory period from 2028
  with the adopted rate.\n\nSource: https://www.bundesnetzagentur.de/Shared
 Docs/Pressemitteilungen/DE/2026/20260814_WACC.html\n\nIf the deadline is m
 issed: Issuing the decision by the end of 2026 is the Federal Network Agen
 cy's own target. The ruling fixes the rate for gas revenue caps from 2028\
 ; it can only be challenged by an appeal within one month of service (Sect
 ion 78(1) EnWG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#wacc
 -gas-festlegung
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:kwkg-inbetriebnahme-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Due by: CHP Act: cut-off for commercial operation or permit of CHP 
 plants\, heat networks and heat storage (Law · adopted)
DESCRIPTION:CHP Act support requires that CHP plants start commercial opera
 tion by 31 December 2026\, or hold a federal immission control permit or b
 inding order by then and start commercial operation within four years. Sup
 port for heat networks and heat storage is also tied to 31 December 2026 (
 commissioning or all permits under state law in place).\n\nSource: https:/
 /www.gesetze-im-internet.de/kwkg_2016/__6.html\n\nIf the deadline is misse
 d: The CHP premium under Section 6(1) sentence 1 no. 1 KWKG is only paid i
 f the plant enters commercial operation by 31 December 2026\, or holds an 
 immission control permit or binding order by then and starts commercial op
 eration within four years\; awards from CHP tenders are exempt. Similar cu
 t-offs apply to new heat networks and heat storage (Section 18(1) no. 1 an
 d Section 22(1) no. 1 KWKG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#kwkg
 -inbetriebnahme-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:regulierungskonto-antrag-2025@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Due by: Regulatory account: application for 2025 (Law · adopted)
DESCRIPTION:Electricity and gas network operators apply to the competent re
 gulator for approval of their 2025 regulatory account balance by 31 Decemb
 er 2026.\n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/B
 K08/BK8_04_InfoRundschr/41_Rundschr/Downloads/Fristenkalender_Netzbetreibe
 r_Netzentgelte_Elektrizitaet_2026.pdf\n\nIf the deadline is missed: The AR
 egV sets no penalty of its own\, but the application is mandatory under Se
 ction 4(4) sentence 3 ARegV\; the regulator can order it under Section 65(
 2) EnWG and enforce it with coercive fines. Under Section 5(3) sentence 3 
 ARegV the balance is only spread from the second year after the applicatio
 n.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#regu
 lierungskonto-antrag-2025
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ffvav-fernablesung-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Due by: FFVAV: make district heating meters remotely readable by th
 e end of 2026 (Law · adopted)
DESCRIPTION:District heating and cooling suppliers retrofit meters installe
 d before 5 October 2021 that cannot be read remotely by 31 December 2026\,
  or replace them with remotely readable ones (Section 3(3) FFVAV). Meters 
 installed after 5 October 2021 must already be remotely readable.\n\nSourc
 e: https://www.gesetze-im-internet.de/ffvav/__3.html\n\nIf the deadline is
  missed: The FFVAV contains neither a fine provision nor a regulator's com
 petence\; the duty applies within the supply contract with the customer (S
 ection 1(1) FFVAV). Sections 3 to 5 FFVAV are consumer protection laws und
 er Section 2(2) no. 40 UKlaG\, so associations can bring injunction and re
 moval claims against heat suppliers.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#ffva
 v-fernablesung-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:iso-15118-20@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:Applies from: AFIR: ISO 15118-20 for new charging points (Law · ad
 opted)
DESCRIPTION:From 2027\, newly built or renovated publicly accessible chargi
 ng points and private charging points in modes 3 and 4 must support at lea
 st ISO 15118-20. Bidirectional charging and Plug and Charge stay optional\
 ; anyone offering Plug and Charge needs both ISO 15118-2 and ISO 15118-20.
 \n\nSource: https://eur-lex.europa.eu/legal-content/DE/TXT/HTML/?uri=CELEX
 :32025R0656\n\nIf the deadline is missed: For publicly accessible charging
  points\, the Federal Network Agency can require retrofitting and prohibit
  operation under Section 5(2) and (3) of the Charging Station Ordinance if
  Annex II to AFIR (Regulation (EU) 2023/1804) is not met. ISO 15118-20 sit
 s in that annex since Delegated Regulation (EU) 2025/656.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#iso-
 15118-20
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:netzpaket-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:Applies from: Grid package: system-serving connection capacity inst
 ead of maximum output (Law · not yet adopted)
DESCRIPTION:The right to a grid connection no longer covers the maximum gen
 eration output: for plants connected from 1 January 2027\, the draft caps 
 feed-in from new first-segment solar plants at 70 percent of installed cap
 acity and from onshore wind at 280 watts per square metre of rotor area (S
 ection 8 of the draft EEG). By then the transmission system operators subm
 it joint procedure rules for transmission grid connections to the Federal 
 Network Agency\, which may include prioritisation principles\; distributio
 n system operators may adopt them. Grid operators show available capacity 
 on grid maps every month\; the electronic enquiry procedure from 135 kilow
 atts only arrives in 2028 under the draft.\n\nSource: https://dserver.bund
 estag.de/btd/21/078/2107866.pdf\n\nIf the deadline is missed: Under the go
 vernment bill (Bundestag printed paper 21/7866) the new duties carry no fi
 ne of their own. Duties such as the transmission system operators' submiss
 ion of procedure rules or the monthly capacity map (Sections 17a and 17c o
 f the draft EnWG) could be enforced by the regulator under Section 65 EnWG
 .
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#netz
 paket-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:eeg-2027-kleinanlagen@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:Applies from: EEG 2027 (government draft): transition payment inste
 ad of a feed-in tariff for new small systems (Law · not yet adopted)
DESCRIPTION:Under the government draft\, subject to the Bundestag's decisio
 n and EU state aid approval: new systems no longer receive a feed-in tarif
 f\, and the market premium only starts at 25 kW. Instead the grid operator
  pays a temporary transition payment for at most 36 months\, for systems b
 elow 50 kW commissioned in 2027\, below 25 kW commissioned in 2028 and bel
 ow 7 kW commissioned in 2029 or 2030. Systems below 25 kW in other direct 
 marketing receive a 1.5 ct/kWh bonus for up to 48 months. Rooftop systems 
 below 100 kW cap feed-in at 50 percent permanently. Systems commissioned b
 y 31 December 2026 stay under the old rules. In the MsbG\, mandatory smart
  meters and control devices for generation start above 2 kW\, and the inst
 allation quotas in Section 45 count metering points instead of kilowatts. 
 The Bundesrat wants to drop the 2 kW threshold\; the federal government re
 jects that.\n\nSource: https://dserver.bundestag.de/btd/21/078/2107867.pdf
 \n\nIf the deadline is missed: Under the draft (Bundestag printed paper 21
 /7867)\, payment obligations for breaches under Section 52 EEG fall on pla
 nt operators\; it sets no separate sanction for network operators\, meteri
 ng point operators or suppliers. According to the explanatory memorandum\,
  network operators need software to administer the temporary transition pa
 yment.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-
 2027-kleinanlagen
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:tr-03109-6-v2@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:Applies from: BSI TR-03109-6 v2.0 for gateway administrators (Regul
 atory ruling · adopted)
DESCRIPTION:Gateway administrators have their GWA system assessed against v
 ersion 2.0 at the next certification or recertification from 1 January 202
 7. Version 2.0 covers remote workplaces\, cloud service providers\, zero t
 rust\, time servers and penetration tests\, among other things. Version 1.
 0 stays valid until 31 December 2028.\n\nSource: https://www.bsi.bund.de/D
 E/Themen/Unternehmen-und-Organisationen/Standards-und-Zertifizierung/Smart
 -metering/Administration-und-Betrieb/TechnRichtlinie/TR_03109-6.html\n\nIf
  the deadline is missed: Conformity with TR-03109-6 is proven by certifica
 tion. If the default metering point operator lacks the certificates requir
 ed under Section 25 MsbG\, the fallback metering operator takes over in em
 ergency operation (Section 11(2) no. 2 MsbG) and\, six months later\, the 
 default responsibility (Section 11(4) MsbG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#tr-0
 3109-6-v2
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:smgw-tr-03109-1-v2-muss-plus-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:Applies from: BSI TR-03109-1 v2.0: gateway certificates only with M
 USS+ (Regulatory ruling · adopted)
DESCRIPTION:Anyone certifying a smart meter gateway against version 2.0 of 
 the protection profile and TR-03109-1 must also prove the MUSS+ requiremen
 ts from 1 January 2027. According to the BSI these include a WAN API\, reg
 istering power metering over the local metrological network and factory re
 set by the service technician\, plus TAF 8 in its new form and TAF 15. By 
 mid-October 2026 no gateway had been certified under version 2.0.\n\nSourc
 e: https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/Schu
 tzprofile/Uebergangsregelung-PP-0073_und_TR-03109-1.pdf?__blob=publication
 File\n\nIf the deadline is missed: Without MUSS+ proof there is no version
  2.0 certificate from that date. Without a valid certificate\, a smart met
 er gateway may not be used as part of a smart metering system under Sectio
 n 24(4) MsbG\, and under Section 25(1) MsbG the gateway administrator may 
 only use gateways with valid certificates.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#smgw
 -tr-03109-1-v2-muss-plus-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:auffang-msb-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:Due by: Fallback metering operator: publication for 2027 (Law · ad
 opted)
DESCRIPTION:At the start of the calendar year the Bundesnetzagentur publish
 es the name\, address and website of the fallback metering operator respon
 sible for each federal state\, together with the operators that declared r
 eadiness. The basis is the monitoring data under section 35 EnWG.\n\nSourc
 e: https://www.gesetze-im-internet.de/messbg/__11.html\n\nIf the deadline 
 is missed: Publication under Section 11(3) sentence 2 MsbG is a duty of th
 e Federal Network Agency. It shows who takes over emergency operation if a
  default metering point operator drops out\, loses its certificates or lac
 ks approval (Section 11(2) MsbG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#auff
 ang-msb-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:afir-adhoc-zahlung-bestand-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:Applies from: AFIR: card payment at existing fast chargers from 50 
 kW (Law · adopted)
DESCRIPTION:From 1 January 2027\, publicly accessible charging points from 
 50 kW along the TEN-T road network or at safe and secure truck parking are
 as must accept ad hoc charging via a card reader or contactless card devic
 e\, including points built before 13 April 2024.\n\nSource: https://eur-le
 x.europa.eu/eli/reg/2023/1804/oj\n\nIf the deadline is missed: If a chargi
 ng point does not meet Article 5(1) AFIR (Regulation (EU) 2023/1804)\, the
  Federal Network Agency can require retrofitting under Section 5(2) of the
  Charging Station Ordinance and prohibit operation under Section 5(3).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#afir
 -adhoc-zahlung-bestand-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:eeg-2027-refinanzierungsbeitrag@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:Applies from: EEG 2027 (government draft): refinancing contribution
  for new plants from 100 kW (Law · not yet adopted)
DESCRIPTION:Under the government draft\, subject to the Bundestag's decisio
 n and EU state aid approval: operators of new plants from 100 kW with an a
 ward or a notification under Section 20(2) EEG pay the grid operator a ref
 inancing contribution per kilowatt hour fed in for years in which the annu
 al market value exceeds the applicable value. The grid operator collects i
 t with monthly instalments due on the 15th of the following month\, and it
  falls due four weeks after the final statement reaches the plant operator
 .\n\nSource: https://dserver.bundestag.de/btd/21/078/2107867.pdf\n\nIf the
  deadline is missed: Under the draft\, the Federal Network Agency monitors
  that payments under Section 21d are properly determined\, collected and r
 eceived (Section 85(1) no. 3(d) EEG draft). Breaching an enforceable order
  under Section 85(3) EEG in conjunction with Section 65 EnWG is an adminis
 trative offence under the current Section 86(1) no. 3 EEG (up to EUR 200\,
 000).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-
 2027-refinanzierungsbeitrag
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ets2-early-auctions-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270118
DTEND;VALUE=DATE:20270119
SUMMARY:Applies from: EU ETS 2: first allowance auction on EEX (early aucti
 ons) (Law · adopted)
DESCRIPTION:EU ETS 2 allowances are auctioned on EEX from 18 January 2027\,
  although the regular phase only starts in 2028. Gas suppliers that must s
 urrender allowances as obligated entities from 2028 can buy earlier\; taki
 ng part in primary auctions requires a Union Registry account.\n\nSource: 
 https://eur-lex.europa.eu/eli/reg_del/2026/787/oj\n\nIf the deadline is mi
 ssed: No sanction attaches to the auction date. Under Section 7(2) TEHG ob
 ligated entities must surrender allowances annually by 31 May from 2028\; 
 those who surrender too few pay under Section 46 TEHG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#ets2
 -early-auctions-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:engpasserloese-verwendung-bericht-2026@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270131
DTEND;VALUE=DATE:20270201
SUMMARY:Due by: Congestion income 2026: report the actual use to the Federa
 l Network Agency (Regulatory ruling · adopted\, date open)
DESCRIPTION:Transmission system operators report to the Federal Network Age
 ncy by 31 January how they actually used the 2026 congestion income from a
 llocating cross-zonal capacity. The basis is Article 19(5) of Regulation (
 EU) 2019/943 and Article 5(2) of the ACER methodology on the use of conges
 tion income\; the Federal Network Agency sets the date.\n\nSource: https:/
 /www.bundesnetzagentur.de/DE/Beschlusskammern/BK08/BK8_04_InfoRundschr/41_
 Rundschr/Downloads/Fristenkalender_Netzbetreiber_Netzentgelte_Elektrizitae
 t_2026.pdf\n\nIf the deadline is missed: The ACER methodology sets no sanc
 tion of its own. The Federal Network Agency performs the tasks under Regul
 ation (EU) 2019/943 under Section 56(1) EnWG and can enforce the reporting
  duty with coercive fines under Section 94 EnWG\; the report also feeds it
 s annual report under Article 19(5) of the Regulation.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#engp
 asserloese-verwendung-bericht-2026
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:vde-ar-n-4105-uebergang-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270301
DTEND;VALUE=DATE:20270302
SUMMARY:Applies from: VDE-AR-N 4105:2026-03: end of the transition period (
 Technical rule · adopted\, date open)
DESCRIPTION:The 2026-03 edition replaces the 2018-11 edition. The end of th
 e transition period on 1 March 2027 does not come from the standards body\
 ; according to VDE FNN\, certificates under the 2018-11 edition remain suf
 ficient for up to 24 months after the rule took effect. Technical connecti
 on conditions\, notification forms (F.1.1\, F.1.2) and the connection asse
 ssment up to 500 kW must be switched to the new edition.\n\nSource: https:
 //www.vde-verlag.de/normen/0100940/vde-ar-n-4105-anwendungsregel-2026-03.h
 tml\n\nIf the deadline is missed: The application rule is not a statute an
 d carries no penalty of its own. It sets general minimum technical require
 ments\; conflicting requirements in technical connection conditions are vo
 id under Section 19(1a) EnWG\, and the regulator can have them removed und
 er Section 65 EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-
 ar-n-4105-uebergang-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:energy-sharing-plattform@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270401
DTEND;VALUE=DATE:20270402
SUMMARY:Applies from: Energy sharing: network operators' joint web platform
  (Section 20b EnWG) (Law · adopted\, date open)
DESCRIPTION:Network operators jointly build a nationwide web platform under
  Section 20b EnWG that also registers energy sharing agreements. The Feder
 al Network Agency sets the date\; until then energy sharing runs through t
 he service model.\n\nSource: https://www.gesetze-im-internet.de/enwg_2005/
 __20b.html\n\nIf the deadline is missed: There is no specific fine. The re
 gulator can enforce the duty under Section 20b(1) EnWG to build the platfo
 rm jointly through Section 65 EnWG\; a binding date only exists once the F
 ederal Network Agency sets one under Section 20b(3) EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#ener
 gy-sharing-plattform
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:mako-april-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270401
DTEND;VALUE=DATE:20270402
SUMMARY:Applies from: MaKo format release\, notice no. 58 (Regulatory rulin
 g · adopted)
DESCRIPTION:On 1 April 2027 ActivationDocument AWT version 1.1g and transpo
 rt rules version 1.11\, including the changes to certificate use with mTLS
 \, become binding. The previously consulted replacement of UTILTS by API w
 eb services is off the table.\n\nSource: https://www.bundesnetzagentur.de/
 DE/Beschlusskammern/BK06/BK6_83_Zug_Mess/835_mitteilungen_datenformate/Mit
 teilung_58/Mitteilung_Nr_58.html\n\nIf the deadline is missed: The version
 s are binding under the market communication rulings. The Federal Network 
 Agency can have breaches remedied under Section 65 EnWG\, or Section 76 Ms
 bG for metering point operators\, and enforce this with coercive fines of 
 up to EUR 10 million (Section 94 EnWG). If a secure connection fails becau
 se certificates are missing or invalid\, the party that did not provide th
 em or used them incorrectly bears the consequences (transport rules\, chap
 ter 12).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#mako
 -april-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:vde-ar-n-4100-uebergang-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270401
DTEND;VALUE=DATE:20270402
SUMMARY:Applies from: VDE-AR-N 4100:2026-04: end of the transition period (
 Technical rule · adopted\, date open)
DESCRIPTION:Projects already in planning or under construction on the cut-o
 ff date may be completed under the old edition until this day. After that\
 , only the 2026-04 edition applies to customer installations on the low-vo
 ltage grid\, including instrument transformer installations with semi-indi
 rect metering up to 1\,000 A and the meter-position field for communicatio
 n modules and control units.\n\nSource: https://www.vde-verlag.de/normen/0
 100932/vde-ar-n-4100-anwendungsregel-2026-04.html\n\nIf the deadline is mi
 ssed: The application rule is not a statute and carries no penalty of its 
 own. Under Section 20 sentence 2 NAV\, technical connection conditions mus
 t reflect generally accepted engineering standards\; the regulator can hav
 e breaches of the NAV stopped under Section 65 EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#vde-
 ar-n-4100-uebergang-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fahrplananmeldung-v47-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270401
DTEND;VALUE=DATE:20270402
SUMMARY:Applies from: Schedule nomination process description v4.7 becomes 
 binding (Regulatory ruling · adopted)
DESCRIPTION:From 1 April 2027 version 4.7 of the schedule nomination proces
 s description applies to all market participants required to implement it.
  The changes relate to European market coupling.\n\nSource: https://www.bu
 ndesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2018/BK6-18-061/Mitteil
 ungen/Mitteilung_Nr_17/Mitteilung_17.html\n\nIf the deadline is missed: Th
 rough Annex 3 the process description is part of the approved balance grou
 p contract\; the Federal Network Agency can have breaches remedied under S
 ection 65 EnWG. The approved balance group contract (BK6-18-061) provides 
 in clause 20 for a formal warning in case of breaches and extraordinary te
 rmination if they recur.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#fahr
 plananmeldung-v47-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:qualitaetselement-datenerhebung-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270430
DTEND;VALUE=DATE:20270501
SUMMARY:Due by: Quality element for grid reliability: submit 2026 data to t
 he Federal Network Agency (Regulatory ruling · adopted)
DESCRIPTION:Electricity distribution system operators in the standard proce
 dure submit their 2026 supply interruption data and the other items of the
  survey form to the Federal Network Agency by 30 April 2027. The agency us
 es them to set the quality element\, a bonus or penalty on the revenue cap
 . This is the last date under this determination.\n\nSource: https://www.b
 undesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK8-GZ/2023/2023_4-Steller/BK
 8-23-0001/BK8-23-0001-A_Festlegung_DL_BF.pdf?__blob=publicationFile&v=1\n\
 nIf the deadline is missed: The determination also rests on Section 69(7) 
 EnWG. According to the ruling chamber\, failing to provide the information
 \, providing it late or incorrectly is an administrative offence under Sec
 tion 95(1) no. 3(a) EnWG\, with a fine of up to EUR 100\,000 (Section 95(2
 ) no. 5 EnWG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#qual
 itaetselement-datenerhebung-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:stromvkg-erzeugungskapazitaeten-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270518
DTEND;VALUE=DATE:20270519
SUMMARY:Due by: Power plant strategy (StromVKG): auction for generation cap
 acity (Law · adopted)
DESCRIPTION:On 18 May 2027 the Federal Network Agency auctions 2 gigawatts 
 of generation capacity. Only generation plants are eligible\, with a 15-ye
 ar commitment.\n\nSource: https://www.gesetze-im-internet.de/stromvkg/BJNR
 0D2AB0026.html\n\nIf the deadline is missed: A bid must reach the Federal 
 Network Agency by the bid date\, with no reinstatement (Section 37(1) Stro
 mVKG). Bids without the fee or security paid by then are excluded under Se
 ction 49(1) no. 1 StromVKG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#stro
 mvkg-erzeugungskapazitaeten-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:kapitalkostenaufschlag-antrag-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:Due by: Capital cost mark-up 2028: application to the regulator (La
 w · adopted)
DESCRIPTION:Network operators that want capital costs from investments made
  after the base year reflected in their 2028 revenue cap apply for the cap
 ital cost mark-up under Section 10a ARegV by 30 June 2027. The revenue cap
  is adjusted on 1 January 2028.\n\nSource: https://www.gesetze-im-internet
 .de/aregv/__4.html\n\nIf the deadline is missed: Without a timely applicat
 ion the 2028 revenue cap is not adjusted for the capital cost mark-up\; un
 der Section 4(4) ARegV the next application is only possible by 30 June of
  the following year.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#kapi
 talkostenaufschlag-antrag-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:engpassmanagement-referenzwert-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270831
DTEND;VALUE=DATE:20270901
SUMMARY:Due by: Congestion management: report the 2028 cost reference value
  and the 2026 difference (Law · adopted)
DESCRIPTION:The transmission system operators report their joint reference 
 value for 2028 congestion management costs to the Federal Network Agency b
 y 31 August 2027. By the same date they report the difference between actu
 al 2026 costs and the 2026 reference value and the key for splitting the b
 onus or penalty.\n\nSource: https://www.gesetze-im-internet.de/aregv/__17.
 html\n\nIf the deadline is missed: Section 17 ARegV sets no penalty of its
  own. The Federal Network Agency can order the report under Section 65(2) 
 EnWG and enforce it with coercive fines\; the bonus or penalty enters the 
 revenue cap ex officio under Section 4(5) ARegV.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#engp
 assmanagement-referenzwert-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:uenb-eog-bericht-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270929
DTEND;VALUE=DATE:20270930
SUMMARY:Due by: Revenue cap 2028: TSO report on the adjustment and provisio
 nal network charges (Regulatory ruling · adopted)
DESCRIPTION:Transmission system operators report to the Federal Network Age
 ncy two working days before 1 October\, in 2027 by 29 September\, on the a
 djustment of their 2028 revenue cap and how they set provisional network c
 harges. The basis is determination BK8-19/0001-A of 11 September 2019.\n\n
 Source: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK08/BK8_04_I
 nfoRundschr/41_Rundschr/Downloads/Fristenkalender_Netzbetreiber_Netzentgel
 te_Elektrizitaet_2026.pdf\n\nIf the deadline is missed: The reporting duty
  rests on a determination under Section 29(1) EnWG. If a transmission syst
 em operator fails to comply\, the Federal Network Agency can order complia
 nce under Section 65(2) EnWG and enforce it with coercive fines.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#uenb
 -eog-bericht-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:mispel-uebergang-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20270930
DTEND;VALUE=DATE:20271001
SUMMARY:Due by: MiSpeL: end of the transition period (Regulatory ruling · 
 adopted)
DESCRIPTION:Until the end of September 2027 the demarcation option and the 
 flat-rate option can be used only with the consent of the grid operator an
 d the metering operator. Both use that period to set up metering\, data de
 livery and billing for the two options.\n\nSource: https://www.bundesnetza
 gentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Aufsic
 ht/MiSpeL/start.html\n\nIf the deadline is missed: From 1 October 2027 gri
 d and metering operators must enable the demarcation and flat-rate options
  even without their consent (MiSpeL\, operative point 7). If they do not\,
  the Federal Network Agency can order remedies under Section 85(3) EEG wit
 h Section 65 EnWG\; breaching the enforceable order is an administrative o
 ffence under Section 86(1) no. 3 EEG (up to EUR 200\,000).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#misp
 el-uebergang-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fahrplan-sicherheit-v24-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20271001
DTEND;VALUE=DATE:20271002
SUMMARY:Applies from: Secure exchange rules for scheduling v2.4 become bind
 ing (Regulatory ruling · adopted)
DESCRIPTION:From 1 October 2027 version 2.4 of the rules for secure exchang
 e in scheduling applies to all market participants required to implement i
 t. It covers transmission channels and certificates for schedule exchange.
 \n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-
 GZ/2018/BK6-18-061/Mitteilungen/Mitteilung_Nr_17/Mitteilung_17.html\n\nIf 
 the deadline is missed: The recipient may leave schedule messages that are
  not properly signed or encrypted unprocessed\, and the sender bears the c
 onsequences (chapter 7 of the rules). The approved balance group contract 
 (BK6-18-061) provides in clause 20 for a formal warning in case of breache
 s and extraordinary termination if they recur.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#fahr
 plan-sicherheit-v24-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ee-netzkostenwaelzung-meldung-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20271014
DTEND;VALUE=DATE:20271015
SUMMARY:Due by: Renewables grid cost pass-through: binding notification to 
 the TSO (Regulatory ruling · adopted)
DESCRIPTION:Distribution system operators with eligible extra costs from re
 newables integration submit their binding pass-through notification for 20
 28 to their transmission system operator. The deadline is the last working
  day before 15 October.\n\nSource: https://www.bundesnetzagentur.de/DE/Bes
 chlusskammern/1_GZ/BK8-GZ/2024/2024_4-Steller/BK8-24-0001/Downloads/BK8-24
 -0001-A_Festlegung_Download_BF.pdf?__blob=publicationFile&v=4\n\nIf the de
 adline is missed: Under operative item 5(b) of ruling BK8-24-001-A\, a lat
 e notification means the transmission system operator no longer reimburses
  the pass-through amount for 2028\, and the figures can no longer be corre
 cted. This also applies if only the notification to the regulator by 1 Oct
 ober was on time.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#ee-n
 etzkostenwaelzung-meldung-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:netzentgelte-veroeffentlichung-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20271015
DTEND;VALUE=DATE:20271016
SUMMARY:Due by: 2028 network charges: publication by 15 October (Law · ado
 pted)
DESCRIPTION:Electricity and gas distribution grid operators publish their 2
 028 network charges online. If the charges are not yet calculated on the c
 ut-off date\, operators publish the expected level derived from the revenu
 e cap.\n\nSource: https://www.gesetze-im-internet.de/enwg_2005/__20.html\n
 \nIf the deadline is missed: Section 20 EnWG sets no penalty of its own fo
 r late publication. The regulator can order publication under Section 65(2
 ) EnWG and enforce it with coercive fines under Section 94 EnWG\; breachin
 g the enforceable order is an administrative offence under Section 95(1) n
 o. 3(a) EnWG (up to EUR 100\,000).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#netz
 entgelte-veroeffentlichung-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:remit-meldungen-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20271029
DTEND;VALUE=DATE:20271030
SUMMARY:Applies from: REMIT II: new reporting formats and first exposure re
 port (Law · adopted)
DESCRIPTION:From 29 October 2027 the new data fields apply to continuous tr
 ansaction reporting to ACER. Market participants with positions of 600 GWh
  per year or more report exposures quarterly\, first in October 2027\; bal
 ancing service transactions must be reported monthly from 29 April 2028.\n
 \nSource: https://eur-lex.europa.eu/eli/reg_impl/2026/256/oj\n\nIf the dea
 dline is missed: Failing\, intentionally or recklessly\, to report transac
 tion data to ACER under Article 8(1) REMIT\, or reporting it incorrectly\,
  incompletely or late\, is an administrative offence under Section 95(1c) 
 no. 7 EnWG\, with fines of up to EUR 10\,000. The Federal Network Agency c
 an also take supervisory measures under Section 65(6) EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#remi
 t-meldungen-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:stromvkg-kapazitaeten-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20271201
DTEND;VALUE=DATE:20271202
SUMMARY:Due by: Capacity market (StromVKG): first technology-open capacity 
 auction (Law · adopted)
DESCRIPTION:The first capacity auction takes place on 1 December 2027\, ope
 n to generation plants\, electricity storage\, controllable loads and plan
 t pools. Prequalification with the responsible transmission system operato
 r is required first\; applications are only possible from the seventh to t
 he fifth month before the bid date.\n\nSource: https://www.gesetze-im-inte
 rnet.de/stromvkg/BJNR0D2AB0026.html\n\nIf the deadline is missed: Without 
 prequalification the Federal Network Agency excludes a bid under Section 4
 9(2) StromVKG\, and prequalification can only be applied for within the wi
 ndow in Section 26(2). A late bid does not count\, and there is no reinsta
 tement (Section 37(1) StromVKG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#stro
 mvkg-kapazitaeten-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ai-act-annex-iii@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20271202
DTEND;VALUE=DATE:20271203
SUMMARY:Applies from: EU AI Act: high-risk requirements\, Annex III (Law ·
  adopted)
DESCRIPTION:From 2 December 2027 the high-risk duties apply to Annex III sy
 stems\, such as credit checks and applicant screening. Under the Commissio
 n's draft guidelines of 19 May 2026\, grid AI is only covered where\, as a
  safety component\, it directly protects the asset and the operator is des
 ignated a critical entity. The Bundesnetzagentur has been the supervisory 
 authority since 29 July 2026.\n\nSource: https://eur-lex.europa.eu/eli/reg
 /2026/1744/oj\n\nIf the deadline is missed: Breaches of the duties of prov
 iders (Art. 16) and deployers (Art. 26) of high-risk AI can be fined under
  Art. 99(4)(a) and (e) of the AI Act up to EUR 15 million or 3% of worldwi
 de turnover\, with the lower amount for SMEs and small mid-caps (Art. 99(6
 ) and (6a)). Under Art. 111(2)\, systems placed on the market or put into 
 service before 2 December 2027 are only covered after a significant change
 .
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#ai-a
 ct-annex-iii
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:agnes-folgefestlegungen-2027@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20271231
DTEND;VALUE=DATE:20280101
SUMMARY:Decision: AgNes: follow-up rulings that fill in the detail (Regulat
 ory ruling · expected)
DESCRIPTION:After the framework ruling at the end of 2026\, the Bundesnetza
 gentur plans to fill in the new system in follow-up rulings during 2027. D
 istribution system operators plan billing and systems against this detail.
 \n\nSource: https://www.bundesnetzagentur.de/SharedDocs/Pressemitteilungen
 /DE/2026/20260527_Agnes.html\n\nIf the deadline is missed: The Federal Net
 work Agency issues the follow-up rulings. If they slip\, less time remains
  to convert price sheets\, billing and systems before the new system appli
 es from 2029.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#agne
 s-folgefestlegungen-2027
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:is-u-wartungsende@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20271231
DTEND;VALUE=DATE:20280101
SUMMARY:Due by: SAP ECC and IS-U: end of mainstream maintenance (Vendor not
 ice · not binding)
DESCRIPTION:After that\, extended maintenance until the end of 2030 at a pr
 emium of two percentage points on the maintenance basis\, followed by cust
 omer-specific maintenance.\n\nSource: https://support.sap.com/en/release-u
 pgrade-maintenance/maintenance-information/maintenance-strategy/s4hana-bus
 iness-suite7.html\n\nIf the deadline is missed: The date is set by SAP\, n
 ot by law. From 2028 extended maintenance runs at a premium until the end 
 of 2030\; under the customer-specific maintenance that follows\, or applie
 s without it\, SAP delivers no legal changes. For its largest customers SA
 P offers the Transition Option for SAP ERP from 2031 to 2033 if the system
  has moved to SAP ERP\, private edition\, on SAP HANA by the end of 2030.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#is-u
 -wartungsende
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nest-gas-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20280101
DTEND;VALUE=DATE:20280102
SUMMARY:Applies from: NEST: fifth regulatory period\, gas (Regulatory rulin
 g · adopted)
DESCRIPTION:New incentive regulation under the NEST rulings of December 202
 5. The fifth period lasts five years\, to the end of 2032 (RAMEN Gas\, ope
 rative item 3.1)\, followed by three-year periods.\n\nSource: https://www.
 bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/2025/GBK-25-01-2x1_RA
 MEN_Gas/Downloads/FL_Ramen_Gas_DL_BF.pdf\n\nIf the deadline is missed: The
  start of the period triggers no penalty itself\; the regulator sets the r
 evenue caps ex officio (RAMEN Gas\, operative item 4.1). It can enforce du
 ties under the NEST rulings\, such as notifying the capital cost markup by
  30 June of the previous year\, under Section 65 EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#nest
 -gas-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ets2-start-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20280101
DTEND;VALUE=DATE:20280102
SUMMARY:Applies from: EU ETS 2 starts: emissions trading for buildings and 
 transport replaces the national BEHG (Law · adopted)
DESCRIPTION:The regular phase of EU ETS 2 starts on 1 January 2028\; the fi
 rst surrender of allowances for 2028 emissions is due by 31 May 2029. Repo
 rting and surrender duties under the national BEHG continue through 2027.\
 n\nSource: https://eur-lex.europa.eu/eli/reg/2026/667/oj\n\nIf the deadlin
 e is missed: If an obligated entity does not surrender enough allowances b
 y 31 May\, the authority sets a payment of EUR 100 per missing tonne of CO
 2 equivalent under Section 46(1) TEHG\, indexed to inflation since 2012. T
 he allowances must still be surrendered\, and the name is published in the
  Federal Gazette (Section 46(3) and (4) TEHG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#ets2
 -start-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bruecken-rueckstellungen-gas-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20280101
DTEND;VALUE=DATE:20280102
SUMMARY:Applies from: BRÜCKEN ruling: provisions for decommissioning and d
 ismantling gas grids (Regulatory ruling · adopted)
DESCRIPTION:From the fifth regulatory period\, allocations to and releases 
 of provisions for decommissioning and unavoidable dismantling of gas grids
  count as cost shares outside the efficiency benchmark. Network operators 
 include them each year at the actual values of the year before last.\n\nSo
 urce: https://www.bundesnetzagentur.de/DE/Beschlusskammern/BK09/BK9_01_Akt
 uell/BK9_Aktuell.html\n\nIf the deadline is missed: The BRÜCKEN ruling (B
 K9-25/618) only recognises provisions for necessary decommissioning and un
 avoidable dismantling\; the regulator can correct allocations that are not
  appropriate\, such as catch-up or one-off allocations. Amounts not recogn
 ised do not enter the revenue cap as cost shares outside the efficiency be
 nchmark.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#brue
 cken-rueckstellungen-gas-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:smgw-einbau-neuer-stand-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20280101
DTEND;VALUE=DATE:20280102
SUMMARY:Applies from: Smart meter gateways: installation only to version 2.
 0 of protection profile and TR-03109-1 (Regulatory ruling · adopted)
DESCRIPTION:Under the BSI transition rules\, gateways certified to protecti
 on profile PP-0073 version 1.3 and TR-03109-1 version 1.1 may only be inst
 alled until 31 December 2027\, and recertification to that standard can be
  requested until that date at the latest. After that\, version 2.0 applies
  to newly installed gateways. Devices already in the field can move to the
  new standard by software update.\n\nSource: https://www.bsi.bund.de/Share
 dDocs/Downloads/DE/BSI/Zertifizierung/Schutzprofile/Uebergangsregelung-PP-
 0073_und_TR-03109-1.pdf\n\nIf the deadline is missed: Under Section 19(2) 
 MsbG\, only systems that meet Sections 21 and 22 may be used for billing\,
  balancing and grid-related metering and control\; the yardstick is the pr
 otection profiles and technical guidelines in the version in force\, which
  the BSI publishes under Section 22(2). The Federal Network Agency can act
  against breaches under Section 76 MsbG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#smgw
 -einbau-neuer-stand-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:eeg-smgw-steuerung-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20280101
DTEND;VALUE=DATE:20280102
SUMMARY:Applies from: EEG: control via the smart meter gateway from 2028 (L
 aw · adopted)
DESCRIPTION:From 1 January 2028\, and once a smart metering system is insta
 lled\, plants above 25 kW in direct marketing must be readable and remotel
 y controllable via the smart meter gateway (Section 10b(2) EEG). From 2028
 \, after a smart metering system and control device have been installed\, 
 grid operators pay the plant operator EUR 100 gross for each year begun un
 til the controllability test has succeeded (Section 9(2a) EEG).\n\nSource:
  https://www.gesetze-im-internet.de/eeg_2014/__10b.html\n\nIf the deadline
  is missed: Until the test succeeds\, the grid operator pays the plant ope
 rator EUR 100 gross for each year begun from 2028 under Section 9(2a) EEG\
 , unless it is not responsible for the failed test. Plant operators in bre
 ach of Section 10b EEG pay the grid operator up to EUR 10 per kilowatt and
  calendar month under Section 52(1) no. 4 and (2) EEG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#eeg-
 smgw-steuerung-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:energy-sharing-nachbarnetz-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20280601
DTEND;VALUE=DATE:20280602
SUMMARY:Applies from: Energy sharing across the grid boundary (Law · adopt
 ed)
DESCRIPTION:From 1 June 2028 energy sharing must also work with the balanci
 ng area of a directly adjacent DSO in the same control area\; the adjacent
  operator must cooperate. According to the Federal Network Agency's Notice
  No. 73\, the supplier based service model covers this too\, with no furth
 er implementation by network operators.\n\nSource: https://www.gesetze-im-
 internet.de/enwg_2005/__42c.html\n\nIf the deadline is missed: There is no
  specific fine. If a distribution system operator does not enable shared u
 se with the adjacent balancing area (Section 42c(4) sentence 1 no. 2 EnWG)
 \, the regulator can order remedies under Section 65 EnWG. According to th
 e Federal Network Agency's Notice No. 73\, the supplier-based service mode
 l covers this stage too.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#ener
 gy-sharing-nachbarnetz-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:wpg-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20280630
DTEND;VALUE=DATE:20280701
SUMMARY:Due by: WPG: heat plans for all municipalities with 100\,000 inhabi
 tants or fewer (Law · adopted)
DESCRIPTION:After the large cities\, heat plans must be drawn up for all ot
 her municipal areas by 30 June 2028\; utilities provide the data basis.\n\
 nSource: https://www.gesetze-im-internet.de/wpg/__4.html\n\nIf the deadlin
 e is missed: The deadline binds the planning bodies\, usually municipaliti
 es\, not the network operators. If grid or heat network operators withhold
  the information owed under Section 11(1) no. 2 WPG\, the planning body ca
 n order it with a deadline under Section 11(6) WPG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#wpg-
 2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:mabis-hub-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20280701
DTEND;VALUE=DATE:20280702
SUMMARY:Due by: MaBiS hub: test systems of all market partners ready (BDEW 
 scenario) (Regulatory ruling · not yet adopted)
DESCRIPTION:Under the BDEW introduction scenario\, the test systems of all 
 market partners and of the MaBiS hub are available from 1 July 2028. Every
  interface to the hub has to pass at least one test by 30 September 2028. 
 Parallel operation starts on 1 January 2029.\n\nSource: https://www.bundes
 netzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2024/BK6-24-210/BK6-24-210-
 1/Anlagen/BK6-24-210-1_BDEW_Meilensteine_EinfSz.pdf?__blob=publicationFile
 &v=1\n\nIf the deadline is missed: There is no decision yet in proceeding 
 BK6-24-210\, and the date comes from the industry's introduction scenario.
  It only becomes binding and enforceable under Section 65 EnWG once a ruli
 ng sets it.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#mabi
 s-hub-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:msbg-gas-rlm-gateway-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20280701
DTEND;VALUE=DATE:20280702
SUMMARY:Applies from: Metering Act Section 40: new gas meters with load pro
 file metering on the smart meter gateway (Law · adopted)
DESCRIPTION:New gas meters with interval (load profile) metering must be co
 nnected to existing smart meter gateways from 1 July 2028 at the latest. O
 ther new gas meters follow once connection is technically possible and cau
 ses no extra cost.\n\nSource: https://www.gesetze-im-internet.de/messbg/__
 40.html\n\nIf the deadline is missed: Section 40 MsbG sets no penalty of i
 ts own. The Federal Network Agency can order compliance under Section 76(2
 ) MsbG and enforce it with coercive fines of EUR 1\,000 to EUR 10 million 
 (Section 76(4) MsbG\, Section 94 EnWG).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg
 -gas-rlm-gateway-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bsig-39-nachweis@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20281206
DTEND;VALUE=DATE:20281207
SUMMARY:Due by: BSIG §39: first evidence for critical installations (Law 
 · adopted\, date open)
DESCRIPTION:Operators of critical installations must prove their security m
 easures through an audit\, review or certification\, then every three year
 s. The BSI sets the date\, at the earliest three years after the installat
 ion counts as critical\; for existing KRITIS operators at the earliest thr
 ee years after their last audit under the former Section 8a(3) BSIG (Secti
 on 39(3) BSIG).\n\nSource: https://www.gesetze-im-internet.de/bsig_2025/__
 39.html\n\nIf the deadline is missed: Section 39 BSIG does not apply to en
 ergy networks and energy installations under Sections 5c to 5e EnWG (Secti
 on 28(5) BSIG)\; for them Section 95(1) nos. 3c and 3d EnWG penalise missi
 ng or late documentation. For other critical installations\, failing to pr
 ovide the evidence under Section 39(1) BSIG\, or providing it late\, is an
  administrative offence under Section 65(2) no. 10 BSIG\, with fines of up
  to EUR 1 million.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#bsig
 -39-nachweis
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:rollout-quote-50@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20281231
DTEND;VALUE=DATE:20290101
SUMMARY:Due by: Smart meter rollout: 90 percent of the 2027 to 2028 install
 ation cases (Law · adopted)
DESCRIPTION:By the end of 2028 default metering point operators must have e
 quipped at least 90 percent of the metering points that fall due for insta
 llation in 2027 and 2028.\n\nSource: https://www.gesetze-im-internet.de/me
 ssbg/__45.html\n\nIf the deadline is missed: If the default metering point
  operator misses the quota\, the Federal Network Agency can order measures
  under Sections 45(2) and 76 MsbG and enforce them with coercive fines of 
 EUR 1\,000 to EUR 10 million (Section 76(4) MsbG\, Section 94 EnWG). If th
 e rollout of control units falls short by at least 25 percent and this con
 tributes significantly to a possible threat to system security\, it can wi
 thdraw the default responsibility under Section 12(2g) EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#roll
 out-quote-50
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:rollout-quote-erzeuger-2028@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20281231
DTEND;VALUE=DATE:20290101
SUMMARY:Due by: Smart meter rollout: 90 percent of new generation capacity 
 by the end of 2028\, for the first time also above 100 kilowatts (Law · a
 dopted)
DESCRIPTION:By the end of 2028 default metering point operators must have e
 quipped\, for systems up to 100 kilowatts\, at least 90 percent of the cap
 acity commissioned from 1 October 2026 to 30 September 2028 and at least 5
 0 percent of the capacity commissioned from 1 January 2018 to 25 February 
 2025. For systems above 100 kilowatts equipping starts in 2028 at the late
 st\, and by the end of 2028 the equipped metering points must cover 90 per
 cent of the capacity commissioned from 1 October 2027 to 30 September 2028
 .\n\nSource: https://www.gesetze-im-internet.de/messbg/__45.html\n\nIf the
  deadline is missed: If the default metering point operator misses the quo
 ta\, the Federal Network Agency can order measures under Sections 45(2) an
 d 76 MsbG and enforce them with coercive fines of EUR 1\,000 to EUR 10 mil
 lion (Section 76(4) MsbG\, Section 94 EnWG). If the equipping of installat
 ions with control units falls short by at least 25 percent and this contri
 butes significantly to a possible threat to system security\, it can withd
 raw the default responsibility under Section 12(2g) EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#roll
 out-quote-erzeuger-2028
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:14a-uebergang@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20290101
DTEND;VALUE=DATE:20290102
SUMMARY:Applies from: §14a EnWG: end of the transition period (Regulatory 
 ruling · adopted)
DESCRIPTION:Preventive control is only allowed until 31 December 2028\; fro
 m 2029 grid operators control solely on a grid-oriented basis using grid s
 tate assessment\, which has applied to new installations since 2024. The o
 ld §14a rules end on the same date: legacy installations above 4.2 kW wit
 h a reduced network charge move into the new rules\, night storage heaters
  keep the old arrangement\, and the rest lose the reduction.\n\nSource: ht
 tps://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-GZ/2022/BK6-22
 -300/Beschluss/BK6-22-300_Beschluss_Anlage1.pdf?__blob=publicationFile&v=1
 \n\nIf the deadline is missed: From 1 January 2029 ruling BK6-22-300 no lo
 nger permits preventive control (Annex 1 item 10.5)\, and the new rules ap
 ply to legacy installations above 4.2 kW with the old §14a reduction (ite
 m 10.2). The Federal Network Agency can order a breach to stop under Secti
 on 65 EnWG and enforce this with coercive fines under Section 94 EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#14a-
 uebergang
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:agnes-wirkung@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20290101
DTEND;VALUE=DATE:20290102
SUMMARY:Applies from: AgNes: new grid charge system takes effect (Regulator
 y ruling · not yet adopted)
DESCRIPTION:StromNEV expires on 31 December 2028\; the BNetzA rulings repla
 ce the ordinance.\n\nSource: https://www.bundesnetzagentur.de/SharedDocs/P
 ressemitteilungen/DE/2026/20260806_Agnes.html\n\nIf the deadline is missed
 : Under the draft ruling (operative point 1.2)\, only grid charges under t
 he AgNes system are permitted from 1 January 2029. A network operator that
  bills otherwise can be ordered by the regulator to comply under Section 6
 5 EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#agne
 s-wirkung
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:nest-strom-2029@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20290101
DTEND;VALUE=DATE:20290102
SUMMARY:Applies from: NEST: fifth regulatory period\, electricity (Regulato
 ry ruling · adopted)
DESCRIPTION:New electricity incentive regulation under the NEST rulings\; t
 he fifth period lasts five years (RAMEN Strom\, operative item 3.1). From 
 2029 network reliability feeds into the revenue cap as a bonus or deductio
 n\, while network performance indicators are only published for now.\n\nSo
 urce: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/GBK-GZ/202
 5/GBK-25-01-1x1_RAMEN_Strom/Downloads/FL_Ramen_Strom_DL_BF.pdf\n\nIf the d
 eadline is missed: From 2029 the regulator sets annual bonuses or deductio
 ns on the revenue cap where a network operator's reliability deviates from
  the reference value (quality element\, ruling GBK-24-02-1#4\, operative i
 tem 5.4.1). It can enforce other duties under the NEST rulings under Secti
 on 65 EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#nest
 -strom-2029
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:kundenanlagen-regulierung-2029@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20290101
DTEND;VALUE=DATE:20290102
SUMMARY:Applies from: Customer installations: transition period for existin
 g installations ends (Law · adopted)
DESCRIPTION:For customer installations under Section 3 nos. 65 and 66 EnWG 
 connected by 23 December 2025\, grid regulation rules only apply from 1 Ja
 nuary 2029. Operators of such installations clarify by then whether and wh
 ich regulatory requirements apply to them.\n\nSource: https://www.gesetze-
 im-internet.de/enwg_2005/__118.html\n\nIf the deadline is missed: From 1 J
 anuary 2029 the grid regulation rules also apply to these existing install
 ations (Section 118(7) EnWG). If they are not met\, the regulator can orde
 r measures under Section 65 EnWG\; breaching the enforceable order is an a
 dministrative offence under Section 95(1) no. 3(a) EnWG (up to EUR 100\,00
 0).
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#kund
 enanlagen-regulierung-2029
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:msbg-19-5-altmesssysteme-2029@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20290101
DTEND;VALUE=DATE:20290102
SUMMARY:Applies from: MsbG Section 19(5): non-compliant metering systems ab
 ove 100\,000 kWh or 100 kW only under conditions (Law · adopted)
DESCRIPTION:From 1 January 2029\, metering systems that do not meet smart m
 etering system requirements may only be installed and used at metering poi
 nts above 100\,000 kWh annual consumption or at plants above 100 kW if a s
 mart metering system installation has been announced or ordered\, there ar
 e no disproportionate risks\, and the connection user has consented or the
  BSI has issued a determination. For all other metering points this limit 
 has applied since the end of 2025.\n\nSource: https://www.gesetze-im-inter
 net.de/messbg/__19.html\n\nIf the deadline is missed: The MsbG has no admi
 nistrative fine provision of its own. The Federal Network Agency can order
  the conduct to stop under Section 76 MsbG and enforce the order with coer
 cive fines under Section 94 EnWG (Section 76(4) MsbG). Whether breaching s
 uch an order can be fined as an administrative offence under Section 95 En
 WG is unsettled\, because Section 95(1) no. 3(a) EnWG only lists orders un
 der the EnWG\, such as Section 65\, and none under the MsbG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#msbg
 -19-5-altmesssysteme-2029
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:speicher-netzentgeltbefreiung-2029@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20290804
DTEND;VALUE=DATE:20290805
SUMMARY:Due by: Electricity storage: commissioning deadline for the grid fe
 e exemption under Section 118(6) EnWG (Law · adopted)
DESCRIPTION:Electricity storage commissioned within 18 years from 4 August 
 2011 is exempt for 20 years from grid fees on electricity drawn for storag
 e. The exemption only applies to the extent the stored electricity is fed 
 back into the same grid with a time delay.\n\nSource: https://www.gesetze-
 im-internet.de/enwg_2005/__118.html\n\nIf the deadline is missed: Storage 
 commissioned after the deadline is not exempt from grid fees under Section
  118(6) sentence 1 EnWG\; commissioning means the first draw of electricit
 y for trial operation (sentence 6). Under the AgNes draft (operative point
  17.5) the exemption is also to require an investment decision before the 
 ruling is notified\, to be proven by 31 March 2027.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#spei
 cher-netzentgeltbefreiung-2029
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:mabis-hub-produktivstart@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20291001
DTEND;VALUE=DATE:20291002
SUMMARY:Applies from: MaBiS hub: go-live (BDEW scenario) (Regulatory ruling
  · not yet adopted)
DESCRIPTION:Under the BDEW introduction scenario\, parallel operation ends 
 on 1 October 2029 and only the new process landscape with the MaBiS hub ap
 plies from then on. Block 1 of the ruling (BK6-24-210-1) was open for comm
 ent until 17 November 2025\; block 2 on balance group settlement follows.\
 n\nSource: https://www.bundesnetzagentur.de/DE/Beschlusskammern/1_GZ/BK6-G
 Z/2024/BK6-24-210/BK6-24-210-1/Anlagen/BK6-24-210-1_BDEW_Meilensteine_Einf
 Sz.pdf?__blob=publicationFile&v=1\n\nIf the deadline is missed: The go-liv
 e date so far only appears in the industry's introduction scenario\; there
  is no decision yet in proceeding BK6-24-210. Only a ruling would make the
  date binding and enforceable under Section 65 EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#mabi
 s-hub-produktivstart
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:rollout-quote-95@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20301231
DTEND;VALUE=DATE:20310101
SUMMARY:Due by: Smart meter rollout: 90 percent of the 2029 to 2030 install
 ation cases (Law · adopted)
DESCRIPTION:Third period quota of the statutory rollout: at least 90 percen
 t of the metering points that fall due in 2029 and 2030. The target year f
 or the full stock is 2032.\n\nSource: https://www.gesetze-im-internet.de/m
 essbg/__45.html\n\nIf the deadline is missed: If the default metering poin
 t operator misses the quota\, the Federal Network Agency can order measure
 s under Sections 45(2) and 76 MsbG and enforce them with coercive fines of
  EUR 1\,000 to EUR 10 million (Section 76(4) MsbG\, Section 94 EnWG). If t
 he rollout of control units falls short by at least 25 percent and this co
 ntributes significantly to a possible threat to system security\, it can w
 ithdraw the default responsibility under Section 12(2g) EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#roll
 out-quote-95
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:smart-meter-zielmarke-2030@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20301231
DTEND;VALUE=DATE:20310101
SUMMARY:Target: Coalition committee: smart meter rollout above 90 percent o
 f all relevant metering points by end of 2030 (Policy · not binding)
DESCRIPTION:The coalition committee wants the rollout for all relevant mete
 ring points more than 90 percent complete by the end of 2030\, two years a
 head of the current MsbG target year 2032. A low-cost "Smart Meter Light" 
 is planned for customers outside the mandatory rollout. No draft bill has 
 been published yet.\n\nSource: https://www.bundesregierung.de/resource/blo
 b/2196306/2445592/bc8e5e160d879f0bdd593121a96a45d2/2026-07-02-koaausschuss
 -data.pdf?download=1\n\nIf the deadline is missed: The target is a coaliti
 on decision without legal effect. The binding quotas remain those in Secti
 on 45 MsbG\, which the Federal Network Agency can enforce under Section 76
  MsbG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#smar
 t-meter-zielmarke-2030
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:rollout-quote-erzeuger-2030@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20301231
DTEND;VALUE=DATE:20310101
SUMMARY:Due by: Smart meter rollout: 90 percent of new generation capacity 
 by the end of 2030 (Law · adopted)
DESCRIPTION:By the end of 2030 default metering point operators must have e
 quipped at least 90 percent of the generation capacity commissioned from 1
  October 2028 to 30 September 2030\, separately for systems up to and abov
 e 100 kilowatts. The yardstick is installed capacity\, not the number of m
 etering points.\n\nSource: https://www.gesetze-im-internet.de/messbg/__45.
 html\n\nIf the deadline is missed: If the default metering point operator 
 misses the quota\, the Federal Network Agency can order measures under Sec
 tions 45(2) and 76 MsbG and enforce them with coercive fines of EUR 1\,000
  to EUR 10 million (Section 76(4) MsbG\, Section 94 EnWG). If the equippin
 g of installations with control units falls short by at least 25 percent a
 nd this contributes significantly to a possible threat to system security\
 , it can withdraw the default responsibility under Section 12(2g) EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#roll
 out-quote-erzeuger-2030
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:eu-imsys-quote-50-2031@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20311231
DTEND;VALUE=DATE:20320101
SUMMARY:Due by: EU proposal: smart metering systems for 50 percent of all f
 inal customers (Article 18b Regulation (EU) 2019/943) (Law · not yet adop
 ted)
DESCRIPTION:Under Commission proposal COM(2026) 600\, smart metering system
 s would have to cover at least 50 percent of all final customers\, with 75
  percent as the next step. Member states below 30 percent when the regulat
 ion enters into force get until 31 December 2031 and 31 December 2034\; Ge
 rmany stood at 5.9 percent on 30 June 2026. The cost-benefit analysis woul
 d only apply to rollout beyond 75 percent. Nothing has been adopted yet.\n
 \nSource: https://dserver.bundestag.de/brd/2026/0501-26.pdf\n\nIf the dead
 line is missed: Under the proposal the quota is addressed to member states
  and sets no sanction for metering operators. Consequences for default met
 ering operators would only follow from implementation in the MsbG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#eu-i
 msys-quote-50-2031
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:rollout-quote-2032@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20321231
DTEND;VALUE=DATE:20330101
SUMMARY:Due by: Smart meter rollout: 90 percent of all mandatory cases (Law
  · adopted)
DESCRIPTION:Final mark of the statutory rollout: by the end of 2032\, 90 pe
 rcent of all metering points to be equipped need an intelligent metering s
 ystem. Optional installation cases count towards the quota since the EnWR
 ÄndG of 18 December 2025.\n\nSource: https://www.gesetze-im-internet.de/m
 essbg/__45.html\n\nIf the deadline is missed: If the default metering poin
 t operator misses the quota\, the Federal Network Agency can order measure
 s under Sections 45(2) and 76 MsbG and enforce them with coercive fines of
  EUR 1\,000 to EUR 10 million (Section 76(4) MsbG\, Section 94 EnWG). If t
 he rollout of control units falls short by at least 25 percent and this co
 ntributes significantly to a possible threat to system security\, it can w
 ithdraw the default responsibility under Section 12(2g) EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#roll
 out-quote-2032
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:rollout-quote-erzeuger-2032@innobu.com
DTSTAMP:20261023T000000Z
DTSTART;VALUE=DATE:20321231
DTEND;VALUE=DATE:20330101
SUMMARY:Due by: Smart meter rollout: 90 percent of total generation capacit
 y (Law · adopted)
DESCRIPTION:By the end of 2032 default metering point operators must have e
 quipped metering points covering at least 90 percent of the total installe
 d generation capacity\, separately for systems up to and above 100 kilowat
 ts. The yardstick is installed capacity\, not the number of metering point
 s.\n\nSource: https://www.gesetze-im-internet.de/messbg/__45.html\n\nIf th
 e deadline is missed: If the default metering point operator misses the qu
 ota\, the Federal Network Agency can order measures under Sections 45(2) a
 nd 76 MsbG and enforce them with coercive fines of EUR 1\,000 to EUR 10 mi
 llion (Section 76(4) MsbG\, Section 94 EnWG). If the equipping of installa
 tions with control units falls short by at least 25 percent and this contr
 ibutes significantly to a possible threat to system security\, it can with
 draw the default responsibility under Section 12(2g) EnWG.
URL:https://www.innobu.com/en/deadline-calendar-energy-transition.html#roll
 out-quote-erzeuger-2032
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR